Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 | 31 December 1996 | Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 | Safe Shutdown Boric Acid High Radiation Area Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Pressure boundary leak Through-Wall Leak Scaffolding |
ML19247E198 | 28 February 1981 | Adequacy of Station Electric Distribution Sys Voltages, Edwin Hatch Nuclear Power Station - Units 1 & 2,Dockets 50-321 & 50-366, Informal Rept | |
ML19325C140 | 20 June 1989 | Preimplementation Audit Rept for Dcrdr at Georgia Power Co Edwin I Hatch Nuclear Power Plant,Units 1 & 2,890424-26. | |
ML19331C904 | 21 July 1980 | Primary Coolant Sys Pressure Isolation Valves,Hatch Units 1 & 2, Technical Evaluation Rept | |
ML20008F791 | 30 April 1981 | Adequacy of Station Electric Distribution Sys Voltages, Edwin I Hatch Nuclear Power Station, Informal Rept for Apr 1981 | Safe Shutdown |
ML20023A486 | 2 September 1982 | Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation Rept | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
ML20040D128 | 11 December 1981 | Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info | |
ML20040D129 | 11 December 1981 | Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info | |
ML20041D227 | 31 January 1982 | Evaluation of Licensee Response to NUREG-0737 ,Item II.B.2 - Design Review of Plant Shielding Edwin I. Hatch Nuclear Plant Units 1 & 2 - Dockets 50-321 & 50-366, Technical Evaluation Rept | |
ML20041D229 | 31 January 1982 | Degraded Grid Protection for Class IE Power Sys,Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Preliminary Rept | |
ML20041D233 | 31 January 1982 | Adequacy of Station Electric Distribution Sys Voltages, Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept | Safe Shutdown |
ML20045A521 | 31 May 1993 | High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hatch Nuclear Power Station | Reactor Vessel Water Level Probabilistic Risk Assessment Overtravel |
ML20050S965 | 28 February 1982 | Degraded Grid Protection for Class IE Power Sys,Ei Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept | |
ML20055A436 | 28 February 1980 | Electrical,Instrumentation & Control Sys Support, Interim Rept | Reactor Vessel Water Level |
ML20058H599 | 15 November 1990 | Analysis of Ei Hatch Unit 2 Integrated Leakage Rate Testing Data Using Sbir Analysis of State-of-Art Methods of Containment Integrated Leakage Rate Testing | |
ML20062B299 | 7 June 1982 | Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1), Final Technical Evaluation Rept for Hatch 1 & 2 | |
ML20063C743 | 25 June 1982 | Masonry Wall Design, Technical Evaluation Rept | Earthquake |
ML20076C428 | 8 February 1983 | ECCS Repts (F-47),TMI Action Plan Requirements,Edwin Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept | |
ML20079S078 | 26 September 1994 | Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Hatch-1/-2 | |
ML20080K634 | 27 September 1983 | Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Ei Hatch Nuclear Plant Units 1 & 2, Technical Evaluation Rept | Finite Element Analysis Earthquake |
ML20080N463 | 30 September 1983 | Technical Evaluation of Hatch Units 1 & 2 Plant-Unique Analysis Repts | |
ML20086G516 | 29 June 1995 | Technical Evaluation Rept on Individual Plant Exam Front End Analysis | Mission time Internal Flooding Hardened vent |
ML20086G521 | 31 December 1994 | Technical Evaluation Rept on Individual Plant Exam Back-End Analysis | Probabilistic Risk Assessment Hardened vent |
ML20086G528 | 30 November 1994 | Technical Evaluation Rept on Individual Plant Exam Human Reliability Analysis | Mission time Hardened vent |
ML20087M832 | 27 March 1984 | Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20091D596 | 31 July 1983 | Technical Evaluation of Integrity of Edwin I Hatch Nuclear Power Plant Unit 1 & 2 RCPB Piping Sys | Packing leak Weld Overlay Nondestructive Examination Earthquake Pressure Boundary Leakage Pressure boundary leak Dissimilar Metal Weld |
ML20102A793 | 31 January 1985 | Conformance to Reg Guide 1.97,EI Hatch Nuclear Plant Units 1 & 2 | Squib Fuel cladding |
ML20127N631 | 3 May 1985 | Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, 'Post-Trip Review & Data & Info Capabilities,' for Ei Hatch Nuclear Plant,Units 1 & 2 | |
ML20132D187 | 30 June 1985 | Conformance to Reg Guide 1.97,Edwin I Hatch Nuclear Plant Units 1 & 2 | Reactor Vessel Water Level Grab sample Squib Fuel cladding |
ML20140E299 | 2 June 1997 | Proposed Criteria for ECCS Strainer Design,Technical Evaluation Rept | Foreign Material Exclusion |
ML20142A120 | 9 January 1986 | SPDS Progress Review,Ei Hatch Nuclear Plants,Units 1 & 2 | Earthquake |
ML20151H242 | 1 July 1982 | Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept | Fuel cladding |
ML20204G392 | 1 August 1986 | Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Edwin I Hatch Nuclear Plant Units 1 & 2, Supplementary Technical Evaluation Rept | |
ML20210L271 | 30 April 1986 | Second Interval Inservice Insp Program,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept | Stroke time Weld Overlay Hydrostatic VT-2 Dissimilar Metal Weld |
ML20211F030 | 31 March 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) | |
ML20214G959 | 31 March 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants | |
ML20214Q898 | 30 April 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept | |
ML20215M212 | 31 May 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components, Informal Rept | |
ML20235L562 | 30 June 1987 | Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Ei Hatch Nuclear Plant, Units 1 & 2, Informal Rept | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program |
ML20236N834 | 30 November 1978 | Aerial Radiological Survey of Area Surrounding E Hatch Nuclear Plant, Date of Survey Mar 1977 |