Forwards Rev 0 to NEDC-32301, Single Tube Condensation Test Program, in Response to NRC 930915 Request for Addl Info
ML20064C780
Person / Time
Site: 05200004
Issue date: 03/02/1994
From: Leatherman J
GENERAL ELECTRIC CO.
To: Borchardt R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20064C781 List:
References
MFN-023-94, MFN-23-94, NUDOCS 9403100216
Download: ML20064C780 (1)


Text

,. -

9 GE Nuclear Energy l

l ona ow amw 17b Cwiner kvuur San Jose CA %!25 I

March 2,1994 MFN No. 023 94 Docket No. STN 52-004 I

i 4

ll Document Control Desk j-U.S. Nuclear Regulatory Commission j

Washington, D.C. 20555 Attention:

Richard W. Borchardt, Director i

Standardization Project Directorate

Subject:

NRC Request for Additional Information (RAI) on the Simplllled 4

Bolling Water Reactor (SHWR) Design

Reference:

1.

Transmittal of Request for Additional Information (RAI) for the l

SBWR Design, Letter from M. Malloy to P. W. Marriott dated j

September 15,1993 l

]

2.

MFN No. 220-93, Same Subject, J. E. Leatherman to J. N. Wilson, December 2,1993 i

I 3.

W. R. Usry, " Single Tube Condensation Test Program," GE Document No. NEDC-32301, March,1994 l

In response to the Reference 1 letter request for transmittal of the " Single Tube Condensation i

Test Program," report as soon as it became available, GE submitted a draft copy of this report by way of Reference 2 in response to RAI 900.47. The purpose of this letter is to transmit the final copy of this report.

,l l

Sincerely, i

E fdd/65b

~

J. E. Leatherman Manager, SBWR Design Certification O,S' 3 'o f 4

MC-781, (408)925-2023

'J j

Enclosure:

1 Copy of Reference 3 cc: M. Mi.lloy, Project Manager (w/2 copies of Reference 3)

F. W. Hasselberg, Project Manager (w/1 copy of Reference 3) inax 944, 9403100216 940302 V

i a

PDR ADOCK 05200004 3

th PDR.