Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20029D845 | 29 April 1994 | Forwards Responses to NRC Request for Addl Info on Simplified BWR Design.Encl Withheld (Ref 10CFR2.790) | |
ML20044G858 | 28 May 1993 | Forwards Response to NRC 930128 Request for Addl Info on Simplified BWR Design | |
ML20045E533 | 30 June 1993 | Forwards Remainder of Responses to RAIs on Sbwr Design,Per NRC 930128,0409 & 0528 Ltrs | Safe Shutdown Shutdown Margin Loop seal High Radiation Area Fire Barrier Tornado Missile Safe Shutdown Earthquake Weld Overlay Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Nondestructive Examination Squib VT-2 Incorporated by reference Tornado-Generated Missile Design basis earthquake Feedwater Controller Failure Earthquake Power-Operated Valves Fuel cladding Liquid penetrant Unidentified leakage |
ML20045E829 | 1 July 1993 | Forwards Draft Proprietary NEDC-32215P, Giraffe Passive Heat Removal Testing Program. Rept Withheld | |
ML20045G203 | 1 July 1993 | Forwards Outline for Tracg Course Taught at Ge.Ten Hr Required for Tracg Model Description & Qualification & Eight Hr Required for Tracg Input Description & Application | |
ML20046B227 | 28 July 1993 | Forwards Listed Proprietary Documents,In Response to Request for QA Documentation Re Sbwr Gist Testing,Per 930726 Telcon. Documents Withheld | |
ML20046C090 | 2 August 1993 | Informs of Organizational & Staffing Changes & Requests Updating of Svc List of Addresses Under 52-004 | |
ML20056C678 | 16 June 1993 | Informs That Several Quality Issues Were Discovered During 930610 Meeting Re Gist Test Program Conducted by GE Which Include Lack of Design of Info for Gist Facility & Discrepancies in Tracg Models Supplied by GE | |
ML20057C088 | 22 September 1993 | Advises That Je Leatherman Is Now Sbwr Licensing Manager. Jc Baechler Should Be Removed from Svc List | |
ML20057D108 | 30 September 1993 | Forwards GE Analysis Rept NEDO-32246, Geysering Instability Study for Sbwr | |
ML20057D234 | 19 August 1993 | Forwards Draft Version 1 of a Defense-in-Depth & Diversity Assessment of GE Sbwr Protection Sys. Document Satisfies Subtask 12.6 | |
ML20057E029 | 24 September 1993 | Forwards Partial Addl Info for Tracg Review,Per 930823 Request | |
ML20057F146 | 8 October 1993 | Forwards Response to RAI 900.1 Transmitted by NRC 930901 Re Sbwr Design | |
ML20058A682 | 11 November 1993 | Forwards Rev 0 to NEDC-32288,Scaling of SBWR-Related Test | |
ML20058A840 | 18 November 1993 | Forwards Slides Presented at 931116 Meeting W/Nrc in Rockville,Md to Present Response to NRC Findings on Gist | |
ML20058A880 | 18 November 1993 | Forwards Proprietary Response to NRC Findings on Gist & Gist Heat Loss.Encl Withheld | |
ML20058A903 | 5 November 1993 | Advise NRC Sbwr Design Certification Documents Will Be Consistent W/ Sbwr Units of Measure for Design | |
ML20058D176 | 24 November 1993 | Forwards Response to NRC 930928 Requests for Addl Info Re Sbwr Design | |
ML20058D195 | 24 November 1993 | Forwards Response to NRC 930928 Requests for Addl Info Re Sbwr Design | |
ML20058D210 | 18 November 1993 | Forwards Responses to Questions & Issues Posed by NRC During 931006 Telcon | |
ML20058F884 | 30 November 1993 | Forwards Response to NRC 931029 Questions 2 & 3 Re Technical Basis for Position on Use of lighter-than-air Noncondensible Gas in Std BWR Test Program & Date for Submittal of Technical Basis for Position Re Severe Accident | |
ML20058F899 | 30 November 1993 | Forwards GE Position That Isolation Condenser Testing Not Needed for Std BWR Certification | |
ML20058G396 | 2 December 1993 | Forwards Rev 0 to Draft NEDC-32301, Single Tube Condensation Test Program, in Response to Request for Addl Info | |
ML20058N889 | 19 October 1993 | Forwards Proprietary Response to Request for Addl Info on Sbwr Design.Encls Withheld,Per 10CFR2.790 | |
ML20058N902 | 19 October 1993 | Forwards Proprietary Rev 0 to NEDC-32215P, Giraffe Passive Heat Removal Testing Program. Rept Withheld | |
