Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML00371665724 April 2000Init EXAM-4-2000-Draft Admin JPM A-1-2Job Performance Measure
ML00371666224 April 2000Init EXAM-4-2000-Draft Admin RO JPM A-1-1Job Performance Measure
ML00371666624 April 2000Init EXAM-4-2000-Draft Admin SRO JPM A-1-1Job Performance Measure
ML00371667224 April 2000Init EXAM-4-2000-Draft Admin SRO JPM A-4Job Performance Measure
ML00371667724 April 2000Init EXAM-4-2000-Draft JPM A-2Job Performance Measure
ML00371673724 April 2000Init EXAM-4-2000-Draft JPM CVCS1 - Perform Emerg Boration _Bamt Gravity FeedBoric Acid
Shutdown Margin
Job Performance Measure
ML00371674224 April 2000Init EXAM-4-2000-Draft JPM AFW01 - SG Feed Using AFW Pump 2p75Job Performance Measure
ML00371674424 April 2000Init EXAM-4-2000-Draft JPM CCP01 - Shift Lead Charging PumpJob Performance Measure
ML00371674724 April 2000Init EXAM-4-2000-Draft JPM CEA03 - Test Rx Trip Circuit BreakerJob Performance Measure
ML00371675024 April 2000Init EXAM-4-2000-Draft JPM Aacsu - Su Aacg Locally ManuallyJob Performance Measure
ML00371675224 April 2000Init EXAM-4-2000-Draft JPM H2001 - H2 Recombiner 2M55B Funct TestJob Performance Measure
ML00371675824 April 2000Init EXAM-4-2000-Draft JPM PZR02 - Equalize RCS and Pzr BoronJob Performance Measure
ML00371676024 April 2000Init EXAM-4-2000-Draft JPM RCP02 - Restor CCW to RCPsJob Performance Measure
ML00371676224 April 2000Init EXAM-4-2000-Draft JPM Swcsp - Shift Stator Water Cooling PumpsJob Performance Measure
ML00372559019 December 1999ANO, Unit 1, Initial Examinations, Draft Operating SubmittalBoric Acid
Loop seal
Fire impairment
Job Performance Measure
ML0423000681 September 2004Section 3.0, Aging Management Reviews Results - ANO-2 SER Final Draft W/Open and Confirmatory ItemsBoric Acid
Non-Destructive Examination
Fire Barrier
Coatings
Nondestructive Examination
VT-2
Aging Management
Earthquake
Biofouling
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
ML0423000911 September 2004Section 3.1, Aging Management of Reactor Vessel, Internals, and Reactor Coolant System - ANO-2 SER Final W/Open and Confirmatory ItemsBoric Acid
Nondestructive Examination
Aging Management
ML0423001281 September 2004Section 3.2, Aging Management of Engineered Safety Features Systems - ANO-2 SER Final W/Open and Confirmatory ItemsBoric Acid
Aging Management
ML0423001341 September 2004Section 3.3, Aging Management of Auxiliary Systems - ANO-2 SER Final W/Open and Confirmatory ItemsBoric Acid
Aging Management
Biofouling
Fire Protection Program
ML0423001481 September 2004Section 3.4, Aging Management of Steam and Power Conversion Systems - ANO-2 SER Final W/Open and Confirmatory ItemsAging Management
Biofouling
ML0423001531 September 2004Section 3.5, Aging Management of Structures and Component Supports - ANO-2 SER Final W/Open and Confirmatory ItemsBoric Acid
Aging Management
Moisture barrier
Fire Protection Program
Dissimilar Metal Weld
ML0423001571 September 2004Section 3.6, Aging Management of Electrical and Instrumentation and Controls - ANO-2 SER Final W/Open and Confirmatory ItemsBoric Acid
Aging Management
ML06195037712 January 20061-2006 - Draft Written Exam Comments
ML22224A19012 August 2022Notification of NRC Initial Operator Licensing Examination 05000368/2023301