Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000498/LER-1987-001, Forwards LER 87-001-00 Re Inoperable Unit Vent Radiation Monitors.Determined That Tech Specs Not Violated & Rept Submitted as Voluntary LER23 September 1987Forwards LER 87-001-00 Re Inoperable Unit Vent Radiation Monitors.Determined That Tech Specs Not Violated & Rept Submitted as Voluntary LER
05000498/LER-1987-019, Forwards Rev 1 to LER 87-019 Re Slave Relay Surveillance Deficiency Due to Personnel Error.Rev Corrects Typo in Last Line of Addl Info Section,Changing Date from 870111 to 88011118 January 1988Forwards Rev 1 to LER 87-019 Re Slave Relay Surveillance Deficiency Due to Personnel Error.Rev Corrects Typo in Last Line of Addl Info Section,Changing Date from 870111 to 880111
05000498/LER-1988-004, Forwards LER 88-004-00 Re 880110 ESF Actuation Due to Loose or Corroded Toxic Gas Monitor Computer Board Electrical Connection.Suppl to LER Will Be Submitted Upon Completion of Evaluation of Root Cause by 8803099 February 1988Forwards LER 88-004-00 Re 880110 ESF Actuation Due to Loose or Corroded Toxic Gas Monitor Computer Board Electrical Connection.Suppl to LER Will Be Submitted Upon Completion of Evaluation of Root Cause by 880309
05000498/LER-1988-016, Forwards LER 88-016-00 in Response to NRC Re Violations Noted in Insp Rept 50-498/88-01 Concerning Feedwater Flow Transmitters.Violation Fully Addressed as LER Subj.Corrective Actions Completed & Reviewed by NRC14 October 1988Forwards LER 88-016-00 in Response to NRC Re Violations Noted in Insp Rept 50-498/88-01 Concerning Feedwater Flow Transmitters.Violation Fully Addressed as LER Subj.Corrective Actions Completed & Reviewed by NRCHydrostatic
05000498/LER-1988-035, Forwards Rev 1 of LER 88-035,revising Two Corrective Actions,Per Insp Repts10 June 1992Forwards Rev 1 of LER 88-035,revising Two Corrective Actions,Per Insp ReptsStroke time
Missed surveillance
05000498/LER-1988-052, Discusses Effects of Westinghouse Generic RCS Flow Anomaly, Per LER 88-052,Rev 1.Util Will Reevaluate DNB Ratio Using WRB-1 Correlation Prior to Unit Refueling in Summer.Interim RCS Flow Requirments of 40,000 Gpm Will Be Mainta1 March 1989Discusses Effects of Westinghouse Generic RCS Flow Anomaly, Per LER 88-052,Rev 1.Util Will Reevaluate DNB Ratio Using WRB-1 Correlation Prior to Unit Refueling in Summer.Interim RCS Flow Requirments of 40,000 Gpm Will Be Maintained
05000498/LER-1988-063, Forwards Rev 1 to LER 88-063 Re Failure to Install Vortex Breakers in Containment Emergency Sumps12 April 1989Forwards Rev 1 to LER 88-063 Re Failure to Install Vortex Breakers in Containment Emergency Sumps
05000498/LER-1989-017, Informs NRC of Change to Commitment Made as Result of LER 89-017 Re Event Involving Inadvertent Contamination of Nonradioactive Sys on 890814.Mods 89228,89229,89239 & 89231 No Longer Necessary.Justification Included10 April 1992Informs NRC of Change to Commitment Made as Result of LER 89-017 Re Event Involving Inadvertent Contamination of Nonradioactive Sys on 890814.Mods 89228,89229,89239 & 89231 No Longer Necessary.Justification IncludedOffsite Dose Calculation Manual
05000498/LER-1990-022, Forwards LER 90-022 Which Fully Addresses Violation 9031-1 in 901101 Notice of Violation Re Insps 50-498/90-31 & 50-499/90-3130 November 1990Forwards LER 90-022 Which Fully Addresses Violation 9031-1 in 901101 Notice of Violation Re Insps 50-498/90-31 & 50-499/90-31
