Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17187A804 | 28 February 1994 | Containment Analysis of DBA-LOCA to Update Design Basis for Lpci/Ccs, for GENE-637-042-1193 | |
ML17193A708 | 30 November 1980 | SEP Review of NRC Safety Topic VI-7.A.3 Associated W/ Electrical,Instrumentation & Control Portions of ECCS Actuation Sys. | Scram Discharge Volume Fuel cladding Coast down |
ML17194A372 | 31 December 1981 | Control Room Habitability Study for Quad Cities 1 & 2, Final Rept | |
ML17202L288 | 29 June 1990 | II Upper Vessel Contract Variation Review. | |
ML18041A125 | 14 September 1984 | Rev 4 to, 180-Day Rept in Response to IE Bulletin 80-11 for Dresden Nuclear Power Station Units 2 & 3. | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Tornado Generated Missile Earthquake |
ML19270G936 | 21 April 1979 | Reactor Containment Bldg Integrated Leak Rate Test for 790421-23 | |
ML19339A532 | 1 November 1980 | Vol 1, Environ Qualification of Electrical Equipment. | |
ML19339A536 | 1 November 1980 | Vol 2, Environ Qualification of Electrical Equipment. | Scram Discharge Volume |
ML19339D024 | 30 November 1980 | SEP Review of NRC Safety Topic VI-10.A Associated W/ Electrical,Instrumentation & Control Portions of Testing of Reactor Trip Sys & Engineered Safety Features,Including Response Time. | Coast down |
ML19339D026 | 30 November 1980 | SEP Review of NRC Safety Topic VII-2 Associated W/ Electrical,Instrumentation & Control Portions of Engineered Safety Features Sys Control Logic & Design. | |
ML19344E483 | 14 May 1980 | Evaluation of 18-Inch Containment Isolation Valves for Dresden Station,Units 2 & 3 & Quad Cities Station,Units 1 & 2. | |
ML19351D813 | 1 November 1980 | Vol 1 of Revision 1 to Response to IE Bulletin 79-01B for Dresden Nuclear Power Station,Unit 3. | |
ML19351D817 | 1 November 1980 | Vol 2 of Revision 1 to Response to IE Bulletin 79-01B for Dresden Nuclear Power Station,Unit 3. | Boric Acid |
ML19351D823 | 1 November 1980 | Vol 3 of Revision 1 to Response to IE Bulletin 79-01B for Dresden Nuclear Power Station,Unit 3. | |
ML19351D825 | 1 November 1980 | Vol 1,Revision 1 to Response to IE Bulletin 79-01B for Quad Cities Nuclear Power Station,Units 1 & 2. | |
ML19351D829 | 1 November 1980 | Vol 2 of Revision 1 to Response to IE Bulletin 79-01B for Quad Cities Nuclear Power Station,Units 1 & 2. | Boric Acid |
ML19351D833 | 1 November 1980 | Vol 3 of Revision 1 to Response to IE Bulletin 79-01B for Quad Cities Nuclear Power Station,Units 1 & 2. | |
ML19351D838 | 1 November 1980 | Vol 4 of Revision 1 to Response to IE Bulletin 79-01B for Quad Cities Nuclear Power Station,Units 1 & 2. | Boric Acid |
ML19351D844 | 1 November 1980 | Vol 5 of Revision 1 to Response to IE Bulletin 79-01B for Quad Cities Nuclear Power Station,Units 1 & 2. | Boric Acid Half scram Squib |
ML20002A134 | 1 November 1980 | Vol 3, Environ Qualification of Electrical Equipment. | Boric Acid |
ML20038B939 | 23 November 1981 | 180-day Rept in Response to IE Bulletin 80-11. | Safe Shutdown Earthquake Operating Basis Earthquake Tornado Generated Missile Earthquake |
ML20038B941 | 23 November 1981 | 180-day Rept in Response to IE Bulletin 80-11. | Safe Shutdown Earthquake Operating Basis Earthquake Tornado Generated Missile Earthquake |
ML20039C404 | 31 December 1981 | Control Room Habitability Study for Dresden 2 & 3, Final Rept | |
ML20040D776 | 15 January 1982 | 180-Day Rept in Response to IE Bulletin 80-11 for Dresden Nuclear Power Station,Units 2 & 3. | |
ML20040D780 | 15 January 1982 | 180-Day Rept in Response to IE Bulletin 80-11 for Quad Cities Nuclear Power Station,Units 1 & 2. | |
