Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML16340C35727 February 1982Forwards Clarification on Correlation Between Contractor Performed Work & Independent Samples Re Seismic Reverification Program & Criteria for Addl Verification Re Deficiencies in QA Review & Independent CalculationsBoric Acid
ML16340C90124 September 1982Forwards Diablo Canyon Nuclear Power Plant Independent Design Verification Program,Semimonthly Rept for Sept 1982
ML17083A98926 February 1982Forwards Progress Rept of Seismic Svc-Related Contracts Prior to June 1978, Project 105-4,Progress Rept 8 for Work Period 820213-26
ML17083B19528 July 1983Forwards Rev 2 to Verification of Instrument & Control Design of Control Room Ventilation & Pressurization Sys, Interim Technical Rept 28 & Rev 2 to Verification of Pressure,Temp,Humidity..., Interim Technical Rept 14
ML17341B64423 February 1982Advises That Project Has Escalated to Approx 60 to 70% of Current Billings
ML19264C7811 March 1982Forwards Design Verification Program,Seismic Svc Related Contracts Prior to June 1978, Revision 1,Phase I
ML19289C31618 December 1978Believes Subj Facility Is Vital to State of CA Energy Needs. Urges Startup as Soon as Possible
ML20055A3459 July 1982Forwards Semimonthly Rept 17 for Diablo Canyon Nuclear Power Plant,Unit 1 Independent Seismic Reverification Program, 820622-820706
ML20063H51028 July 1982Submits Changes to Independent Design Verification Program, Semimonthly Status Rept for Jul 1982.New Copy Will Be Forwarded within 2 Days.Requests 820723 Copy Be Destroyed Upon Receipt of Revision 1
ML20067C1086 December 1982Concurs W/Licensee 821203 Request for Restoration of Low Power License & Stepwise Licensing Schedule to Full Power. Schedule for Proposed 3-step Licensing & Transmittal Forms Encl
ML20069H36115 October 1982Provides Preliminary Response to 820701 Request for Review of Seven Points Re Validity of BNL Results & Generic Implications in Final Rept Concerning Analysis of Facility
ML20070E75915 November 1982Clarifies 821110 Statements Re Seismic Qualification of Turbine Bldg.Recommendation for Independent Analysis by BNL Justified.Transmittal of Clarifications to Other Commissioners RequestedEarthquake
ML20071F78715 April 1983Forwards Rev 0 to Diablo Canyon Unit 1 Independent Design Verification Program - Hxs, Interim Technical Rept 43Safe Shutdown
Safe Shutdown Earthquake
Earthquake
ML20072B48711 February 1983Advises That No Open Item Repts Issued Since Jan Semimonthly Rept
ML20072H31722 June 1983Forwards Diablo Canyon Nuclear Power Plant Unit 1, Independent Design Verification Program Final Rept, Fifth Text Submittal.Final Text Submittal Scheduled for 830630
ML20072R63111 March 1983Forwards Diablo Canyon Nuclear Power Plant Independent Design Verification Program Semimonthly Rept,830311
ML20076B57624 August 1982Requests Issuance of Final Statement Clearing Rl Cloud Associates from Allegations of Wrongdoing in Preparation of Preliminary Rept,Seismic Verification Program, Per NRC Investigation Results in NUREG-0862,Issue 3
ML20080E19619 August 1983Provides Summary Info & Eighth Text Submittal of Idvp Final ReptNon-Destructive Examination
Probabilistic Risk Assessment
Finite Element Analysis
FLEX
Earthquake
Power-Operated Valves
ML20080K39820 September 1983Forwards Rev 0 to Diablo Canyon Unit 1 Idvp Verification of Corrective Action,Turbine Bldg, Interim Technical Rept 56
ML20090A8734 April 1984FOIA Request for V Gilinsky 830908 & 28 Ltrs to ACRS Re Tau Effect at Diablo Canyon to Be Placed in PDR
ML20090H00330 June 1983FOIA Request for Polk & Schierling 830218 Memo to Knighton & Lear Re Reverification Program to Be Placed in PDR
ML20100L95616 December 1981Forwards Addl Matl Re Design Interface Review of Seismic Reverification Program
ML20112J3492 February 1984Forwards Review Detailing Results of 831219 & 20 Audits Performed on Environ Qualification Program Documentation at Facility.Adequate Technical Basis for Claimed Qualification Indicated
ML20133C59623 May 1985FOIA Request for Section 55.25 Exam Summary Sheets Prepared by Operator Licensing Branch for Operator Candidates & Monthly & Quarterly Repts on Senior Operator Performance on Exams