05000498/LER-1991-014, Forwards LER 91-014-02 Re Erratic Containment Extended Range Pressure Channel Output.Suppl Provides Results of Util Evaluation of Failure Rate of safety-related Barton Model 752 Transmitters in pressure-related Applications15 January 1992Forwards LER 91-014-02 Re Erratic Containment Extended Range Pressure Channel Output.Suppl Provides Results of Util Evaluation of Failure Rate of safety-related Barton Model 752 Transmitters in pressure-related Applications
05000498/LER-1992-003, Informs That Violation 9205-01 Re Failure to Follow Procedures During RCS Flow Transmitter Restoration Addressed as Subj of Encl LER 92-003.Util in Full Compliance & Appropriate Actions Being Taken to Prevent Recurrence4 May 1992Informs That Violation 9205-01 Re Failure to Follow Procedures During RCS Flow Transmitter Restoration Addressed as Subj of Encl LER 92-003.Util in Full Compliance & Appropriate Actions Being Taken to Prevent Recurrence
05000498/LER-1992-005, Responds to Violations Noted in Insp Repts 50-498/92-15 & 50-499/92-15.Corrective Actions:Written Policy Developed to Emphasize That Safety Equipment Manipulations Must Be Governed by Guidance.Response Taken from LER 92-0054 September 1992Responds to Violations Noted in Insp Repts 50-498/92-15 & 50-499/92-15.Corrective Actions:Written Policy Developed to Emphasize That Safety Equipment Manipulations Must Be Governed by Guidance.Response Taken from LER 92-005Stroke time
05000498/LER-1992-018, Forwards Rev 1 to Voluntary LER 92-018 Re Pressurizer Safety Valve (Psv) & MSSV Setpoints Outside Required Tolerance.Rev Incorporates Info Re MSSV & Psv Setpoints Found Out of Tolerance During Past Outages14 February 1995Forwards Rev 1 to Voluntary LER 92-018 Re Pressurizer Safety Valve (Psv) & MSSV Setpoints Outside Required Tolerance.Rev Incorporates Info Re MSSV & Psv Setpoints Found Out of Tolerance During Past Outages
05000498/LER-1993-005, Forwards Rev 1 to LER 93-005,in Which Sdg 13 Failed to Start Due to Lack of Application of Proper Work Process Controls Painting Procedures23 November 1993Forwards Rev 1 to LER 93-005,in Which Sdg 13 Failed to Start Due to Lack of Application of Proper Work Process Controls Painting Procedures
05000498/LER-1993-023, Forwards Rev 1 to LER 93-023 Re Inadvertent ESF Actuation of Sdg 12 During Testing.Event Did Not Have Adverse Effect on Health & Safety of Public.Rev Incorporates Addl C/As Being Implemented to Minimize Inadvertent Starts of Sd31 March 1994Forwards Rev 1 to LER 93-023 Re Inadvertent ESF Actuation of Sdg 12 During Testing.Event Did Not Have Adverse Effect on Health & Safety of Public.Rev Incorporates Addl C/As Being Implemented to Minimize Inadvertent Starts of Sdgs
05000498/LER-1994-003, Forwards Rev 1 to LER 94-003 Re Inoperable Tornado Damper. Rev Corrects Info Provided in Rev 0 of LER 94-003 Re Notification to NRC6 May 1994Forwards Rev 1 to LER 94-003 Re Inoperable Tornado Damper. Rev Corrects Info Provided in Rev 0 of LER 94-003 Re Notification to NRC
05000498/LER-1994-005, Forwards LER 94-005,rev 2,re Inadvertent test-mode Starts of Standby DGs14 February 1995Forwards LER 94-005,rev 2,re Inadvertent test-mode Starts of Standby DGs
05000498/LER-1994-008, Forwards Errata Sheet for Abstract Page of LER 94-008.W/o Stated Encl14 February 1995Forwards Errata Sheet for Abstract Page of LER 94-008.W/o Stated EnclGrace period