ML20058P152 | 16 December 1993 | Forwards Proprietary Response to NRC Findings on Gist, Per 931118 Notice of Nonconformance.Encl Withheld | |
ML20059A520 | 20 October 1993 | Forwards Responses to Questions Posed Prior to & During 931001 Meeting on Sbwr Testing Program | Hydrostatic Squib |
ML20059A537 | 20 October 1993 | Forwards Proprietary Response to Question Number 5 Posed During 931001 Meeting Re Sbwr Giraffe Testing Program. Response Withheld | |
ML20059A569 | 20 October 1993 | Forwards Diskette of GE Proprietary Gist Test Data as Requested During Purdue Testing Meeting.W/O Diskette | |
ML20059B687 | 19 October 1993 | Forwards Addl Info Per NRC 930820 Request Re Sbwr Design. Responses Are for RAI 950.1 - 950.16 & RAI 950.21 - 950.26. W/4 Oversized Encl | Hydrostatic Squib |
ML20059C301 | 29 October 1993 | Forwards GE 930111 & 0507 Ltrs Re Info Requested During 921217 Meeting on Sbwr Testing Program & Program Suppl to Sbwr Application for Design Certification & Test Spec 23A6999,Rev 1,in Response to NRC 931029 Telcon Request | |
ML20059C322 | 25 October 1993 | Forwards Response to NRC Request for Addl Info on Sbwr Design | |
ML20059D339 | 27 December 1993 | Forwards Draft Updated Section 17.3, Reliability Program During Design Phase, of Sbwr Ssar Contained in Attachment 1 to Ltr.Draft Based Upon Markups of Section 17.3 of Amend 31 of ABWR Ssar | |
ML20059G604 | 6 January 1994 | Forwards Response to RAI 900.46 Re Univ Condensation Testing Program,In Partial Fulfillment of 930915 RAIs on Sbwr Design | |
ML20059H688 | 17 January 1994 | Discusses Schedule for Response to NRC 940105 RAI on Sbwr Design | |
ML20059H690 | 17 January 1994 | Forwards Response to NRC 930915 Request for Addl Info on Simplified BWR Test Program | Loop seal |
ML20059J101 | 18 January 1994 | Forwards Proprietary Response to Request for Addl Info Re Simplified BWR Giraffe Test Program.Encl Withheld (Ref 10CFR2.790) | |
ML20062K571 | 16 December 1993 | Forwards GE Response to Questions & Comments from NRC & Purdue Univ Contractor During 931001 Meeting | Squib |
ML20062K573 | 13 December 1993 | Forwards GE Review of Lawrence Livermore Natl Lab Draft Rept Defense-in-Depth & Diversity Assessment of GE Sbwr Protection Sys Task 12 | Safe Shutdown Probabilistic Risk Assessment Squib |
ML20062K575 | 13 December 1993 | Responds to 931126 Request for Addl Info Re Simplified BWR Design | Probabilistic Risk Assessment |
ML20062K621 | 17 December 1993 | Responds to Nonconformances Noted in Insp Rept 52-004/93-01.Corrective Actions:Tracg Ecp Subjected to Level 2 Design Review for Independent Verification Per Engineering Operating Procedure 40-3.00 | |
ML20062K638 | 14 December 1993 | Forwards Draft Chapter 18 to Simplified BWR Ssar, Per 931006 Telcon.Apps 18A-D Not Included in Present Draft Since No Mod Necessary at Present Time | |
ML20062M201 | 29 December 1993 | Forwards Rev 0 to NEDC-32231, Design & Analysis Similarities Between ABWR & Sbwr, for Dec 1993 | |
ML20063C337 | 31 January 1994 | Forwards Response to Request for Addl Info on Simplified BWR Design | Safe Shutdown Half scram Post Accident Monitoring Probabilistic Risk Assessment Squib |
ML20063H553 | 4 February 1994 | Transmits Responses to Remaining Outstanding Open Items Re Sbwr Gist Test Program | |
ML20064C780 | 2 March 1994 | Forwards Rev 0 to NEDC-32301, Single Tube Condensation Test Program, in Response to NRC 930915 Request for Addl Info | |
ML20064D547 | 4 March 1994 | Requests Encl Listed Revs to Svc List | |
ML20064F625 | 24 February 1994 | Forwards Responses to RAIs Transmitted by NRC Re Sbwr Design.Draft Rept Entitled, Sbwr Containment Natural Aerosol Removal Also Encl | Safe Shutdown Fire Barrier Tornado Missile Earthquake Fuel cladding |
ML20064N489 | 23 March 1994 | Forwards Proprietary Addl Info Re Giraffe Facility Data.Encl Withheld (Ref 10CFR2.790) | |
ML20065C936 | 31 March 1994 | Forwards Response to Listed Requests for Addl Info Re Simplified BWR Design |