ML20134L50119 June 1985FOIA Request for Operator Exam Results Summary Sheets for Listed Nuclear Plants
ML20136B29312 March 1982Notifies That Ninth Progress Rept on Seismic Verification Program Will Be Issued on 820315
ML20136B29812 March 1982Forwards Rf Reedy,Inc QA Rept on PG&E & to Denton
ML20150D4307 January 1988FOIA Request for Records Re 1975 NRC Seismic Design Audit of FacilityEarthquake
ML20151X7556 October 1967Submits Nm Newmark & Wj Hall Formulated Questions Resulting from 671003-05 Meetings in Bethesda,Md & Washington,Dc Re Plant Reactor Internals,Piping & Vessels.Requests Answers to Subj Questions to Finalize Rept on Util License Application
ML20153D57930 November 1981Commends Position Re Plant in Spite of Obvious Political Pressures.Utils Do Not Realize How Serious Mistake Can Be. Safe Nuclear Power Needed.Another TMI Would End Industry & Energy Independence
ML20153G93631 January 1984Forwards Comments Addressed to Chairman Palladino
ML20198E3214 March 1986FOIA Request for Documents Re Facility from Chronological & Reading Files of HR Denton from 840101 to Present
ML20199G6654 March 1986FOIA Request for Documents from Chronological & Reading Files of J Knight During 810901-831231 Re Plant
ML20202D0532 June 1986FOIA Request for Records of ACRS Jan 1973 - Dec 1985 Meetings Re Geology,Seismology & Seismic Design of Diablo Canyon
ML20205M49520 February 1987FOIA Request That All Operational Readiness Ltrs for Diablo Canyon Be Placed in PDR
ML20206H6164 March 1986FOIA Request for All Records from H Schierling Chronological Files & Reading Files for Sept 1981 - Dec 1983 Re Facilities
ML20207R6549 January 1987FOIA Request for All Petitions Referred to Licensing Board by 740319 Memorandum & Order CLI-74-10 & All Licensing Board Orders,Director'S Decisions or Further Commission Orders Responding to Such Petitions
ML20207T10013 February 1987FOIA Request for Two Categories of Documents Re Diablo Canyon Nuclear Power Plant,Consisting of Transcripts of Closed Commission Briefings on 830422,840131 & 0702 & Secretary 831104 Limited Distribution Memo
ML20207T22116 January 1987FOIA Request for Commissioner 811116 Briefing Transcript Re Diablo Canyon Seismic Design Error & NRC pre-congressional Testimony & Commissioner 811119 Briefing Transcript of NRC pre-congressional Testimony
ML20209E1224 March 1986FOIA Request for Documents Re Plant from Files of H Schierling from Jan 1984 to Present
ML20210A6804 March 1986FOIA Request for Documents from H Schierling Files from 810901-831231 Re Diablo Canyon Nuclear Power Plant,Units 1 & 2
ML20210E61623 November 1983Forwards Rept PAR(DCNP)-NDE-2 & Project Quality Plan Re Technical Assistance in Support of NDE Work at Plant.Table of Field Welds Chosen for Radiograph & Reader Sheet Review Also EnclNondestructive Examination
Liquid penetrant
Scaffolding
ML20210E73319 April 1984Submits Results of 840403-05 Insp of Rectangular Tube Steel W/Perimeter Less than 14 Inches Used for Safety Class I Sys, in Response to P Morrill 840402 Request.Data Re Tube Steel Measurements Encl
ML20210E8022 December 1983Discusses Welding Procedures & Practices Re Use of Unqualified Welders & Welding Procedures That Affect Safety. Response Requested.Supporting Documentation Encl
ML20210K55411 March 1986FOIA Request for Records from Caseload Forecast Review Panel Re Diablo Canyon from Jan 1979 - Dec 1981
ML20210M90726 January 1987FOIA Request for Transcript of Commissioner 831017 Briefing Re Diablo Canyon Idvp
ML20210P45029 October 1982Forwards Rev 0 to Diablo Canyon Unit 1 Idvp Verification of Design Analysis Hosgri Spectra, Interim Technical Rept 10
ML20210P4874 March 1986FOIA Request for Records from D Eisenhut Chronological & Reading Files Re Diablo Canyon Units 1 & 2 During Sept 1981 - Dec 1983
ML20210P55030 November 1982Provides List of Locations Where Specific Deviations from FSAR Separation Criteria for Control Panel Wiring Observed, in Response to Util 821104 Request
ML20210P59110 December 1982Forwards Open Item Rept Forms Issued Since Last Semimonthly Rept.Related Info EnclEarthquake