05000498/LER-1994-012, Forwards Review of Accident Sequence Precursor Analysis for LER 94-012 Re Operational Event Discovered at Stp,Unit 1 on 940311,Unit 1 Daily Summary from 920910-940415,DG Starts Log & Generic Implications of Event16 May 1995Forwards Review of Accident Sequence Precursor Analysis for LER 94-012 Re Operational Event Discovered at Stp,Unit 1 on 940311,Unit 1 Daily Summary from 920910-940415,DG Starts Log & Generic Implications of EventMission time
Time to boil
05000498/LER-1994-014, Forwards LER 94-014 Re Failure to Meet Requirements of TS Due to Failure to Perform ASME Section XI Test on Standby DG Starting Air Receiver Inlet Check Valves14 March 1995Forwards LER 94-014 Re Failure to Meet Requirements of TS Due to Failure to Perform ASME Section XI Test on Standby DG Starting Air Receiver Inlet Check Valves
05000498/LER-1994-019, Forwards LER 94-019-01,removing Commitment to Revise SI Actuation & Response Time Test Surveillance Procedure to Include spin-up Time for Fuel Handling Bldg HVAC Sys14 April 1997Forwards LER 94-019-01,removing Commitment to Revise SI Actuation & Response Time Test Surveillance Procedure to Include spin-up Time for Fuel Handling Bldg HVAC Sys
05000498/LER-1995-003, Forwards LER 95-003 Re MSSV & Pressurizer Safety Valve Setpoints Discovered Outside Required Tolerances29 March 1995Forwards LER 95-003 Re MSSV & Pressurizer Safety Valve Setpoints Discovered Outside Required Tolerances
05000498/LER-1995-004, Forwards LER 95-004 Re Failure to Meet Requirements of TSs Due to Not Testing One Contact of Load Sequencer Relay26 April 1995Forwards LER 95-004 Re Failure to Meet Requirements of TSs Due to Not Testing One Contact of Load Sequencer Relay
05000498/LER-1995-005, Forwards LER 95-005 Re Failure to Meet Requirements of TSs Due to Inoperability of Standby Diesel Generator as Result of Failed Lug8 May 1995Forwards LER 95-005 Re Failure to Meet Requirements of TSs Due to Inoperability of Standby Diesel Generator as Result of Failed Lug
05000498/LER-1995-006, Forwards LER 95-006 Re Failure to Meet Requirements of TS Due to Not Performing Required Surveillance on H Recombiner22 May 1995Forwards LER 95-006 Re Failure to Meet Requirements of TS Due to Not Performing Required Surveillance on H Recombiner
05000498/LER-1995-007, Forwards LER 95-007 Re Seismic Monitor Inoperable for Greater than 30 Days & Subsequent Failure to Submit Special Rept as Required by TS17 August 1995Forwards LER 95-007 Re Seismic Monitor Inoperable for Greater than 30 Days & Subsequent Failure to Submit Special Rept as Required by TS
05000498/LER-1997-001, Forwards Rev to LER 97-001 Re Failure to Meet Requirements of TS Surveillance Requirements 4.7.13 for Ensuring Monitored Areas Meet Temp Limits25 September 1997Forwards Rev to LER 97-001 Re Failure to Meet Requirements of TS Surveillance Requirements 4.7.13 for Ensuring Monitored Areas Meet Temp Limits
05000498/LER-1997-006, Forwards LER 97-006-01 Re Failure to Comply W/Ts Surveillance Requirements Due to Inappropriate Surveillance Procedure Monitoring Parameters.No Adverse Effect on Health & Safety of Public Noted as Result of Condition9 April 1998Forwards LER 97-006-01 Re Failure to Comply W/Ts Surveillance Requirements Due to Inappropriate Surveillance Procedure Monitoring Parameters.No Adverse Effect on Health & Safety of Public Noted as Result of Condition
05000498/LER-1997-009, Forwards Rev 1 to LER 97-009 Re MSSV Setpoints Found Outside Required Tolerances.Another Suppl to LER Will Be Submitted to NRC by 980801 to Discuss Results of Root Cause Investigation4 May 1998Forwards Rev 1 to LER 97-009 Re MSSV Setpoints Found Outside Required Tolerances.Another Suppl to LER Will Be Submitted to NRC by 980801 to Discuss Results of Root Cause Investigation
