ML16057A196
| ML16057A196 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 02/10/2016 |
| From: | Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML16057A196 (7) | |
Text
DETROIT EDISON -
FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 02/10/16 TO: 00935 US NRC DOCUMENT CNTRL DESK WASHINGTON, DC 20555 PAGE 1
Media:
S 1/2 X 11 Number Cnt Issue DTC Doc.
Serial Number Page Rev Copies Lvi Date Sec Status TPEPT EP RERP PROCEDURE INDEX 16 1
ST 02/10/16 AFC Please destroy or mark all revised, superseded, or cancelled documents as such.
CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166.
(734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: u28076
Fermi 2 RERP Plan Implementing Procedures Index Revision 16 Page 1 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX BOOK NO. 1 NOTE: This Index lists all current active RERP Implementing Procedures. It does not reflect actual contents of this manual. The distribution list for the indicated recipient describes the actual content.
EP No.
Title 100 Series Classifications of Emergencies and Control of Emergency Response 101 102 103 104 105 110 Classification of Emergencies Unusual Event Alert Site Area Emergency General Emergency Organization and Responsibilities m SThOLLE~
Fermi 2 RERP Plan Implementing Procedures Index Revision 16 Page 2 EP No.
200 Series 201-03 204-0 1 205-0 1 220 225 226 290 292 294 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 Title Emergency Organizations and Organizational Response Variances from Routine Radiological Practice and Procedures During an Emergency Damage Control and Rescue Team Security Force Personnel Monitoring and Radiological Emergency Teams Radiological Medical Emergencies Potassium Iodide Emergency Notifications Emergency Call Out - Backup Method Incident Command Post (ICP) Liaison Response to Hostile Action Based (HA)
Events
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 3 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No.
Title 300 Series Emergency Facilities 301-01 Technical Support Center 302-01 Operational Support Center 303-01 Emergency Operations Facility 304-01 Alternate Emergency Operations Facility 305-0 1 Unified Incident Command Post 306-01 Alternate/Alternative Emergency Facilities
Fermi 2 RERP Plan Implementing Procedures Index Revision 16 Page 4 FERMI 2 RERP IMPLEMINTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No.
Title 400 Series Recovery Actions 402 Responsibilities of the Recovery Organization
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 5 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No.
Title 500 Series Miscellaneous 530 Assembly and Accountability and Onsite Protective Actions 540 Drills and Exercises 542 Computer-Based Offsite Dose Assessment-Airborne Release 545 Protective Action Recommendations 546 Calculation of Estimated Containment High Range Radiation Monitor or SGTS/AXM Monitor Readings if Instruments are Inoperable or Offscale 547 Rapid Estimate of Core/Fuel Damage Based on Containment High Range Radiation Monitor 550 RERP Training Program 560 Alert Notification System - Siren Operation and Maintenance 570 Emergency Call Out System - Testing and Maintenance 580 Equipment Important to Emergency Response (EITER) 590 10CFR50.54(q) Screens and Evaluations
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 6 FERMI 2 RERIP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No.
Title 600 Series Public Affairs 601 Public Education and Information 607 Media Pool Operation 608 Joint Public Information Center Operations END OF INDEX
DETROIT EDISON -
FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 02/10/16 TO: 00935 US NRC DOCUMENT CNTRL DESK WASHINGTON, DC 20555 PAGE 1
Media:
S 1/2 X 11 Number Cnt Issue DTC Doc.
Serial Number Page Rev Copies Lvi Date Sec Status TPEPT EP RERP PROCEDURE INDEX 16 1
ST 02/10/16 AFC Please destroy or mark all revised, superseded, or cancelled documents as such.
CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166.
(734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: u28076
Fermi 2 RERP Plan Implementing Procedures Index Revision 16 Page 1 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX BOOK NO. 1 NOTE: This Index lists all current active RERP Implementing Procedures. It does not reflect actual contents of this manual. The distribution list for the indicated recipient describes the actual content.
EP No.
Title 100 Series Classifications of Emergencies and Control of Emergency Response 101 102 103 104 105 110 Classification of Emergencies Unusual Event Alert Site Area Emergency General Emergency Organization and Responsibilities m SThOLLE~
Fermi 2 RERP Plan Implementing Procedures Index Revision 16 Page 2 EP No.
200 Series 201-03 204-0 1 205-0 1 220 225 226 290 292 294 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 Title Emergency Organizations and Organizational Response Variances from Routine Radiological Practice and Procedures During an Emergency Damage Control and Rescue Team Security Force Personnel Monitoring and Radiological Emergency Teams Radiological Medical Emergencies Potassium Iodide Emergency Notifications Emergency Call Out - Backup Method Incident Command Post (ICP) Liaison Response to Hostile Action Based (HA)
Events
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 3 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No.
Title 300 Series Emergency Facilities 301-01 Technical Support Center 302-01 Operational Support Center 303-01 Emergency Operations Facility 304-01 Alternate Emergency Operations Facility 305-0 1 Unified Incident Command Post 306-01 Alternate/Alternative Emergency Facilities
Fermi 2 RERP Plan Implementing Procedures Index Revision 16 Page 4 FERMI 2 RERP IMPLEMINTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No.
Title 400 Series Recovery Actions 402 Responsibilities of the Recovery Organization
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 5 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No.
Title 500 Series Miscellaneous 530 Assembly and Accountability and Onsite Protective Actions 540 Drills and Exercises 542 Computer-Based Offsite Dose Assessment-Airborne Release 545 Protective Action Recommendations 546 Calculation of Estimated Containment High Range Radiation Monitor or SGTS/AXM Monitor Readings if Instruments are Inoperable or Offscale 547 Rapid Estimate of Core/Fuel Damage Based on Containment High Range Radiation Monitor 550 RERP Training Program 560 Alert Notification System - Siren Operation and Maintenance 570 Emergency Call Out System - Testing and Maintenance 580 Equipment Important to Emergency Response (EITER) 590 10CFR50.54(q) Screens and Evaluations
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 6 FERMI 2 RERIP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No.
Title 600 Series Public Affairs 601 Public Education and Information 607 Media Pool Operation 608 Joint Public Information Center Operations END OF INDEX