ML021640135
| ML021640135 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/14/2002 |
| From: | Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| 00935, ca6622 | |
| Download: ML021640135 (7) | |
Text
To: 00935 US NRC DOCUMENT CNTRL DESK DETROIT EDISON -
FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 05/14/02 PAGE 1
WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TPEPT EP RERP PROCEDURE INDEX 9
1 ST 05/14/02 AFC Please destroy or mark all revised, superseded, or cancelled documents as such.
CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166.
(734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: ca6622
,6,j3415
Fermi 2 Revision 9 RERP Plan Implementing Procedures Index Page 1 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX BOOK NO. 1 NOTE: This Index lists all current active RERP Implementing Procedures. It does not reflect actual contents of this manual. The distribution list for the indicated recipient describes the actual content.
EP No.
Title 100 Series Classifications of Emergencies and Control of Emergency Response 101 Classification of Emergencies Tab A Recognition Category A - Abnormal Rad Levels/Radiological Effluent Tab F Recognition Category F - Fission Product Barrier Degradation Tab H Recognition Category H - Hazards and Other Conditions Affecting Planrt Safety Tab S Recognition Category S - System Malfunction 102 Unusual Event 103 Alert 104 Site Area Emergency 105 General Emergency 110 Organization and Responsibilities In ormation and Procedures DSN Revision DCR #
DTC File #
NA TPEPT 1703.10 IP Code Date
- pproved R~aseyu.
Date Issued Recipient ?
I II edC T.
O.
7 CONTFpo-LED
FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 Title Emergency Organizations and Organizational Response Variances from Routine Radiological Practice and Procedures During an Emergency Damage Control and Rescue Team Security Force Personnel Monitoring and Radiological Emergency Teams Radiological Medical Emergencies Potassium Iodide Emergency Notifications Emergency Call Out - Backup Method Fermi 2 RERP Plan Implementing Procedures Index Revision 9 Page 2 EP No.
200 Series 201-03 204-01 205-01 220 225 226 290 292
Fermi 2 Revision 9 RERP Plan Implementing Procedures Index Page 3 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 EP No.
Title 300 Series Emergency Facilities 301-01 Technical Support Center 302-01 Operational Support Center 303-01 Emergency Operations Facility 304-01 Alternate Emergency Operations Facility
Fermi 2 RERP Plan Implementing Procedures Index FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 Title Recovery Actions Responsibilities of the Recovery Organization Revision 9 Page 4 EP No.
400 Series 402
Revision 9 Page 5 FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 Title Miscellaneous Assembly and Accountability and Onsite Protective Actions Drills and Exercises Computer-Based Offsite Dose Assessment-Airborne Release Protective Action Recommendations Calculation of Estimated Containment High Range Radiation Monitor or SGTS/AXM Monitor Readings if Instruments are Inoperable or Offscale Rapid Estimate of Core/Fuel Damage Based on Containment High Range Radiation Monitor RERP Training Program Fermi 2 RERP Plan Implementing Procedures Index EP No.
500 Series 530 540 542 545 546 547 550
Fermi 2 RERP Plan Implementing Procedures Index FERMI 2 RERP IMPLEMENTING PROCEDURES INDEX (Cont.)
BOOK NO. 1 Title Public Affairs Public Education and Information Media Pool Operation Joint Public Information Center Operations END OF INDEX Revision 9 Page 6 EP No.
600 Series 601 607 608