05000498/LER-1997-010, Forwards LER 97-010-01 Re Discovery of MSSVs Not Meeting Required Relief Capacity.Event Did Not Have Adverse Effect on Health & Safety of Public.Corrective Actions Listed in Attachment to Ltr Are Only Licensing Commitments in R18 August 1998Forwards LER 97-010-01 Re Discovery of MSSVs Not Meeting Required Relief Capacity.Event Did Not Have Adverse Effect on Health & Safety of Public.Corrective Actions Listed in Attachment to Ltr Are Only Licensing Commitments in Rept
05000498/LER-1997-011, Forwards LER 97-011-00 Re Pressurizer Safety Valve Setpoints Discovered Outside Required Tolerances.Corrective Action Listed in LER Is Only Commitment in Rept20 November 1997Forwards LER 97-011-00 Re Pressurizer Safety Valve Setpoints Discovered Outside Required Tolerances.Corrective Action Listed in LER Is Only Commitment in Rept
05000498/LER-1997-012, Forwards LER 97-012-00,re Reactor Trip Due to Overtemperature/Delta Temperature Actuation10 December 1997Forwards LER 97-012-00,re Reactor Trip Due to Overtemperature/Delta Temperature Actuation
05000498/LER-1997-013, Forwards LER 97-013-01,re Failure to Meet TS Leak Rate Requirements for Supplementary Containment Purge Supply Isolation Valve16 April 1998Forwards LER 97-013-01,re Failure to Meet TS Leak Rate Requirements for Supplementary Containment Purge Supply Isolation Valve
05000498/LER-1998-001, Forwards LER 98-001-00 Re Failure to Perform an Adequate TS Surveillance Re Containment Structural Integrity.Licensee Commitments Are Found in CA Section23 February 1998Forwards LER 98-001-00 Re Failure to Perform an Adequate TS Surveillance Re Containment Structural Integrity.Licensee Commitments Are Found in CA Section
05000498/LER-1998-002, Forwards LER 98-002-00 Re Condition Outside of Plant Design Basis.Commitments Made within Ltr,Encl5 March 1998Forwards LER 98-002-00 Re Condition Outside of Plant Design Basis.Commitments Made within Ltr,Encl
05000498/LER-1998-003, Forwards LER 98-003-00,re Failure to Fully Meet Requirements of TSs Due to Inoperable CR Makeup & Cleanup Filtration Sys Exceeding Aot.Corrective Action Listed in Encl Is Only Licensee Commitment in Rept5 August 1998Forwards LER 98-003-00,re Failure to Fully Meet Requirements of TSs Due to Inoperable CR Makeup & Cleanup Filtration Sys Exceeding Aot.Corrective Action Listed in Encl Is Only Licensee Commitment in Rept
05000498/LER-1998-004, Forwards LER 98-004-00 Re Entry Into TS 3.0.3 for Inoperable Fuel Handling Bldg Exhaust Ventilation Sys.Event Did Not Have Adverse Effect on Health & Safety of Public1 June 1998Forwards LER 98-004-00 Re Entry Into TS 3.0.3 for Inoperable Fuel Handling Bldg Exhaust Ventilation Sys.Event Did Not Have Adverse Effect on Health & Safety of Public
05000498/LER-1998-005, Forwards LER 98-005-00 Re Failure to Fully Meet Requirements of TS Surveillance 4.5.1.1 for Verifying ECCS Accumulator Volume & Pressure.Corrective Actions Listed in Attachment to Ltr Are Only Licensee Commitments in Rept2 September 1998Forwards LER 98-005-00 Re Failure to Fully Meet Requirements of TS Surveillance 4.5.1.1 for Verifying ECCS Accumulator Volume & Pressure.Corrective Actions Listed in Attachment to Ltr Are Only Licensee Commitments in Rept
