9 GE Nuclear Energy l
l ona ow amw 17b Cwiner kvuur San Jose CA %!25 I
March 2,1994 MFN No. 023 94 Docket No. STN 52-004 I
i 4
ll Document Control Desk j-U.S. Nuclear Regulatory Commission j
Washington, D.C. 20555 Attention:
Richard W. Borchardt, Director i
Standardization Project Directorate
Subject:
NRC Request for Additional Information (RAI) on the Simplllled 4
Bolling Water Reactor (SHWR) Design
Reference:
1.
Transmittal of Request for Additional Information (RAI) for the l
SBWR Design, Letter from M. Malloy to P. W. Marriott dated j
September 15,1993 l
]
2.
MFN No. 220-93, Same Subject, J. E. Leatherman to J. N. Wilson, December 2,1993 i
I 3.
W. R. Usry, " Single Tube Condensation Test Program," GE Document No. NEDC-32301, March,1994 l
In response to the Reference 1 letter request for transmittal of the " Single Tube Condensation i
Test Program," report as soon as it became available, GE submitted a draft copy of this report by way of Reference 2 in response to RAI 900.47. The purpose of this letter is to transmit the final copy of this report.
,l l
Sincerely, i
E fdd/65b
~
J. E. Leatherman Manager, SBWR Design Certification O,S' 3 'o f 4
MC-781, (408)925-2023
'J j
Enclosure:
1 Copy of Reference 3 cc: M. Mi.lloy, Project Manager (w/2 copies of Reference 3)