ML20063H510
| ML20063H510 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/28/1982 |
| From: | Cooper W TELEDYNE ENGINEERING SERVICES |
| To: | Harold Denton, Engelken R, Maneatis G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation, PACIFIC GAS & ELECTRIC CO. |
| References | |
| 5511-79, NUDOCS 8207300277 | |
| Download: ML20063H510 (3) | |
Text
-.c s "RTELEDYNE Y,"
ENGINEERING SERVICES 130 SECOND AVENUE WALTHAM, MASSACHUSETTS 02254 (617) 8943350 TWX (710) 324-7508 July 28, 1982 5511-79 Mr. G. A. Maneatis, Senior Vice-President Facilities Development Pacific Gas and Electric Co.
77 Beale Street San Francisco, California 94106 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Washington, D.C.
20555 Mr. R. H. Engelken, Regional Administrator Region V U. S. Nuclear Regulatory Comission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Re: Docket No. 50-275 Diablo Canyon Unit 1 License No. DPR-76
Subject:
DCNPP Independent Design Verification Program, Semimonthly Status for July 1982 Gentlemen:
The Semimonthly Status Report for July 1982 sent via DCNPP-TES 5511-77 has several typographical errors which we feel necessitate the re-issuance of this report.
A new copy will be forwarded to you within the next two days. The following is a listing of the changes being made:
Section Description of Change Executive Sumary,
" programable" to "programatic" Para. 2, Line 6 Executive Sumary,
" rectified" to " identified" Para. 2, Line 7 i
Executive Sumary, "with a participation" to "was a presen-Para. 3, Line 3 tation" 8207300277 820728 ENGINEERS AND METALLURGISTS PDR ADOCK 05000275 R
3 s
i "A'TELEDYNE A
k.
r M
tis, Denton, Engelken DiGINEERING SEMCES Page 2 5511-77 Section (Con't)
Description of Change (Cont'd)
Executive Summary
" inhibited" to inititated Para. 5, Line 2 1.0, Para. 2 "Both" to "Both Phases" 2.1.3, Line 5 "isued" to " issued" 2.3.2, e., Line 5 Delete ", and ITR-3 issued" 2.3.2, e., Line 7 Should read "This task has been com-pleted, and ITR-3 issued.
2.4, Line 1 Delete " portion" 2.4, Line 3 Delete ",all presently identified work" 4.1.1, Para. 2, Line 5 "NRC and described at the" to " Based upon" 4.1.1, Para 4, Line 9
" rectify" to " reflect" 4.1.1, Para. 4, Line 12 Should read "sult has been the inclusion of much of an additional weeks work in this" 4.1.1, Para. 4, Line 13
" rearrangement" to " assignment"
" priorities" to " priority" 4.1.2, Para. 2, Line 16 "will be" to "have been" Please destroy the July 23rd copy when receipt of Revision 1 has been acknowledged.
Very Truly Yours, TELEDYNE ENGINEERING SERVICES William E. Cooper Project Manager WEC/cjr l
Enclosure
-cc:
H. E. Schierling (NRC) (2)
R. R. Fray (PG&E)
R. L. Cloud (RLCA)
R. F. Reedy (RFR) l F. Sestak (SWEC) l H. B. Brown, Esq.
D. F. Fleischaker, Esq.
J. Reynolds, Esq.
B. Norton, Esq.
A. C. Gehr, Esq.
WTF1 N
@ Transmittal-Please Sign and Return Acknowledgement gg C IXequest for Information (RFI) l 1
When Requested Assign Control Number Page _of Receipt (TES Use Only)
Control No.
Originator W. E. Cooper Transmit To: Mr. H. Denton Project No.
5511 Office of Nuclear Reactor Regulation Date 7/ 28/82 U. S. Nuclear Regulatory Commission Client PO 5-2-82 7920 Norfolk Ave.
Transmitted Under Separate Cover To:
N/A Bethesda, MD 20114 NOTE: Furnish complete identification for items transmitted (below).
O U
QTY TYPE ITEM IDENT NO.
REV DESCRIPTION - Title and Number of Sheets / Panes I
ltr 5511-79 0'
Corrections to July Semimonthly 4
ACKNOWLEDGEMENT OF RECEIPT BY TITLE DATE DISPOSITION FOR PREVIOUS REVISIONS C Return to TES O Mark void ODestroy uncontroited NOTE TO ADDRESSEE: Unless stated otherwise the listed items are furnished to you as Controlled Documents. Please sign and return the number 2 copy to:
TELEDYNE ENGINEERING SERVICES 130 Second Avenue Waltham, Massachusetts 02254 Attention: Document Control, Project 5TIl DISTRIBUTION: 1 and 2-Addressee 3-Document Control 4-Originator / Project Manager 4/81
e ih'E
, b Transmittal-Please Sign and Return Acknotvledgament ggggpJ O rxequest for Information (RFI)
I 1
When Requested Assign Control Number Page __of Receipt (TES Use Only)
Contro! No.
Originator W. E. Cooper Transmit To: Mr. H. Denton Office of Nuclear Reactor Regulation Project No.
5511 Date 7/ 28/82 U. S. Nuclear Regulatory Comission Client PO 5-2-82 7920 Norfolk Ave.
Transmitted Under Separate Cover To:
N/A Bethesda, MD 20114 NOTE: Furnish complete identification for items transmitted (below).
O U
QTY TYPE ITEM IDENT NO.
REV DESCRIPTION - Title and Nomher of Sheets / Panes N
1 Itr 5511-79 0
Corrections to July Semimonthly ACKNOWLEDGEMENT OF RECEIPT BY TITLE DATE DISPOSITION FOR PREVIOUS REVISIONS O Return to TES Mark Void ODestroy D uncontrolled NOTE TO ADDRESSE_E: Unless atated otherwisc the listed items are furnished to you as Controlled Documents. Please sign and return the number 2 copy to:
TELEDYNE ENGINEERING SERVICES 130 Second Avenue Waltham, Massachusetts 02254 Attention: Document Control, Project WN DISTRIBUTION: 1 and 2-Addressec 3-Document Control 4-Originator / Project Manager 4/81 L