Discusses Schedule for Response to NRC 940105 RAI on Sbwr Design
ML20059H688
Person / Time
Site: 05200004
Issue date: 01/17/1994
From: Leatherman J
GENERAL ELECTRIC CO.
To: Borchardt R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
MFN-004-94, MFN-4-94, NUDOCS 9401310106
Download: ML20059H688 (4)


Text

V -

GENuclear Energy c,enew rwax cner 175 Cunner keme. San Jose. CA 95 US January 17,1994 MFN No. 004-94 Docket STN 52-004 Document Control Desk U.S. Nuclear Regulatory Commission .;

Washington DC 20555 [

4 Attention: Richard W. Borchardt, Director Standardization Project Directorate

Subject:

NRC Requests for Additional Information (RAls) on the Simplified Boiling Water Reactor (SBWR) Design

Reference:

Transmittal of Recuests for Additional Information (RAls) for the SBWR Design, Letter from M. Millov to P. W. Marriott dated January 5,1994.

We have received your reference letter transmitting 98 RAls which requested extremely short turn-around (responses) back to NRC. In order to be responsive to your request, we are using the SBWR/ABWR Similarities document, NEDC-32231, to reference previously supplied ,

answers on ABWR RAls. With that consideration, we expect to be able to answer 27 of the RAls as requested by January 31,1994. There are 12 questions which focus on plant reliability / availability as effected by non-safety equipment / systems; these questions will be answered when the SBWR Regulatory Treatment of Non-Safety Systems (RTNSS) analysis is completed mid-to-late this year. The remaining 59 questions wil be answered by March 31,1994.

See the attached table entitled I&C RAIs.

Sincerely,

)f ~

< (- tt $l5Mr i J. E. Leatherman SBWR Certification Manager MC-781, (408)925-2023 .

cc: M. Malloy, Project Manager (NRC) (2 attachments)

F. W. Hasselberg, Project Manager (NRC) (1 attachment) >

tuu ma j lJd

\

9401310106 940117 4 PDR ADOCK 05200004 h  !

A PDR &

'- - ]

MFN No. 004-94 Table I&C RAls RAI Number Resoonse Date Footnote 420.01 1/31/94 1

.02 1/31/94 1

.03 1/31/94 1

.04 3/30/94 '

.05 3/30/94 >

.06 1/31/94 1

.07 3/30/94

.08abc 3/30/94

.08de Summer '94 2

.09 1/31/94 1 ,

.10 1/31/94 1

.11 '1/31/94 1 ';

.12 Summer '94 1, 2 '

.13 Summer '94 2

.14 3/30/94 ,'

.15 3/30/94

.16 3/30/94 i

.17 1/31/94 1 -!

.18 3/30/94

.19 3/30/94

.20 Summer '94 2

.21 3/30/94 i

.22 3/30/94

.23 Summer '94 2

.24 3/30/94  ;

.25 3/30/94 ,

.26 3/30/94 l

.27 3/30/94  !

.28 3/30/94 )

.29 3/30/94  ;

.30 3/30/94 31 3/30/94  ;

32 3/30/94 33 3/30/94

.34 1/31/94 1

.35 3/30/94 ,

.36 3/30/94 l

.37 Summer '94 2 i

.38 1/31/94

.39 1/31/94

.40 1/31/94

.41 3/30/94

.42 3/30/94

.43 3/30/94

.44 - 3/30/94

1. NEDC32231
2. SBWR/RTNSS  !

nux = =

l

.i 4

~ '

MFN No. 004-94 Table I&C RAls  !

RAI Number Response Date Footnote 420.45 3/30/94

.46 3/30/94 ';

.47 3/30/94  ;

.48 3/30/94

.49 3/30/94

.50 Summer '94 1, 2  ;

.51 3/30/94

.52 3/30/94

.53 3/30/94 'l

.54 3/30/94

.55 3/30/94

.56 3/30/94 l

.57 3/30/94

.58 3/30/94

.59 3/30/94  !

.60 3/30/94 )

.61 3/30/94

.62 3/30/94 i

.63 3/30/94

.64 3/30/94

.65 1/31/94 .,

.66 3/30/94  !

.67 1/31/94

.68 Summer '94 2 ,

.69 3/30/94

.70 Summer '94 2

.71 3/30/94 i

.72 Summer '94 2

.73 3/30/94

.74 3/30/94

.75 Summer '94 2  ;'

.76 1/31/94

.77 1/31/94

.78 1/31/94 -'

.79 1/31/94-

.80 1/31/94

.81 3/30/94

.82 ' 1/31/94

.83 Summer '94 2

.84 3/30/94 .

.85 3/30/94

.86 3/30/94

.87 3/30/94

1. NEDC 32231
2. SBWR/RTNSS LTRhK 94-02 U __

MFN No. 004-94 Table I&C RAls RAI Number Response Date Footnote 420.88 3/30/94

.89 3/30/94

.90 3/30/94

.91 1/31/94 l

.92 1/31/94

.93 1/31/94

.94 1/31/94 95 3/30/94

.96 1/31/94

.97 1/31/94

.98 1/31/94 I

f i

i

1. NEDC32231  !
2. SBWR/RTNSS ,

LTRBK 94-02 i