Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML0131101792 October 2001Detroit Edison, Fermi 2, Revision 12 to EP-220, Personnel Monitoring and Radiological Emergency Teams.
ML02045030529 January 2002Transmittal of Revised RERP Plan Implementing Procedure EP-301-01 (Revision 15) for Fermi 2Health Physics Network
ML02064046313 February 2002Revision 27 to EP-101, Classification of Emergencies.Safe Shutdown
Internal Flooding
Earthquake
Pressure Boundary Leakage
Power change
ML02164013514 May 2002Transmittal of Fermi 2 Revised RERP Plan Implementing Procedure Index (Revision 9)
ML0217105927 June 2002Revised RERP Plan Implementing ProceduresGrab sample
Met Tower
ML02275027220 September 2002RERP Plan Implementing ProcedureGrab sample
ML02338065125 November 2002RERP Plan Implementing ProcedureMet Tower
ML03027027410 January 2003Detroit Edison - Fermi 2, Revision 1 to EP-29002, Plant Contact Information and Release/Offsite Dose Data.Met Tower
ML03042032330 January 2003RERP Plan Implementing Procedure EP-402, Revision 20
ML03065091124 February 2003RERP Plan Implementing Procedure
ML03070030427 February 2003Emergency Plan Implementing ProcedureHigh Radiation Area
ML0307604525 March 2003EP-225, Rev. 6, Radiological Medical Emergencies.
ML03093042220 March 2003Revised Epips, Including Rev. 28 to EP-101, Rev. 19 to EP-205-01 & Rev. 15 to EP-530Safe Shutdown
Internal Flooding
Earthquake
Pressure Boundary Leakage
Power change
ML0310504072 April 2003Transmittal of Revisions to Emergency Plan Implementing ProceduresMet Tower
ML0310603568 April 2003RERP Plan Implementing Procedure
ML03175076818 June 2003Revised RERP Plan Implementing ProceduresHealth Physics Network
Grab sample
Offsite Dose Calculation Manual
ML0319804248 July 2003Revision 2 to EP-290005, Hospital Support Request Form
ML03246124319 August 2003Transmittal of Fermi 2 Emergency Plan Implementing Plan Procedure EP-530, Revision 16Earthquake
ML0332302376 November 2003RERP Plan Implementing Procedure, EP-608, Revision 10
ML04014075329 December 2003Revision 12 to EP-225, Radiological Medical Emergencies, and Revision 2 to EP-290004, Ambulance/Paramedic Support Request Form.
ML04037062921 January 2004Revision 12 to EP-304-01, Alternate Emergency Operations Facility.
ML04040004529 January 2004Revision 13 to EP-220, Revision 42 to EP-290, and Revision 25 to EP-292
ML0407906939 March 2004Revision 3 to EP-290002, Nuclear Plant Event Technical Data Form.Met Tower
ML04090047018 March 2004Revision 29 to EP-101, Classification of Emergencies.Safe Shutdown
Internal Flooding
Earthquake
Pressure Boundary Leakage
Power change
ML04118056319 April 2004RERP Plan Implementing Procedure
ML05326046914 December 2004Enclosure C, Section J, Protective Response, of the Fermi II Radiological Emergency Response Plan, Fermi 2 RERP Plan Implementing Procedure, Protective Action Recommendations, Fermi 2 RERP Plan Implementing Procedure, Assembly & AccountabilGrab sample
Offsite Dose Calculation Manual
Earthquake
ML08219052125 July 2008Transmittal of Final Report for the Radiological Emergency Preparedness (REP) Partial Participation Plume Exposure Pathway Exercise Conducted on May 20, 2008Deep Dose Equivalent
ML16036A05126 January 2016Revision 41 to EP-101, Classification of Emergencies and Revision 26 to EP-545, Protective Action RecommendationsSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Earthquake
Fuel cladding
Pressure Boundary Leakage
Pressure boundary leak
Grace period
ML16041A26826 January 2016Revision 9 EP-290001, Nuclear Plant Event Notification Form
ML16057A19610 February 2016Procedures for Index List of All Current Active RERP
NRC-10-0001, Request for Revision 1 to Radiological Emergency Response Preparedness Plan to Change Staff Augmentation Times24 September 2010Request for Revision 1 to Radiological Emergency Response Preparedness Plan to Change Staff Augmentation TimesHigh Radiation Area
Offsite Dose Calculation Manual
NRC-15-0040, Emergency Preparedness Phase 2 Staffing Assessment17 April 2015Emergency Preparedness Phase 2 Staffing AssessmentSafe Shutdown
High winds
High Radiation Area
Ultimate heat sink
FLEX
Fukushima Dai-Ichi
Minimum staff