05000498/LER-1998-006, Forwards LER 98-006-01,re Failure to Fully Meet Requirements of TS Surveillance 4.0.5 for Containment Isolation Check Valves.Commitments Made by Util Are in Corrective Actions Section of LER14 October 1998Forwards LER 98-006-01,re Failure to Fully Meet Requirements of TS Surveillance 4.0.5 for Containment Isolation Check Valves.Commitments Made by Util Are in Corrective Actions Section of LER
05000498/LER-1998-007, Forwards LER 98-007-00,re Failure to Fully Meet Requirements of TS Surveillance 4.0.5 for Quarterly Surveillance Turbine Driven Afp.Commitments Made by Util Are in Corrective Action Section of LER14 October 1998Forwards LER 98-007-00,re Failure to Fully Meet Requirements of TS Surveillance 4.0.5 for Quarterly Surveillance Turbine Driven Afp.Commitments Made by Util Are in Corrective Action Section of LER
05000498/LER-1998-008, Forwards LER 98-008-00,re Inoperable Rod Control Demand Step Counters.Commitments Made by Util Are in Corrective Actions Section of LER14 October 1998Forwards LER 98-008-00,re Inoperable Rod Control Demand Step Counters.Commitments Made by Util Are in Corrective Actions Section of LER
05000498/LER-1998-009, Forwards LER 98-009-00,re Failure to Meet TS SR 4.6.1.5 for Containment Average Air Temp.Commitments Made by Util Are in Corrective Actions Section of Encl23 October 1998Forwards LER 98-009-00,re Failure to Meet TS SR 4.6.1.5 for Containment Average Air Temp.Commitments Made by Util Are in Corrective Actions Section of Encl
05000498/LER-1999-001, Forwards LER 99-001-00,re RHR Sys Being Outside Design Basis.Commitments Made Are Found in Corrective Action Section of Attachment12 April 1999Forwards LER 99-001-00,re RHR Sys Being Outside Design Basis.Commitments Made Are Found in Corrective Action Section of Attachment
05000498/LER-1999-002, Forwards LER 99-002-00,re Inadequate Performance of TS Surveillance When Evaluating Source Range Nuclear Instrument Discriminator Bias Curve Results.Corrective Action Section of LER Lists Commitments26 April 1999Forwards LER 99-002-00,re Inadequate Performance of TS Surveillance When Evaluating Source Range Nuclear Instrument Discriminator Bias Curve Results.Corrective Action Section of LER Lists Commitments
05000498/LER-1999-003, Forwards LER 99-003-00,re Unit 1 CR HVAC Being Placed in Filtered Recirculation Mode of Operation Instead of Recirculation & make-up Filtration Mode.Commitments Made by Util Are in Corrective Action Section of LER28 April 1999Forwards LER 99-003-00,re Unit 1 CR HVAC Being Placed in Filtered Recirculation Mode of Operation Instead of Recirculation & make-up Filtration Mode.Commitments Made by Util Are in Corrective Action Section of LER
05000498/LER-1999-005, Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER17 June 1999Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER
05000498/LER-1999-006, Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER26 July 1999Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER
05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER13 September 1999Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LERTime of Discovery
05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER12 October 1999Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER
05000499/LER-1990-008, Forwards LER 90-008-01 Re Plant Shutdown Due to Primary Leakage from Steam Generator Bowl Drain Assembly.Initial Corrective Actions Re Permanent Design Change for Drain Valves May Be Reconsidered17 January 1991Forwards LER 90-008-01 Re Plant Shutdown Due to Primary Leakage from Steam Generator Bowl Drain Assembly.Initial Corrective Actions Re Permanent Design Change for Drain Valves May Be Reconsidered