ML20057D108

From kanterella
Jump to navigation Jump to search
Forwards GE Analysis Rept NEDO-32246, Geysering Instability Study for Sbwr
ML20057D108
Person / Time
Site: 05200004
Issue date: 09/30/1993
From: Marriott P
GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20057D109 List:
References
MFN-155-93, NUDOCS 9310010117
Download: ML20057D108 (1)


Text

,

GE Nuclear Energy September 30,1993 MFN No.155-93 Docket STN 52 004 l

l Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ,

Attention: Richard Borchardt, Acting Director Standardization Project Directorate

Subject:

Submittal of GE Analysis Report (NEDO-32246) for Review and l Acceptance for Referencing j

Dear Mr. Borchardt,

GE Nuclear Energy is submitting, for review and approval for referencing in licensing actions, GE analysis report NEDO-32246, Geysering Instability Study for the SBMR, September 1993.

Three (3) hard copies are enclosed.

Sincerely, n .

/

N' P.W. Marriott l SBWR Project Manager M/C 781, (408) 925-6948 l

l I

cc: Melinda Malloy (NRC) )

Larry E. Phillips (NRC) i l

1 1

[ n

+ , ' Ds 'y 010015 T3) ,

9310010117 930930 PDR I  !

TOPRP EMVGENE  ? i' C PDR .