ML20054H280 | 19 May 1982 | Impact Effects on Spent Fuel Pool Slab | |
ML20059B855 | 29 August 1989 | LOCA-ECCS Analysis Single Failure Diesel Generator. Related Info Encl | FLEX |
ML20062J404 | 1 March 1975 | Reactor Pressure Vessel Surveillance Program:Capsule Basket 2,Capsule Basket 3 & Neutron Dosimeter Monitor | |
ML20062J407 | 19 September 1975 | Reactor Pressure Vessel Surveillance Program:Capsule Basket 12 & Capsule Basket 13 | Hydrostatic |
ML20062J410 | 31 May 1975 | Mechanical Properties of Irradiated Reactor Vessel Material Surveillance Specimens | |
ML20063H048 | 27 July 1982 | SEP Topic III-5.A,High Energy Pipe Breaks Inside Containment, Revised Draft Interim Progress Rept | Finite Element Analysis Through-Wall Leak |
ML20067B492 | 4 February 1991 | Nonproprietary Fracture Toughness Evaluation of Shell Side Lpcis Heat Exchanger for Dresden Station - Unit 2 | Finite Element Analysis |
ML20072A476 | 9 May 1983 | Rev 3 to 180-Day Rept in Response to IE Bulletin 80-11 for Dresden 2 & 3 & Quad Cities 1 & 2 | |
ML20072K817 | 31 May 1983 | Rev 0 to Dresden Nuclear Power Station,Units 2 & 3,Plant- Unique Analysis Rept,Vol 3,Vent Sys Analysis | Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake |
ML20072N827 | 31 May 1983 | Plant-Unique Analysis Rept,Vol 1,General Criteria & Methodology | Safe Shutdown Earthquake Earthquake |
ML20072N843 | 31 May 1983 | Plant Unique Analysis Rept,Vol 2,Suppression Chamber Analysis | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Design basis earthquake Earthquake |
ML20072N854 | 31 May 1983 | Plant Unique Analysis Rept,Vol 3,Vent Sys Analysis | Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake |
ML20072N877 | 31 May 1983 | Plant Unique Analysis Rept,Vol 4,Internal Structures Analysis | Safe Shutdown Earthquake Operating Basis Earthquake |
ML20072N898 | 27 June 1983 | Plant Unique Analysis Rept, Vol 5,Safety Relief Valve Discharge Piping Analysis | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Finite Element Analysis |
ML20072N925 | 31 May 1983 | Plant Unique Analysis Rept,Vol 6,Unit 1 Torus Attached Piping & Suppression Chamber Penetration Analysis | |
ML20072N953 | 31 May 1983 | Plant Unique Analysis Rept,Vol 7,Unit 2 Torus Attached Piping & Suppression Chamber Penetration Analysis | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake FLEX Design basis earthquake Earthquake |
ML20076L186 | 30 September 1982 | Rev 1 to Improved Dynamic Vacuum Breaker Valve Response for Quad Cities 1 & 2 | |
ML20077C392 | 18 June 1983 | Rev 00 to Dresden 2 Main Steam Monitoring Procedure Test- Analysis Correlation | Finite Element Analysis |
ML20079B654 | 12 July 1988 | Nuclear Safety-Related,Containment Cooling Svc Water Pump Room Cooler Heat Load Study, for Plants | |
ML20080A921 | 27 December 1983 | Rev 4 to Control Rod Sequence Package | |
ML20082A693 | 31 March 1991 | Structural Evaluation of Com Ed BWR Reactor Pressure Vessel Head Stud Cracking | Hydrostatic |
ML20084F883 | 31 August 1973 | Special Rept 33, Final Flood Protection Measures (Permanent Flood Protection of Containment Cooling Svc Water Pumps & Diesel Generator Cooling Water Pumps) | Design basis earthquake Earthquake Coast down |
ML20084G682 | 9 May 1972 | Torus Coating Insp on Dresden 2 Reactor, Rept 17 | |
ML20084U063 | 31 August 1973 | Special Rept 33, Final Flood Protection Measures (Permanent Flood Protection of Containment Cooling Svc Water Pumps & Diesel Generator Cooling Water Pumps) | |
ML20084U132 | 3 June 1972 | Special Rept of 720504 Incident |