ML16057A196
ML16057A196 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 02/10/2016 |
From: | Detroit Edison |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML16057A196 (7) | |
Text
DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 02/10/16 TO: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: S 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvi Date Sec Status TPEPT EP RERP PROCEDURE INDEX 16 1 ST 02/10/16 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: u28076
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 1 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX BOOK NO. 1 NOTE: This Index lists all current active RERP Implementing Procedures. It does not reflect actual contents of this manual. The distribution list for the indicated recipient describes the actual content.
EP No. Title 100 Series Classifications of Emergencies and Control of Emergency Response 101 Classification of Emergencies 102 Unusual Event 103 Alert 104 Site Area Emergency 105 General Emergency 110 Organization and Responsibilities m SThOLLE~
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 2 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No. Title 200 Series Emergency Organizations and Organizational Response 201-03 Variances from Routine Radiological Practice and Procedures During an Emergency 204-0 1 Damage Control and Rescue Team 205-0 1 Security Force 220 Personnel Monitoring and Radiological Emergency Teams 225 Radiological Medical Emergencies 226 Potassium Iodide 290 Emergency Notifications 292 Emergency Call Out - Backup Method 294 Incident Command Post (ICP) Liaison Response to Hostile Action Based (HA) Events
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 3 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No. Title 300 Series Emergency Facilities 301-01 Technical Support Center 302-01 Operational Support Center 303-01 Emergency Operations Facility 304-01 Alternate Emergency Operations Facility 305-0 1 Unified Incident Command Post 306-01 Alternate/Alternative Emergency Facilities
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 4 FERMI 2 RERP IMPLEMINTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No. Title 400 Series Recovery Actions 402 Responsibilities of the Recovery Organization
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 5 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No. Title 500 Series Miscellaneous 530 Assembly and Accountability and Onsite Protective Actions 540 Drills and Exercises 542 Computer-Based Offsite Dose Assessment-Airborne Release 545 Protective Action Recommendations 546 Calculation of Estimated Containment High Range Radiation Monitor or SGTS/AXM Monitor Readings if Instruments are Inoperable or Offscale 547 Rapid Estimate of Core/Fuel Damage Based on Containment High Range Radiation Monitor 550 RERP Training Program 560 Alert Notification System - Siren Operation and Maintenance 570 Emergency Call Out System - Testing and Maintenance 580 Equipment Important to Emergency Response (EITER) 590 10CFR50.54(q) Screens and Evaluations
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 6 FERMI 2 RERIP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No. Title 600 Series Public Affairs 601 Public Education and Information 607 Media Pool Operation 608 Joint Public Information Center Operations END OF INDEX
DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 02/10/16 TO: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: S 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvi Date Sec Status TPEPT EP RERP PROCEDURE INDEX 16 1 ST 02/10/16 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: u28076
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 1 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX BOOK NO. 1 NOTE: This Index lists all current active RERP Implementing Procedures. It does not reflect actual contents of this manual. The distribution list for the indicated recipient describes the actual content.
EP No. Title 100 Series Classifications of Emergencies and Control of Emergency Response 101 Classification of Emergencies 102 Unusual Event 103 Alert 104 Site Area Emergency 105 General Emergency 110 Organization and Responsibilities m SThOLLE~
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 2 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No. Title 200 Series Emergency Organizations and Organizational Response 201-03 Variances from Routine Radiological Practice and Procedures During an Emergency 204-0 1 Damage Control and Rescue Team 205-0 1 Security Force 220 Personnel Monitoring and Radiological Emergency Teams 225 Radiological Medical Emergencies 226 Potassium Iodide 290 Emergency Notifications 292 Emergency Call Out - Backup Method 294 Incident Command Post (ICP) Liaison Response to Hostile Action Based (HA) Events
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 3 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No. Title 300 Series Emergency Facilities 301-01 Technical Support Center 302-01 Operational Support Center 303-01 Emergency Operations Facility 304-01 Alternate Emergency Operations Facility 305-0 1 Unified Incident Command Post 306-01 Alternate/Alternative Emergency Facilities
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 4 FERMI 2 RERP IMPLEMINTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No. Title 400 Series Recovery Actions 402 Responsibilities of the Recovery Organization
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 5 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No. Title 500 Series Miscellaneous 530 Assembly and Accountability and Onsite Protective Actions 540 Drills and Exercises 542 Computer-Based Offsite Dose Assessment-Airborne Release 545 Protective Action Recommendations 546 Calculation of Estimated Containment High Range Radiation Monitor or SGTS/AXM Monitor Readings if Instruments are Inoperable or Offscale 547 Rapid Estimate of Core/Fuel Damage Based on Containment High Range Radiation Monitor 550 RERP Training Program 560 Alert Notification System - Siren Operation and Maintenance 570 Emergency Call Out System - Testing and Maintenance 580 Equipment Important to Emergency Response (EITER) 590 10CFR50.54(q) Screens and Evaluations
Fermi 2 Revision 16 RERP Plan Implementing Procedures Index Page 6 FERMI 2 RERIP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No. Title 600 Series Public Affairs 601 Public Education and Information 607 Media Pool Operation 608 Joint Public Information Center Operations END OF INDEX