Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
BSEP 15-0054, Part 21 Notification Regarding Allen Bradley Model 700RTC Relays25 June 2015Part 21 Notification Regarding Allen Bradley Model 700RTC RelaysCommercial Grade
M200087, GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients24 June 2020GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss CoefficientsFuel cladding
M210077, GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors17 June 2021GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 ReactorsFuel cladding
ML02151029515 May 200210 CFR 21 Notification - Potential Defect Fan Assemblies for UPS Systems
ML02155024910 May 2002Letter from W. G. Hampton Subject: 10CFR Part 21 Notification-Potenial Defect Involving Fan Assemblies Used in Forced Air Cooled Uninterruptible Power Supply Systems
ML02281029030 September 2002Main Steam Line Valve Out-of-Service Final ReportFlow Induced Vibration
ML02283027630 September 2002Main Steam Line Valve Out-of-Service Final ReportFlow Induced Vibration
ML0228302781 October 2002Part 21.21 Report Involving Stability Option III: Possible Successive Confirmation Count Resets
ML02331056922 November 2002Part 21 Report Re General Electric Identified the Stability Option III Period Based Detection Algorithm T-Min Specification Has a Defect
ML02333044225 November 2002Spectrum Technologies, Part 21 Initial Notification - Cutler-Hammer A200 NEMA Size 1 StartersMELLLA
ML02347035210 December 200210 CFR Part 21 Notification of an Error in Calculations of MCPR, LHGR, & MAPLHGR in Powerplex Incore Monitoring System
ML03055024817 February 200310CFR Part 21 Notification - Carboline CompanyCoatings
ML03255040710 September 200310 CFR, Part 21 Notification of Potential Safety Related Nonconforming Condition
ML03258045010 September 200310 CFR, Part 21 Notification of Potential Safety Hazard Involving Crane Emergency Drum Brake
ML0328704294 October 2003Part 21 Notification Regarding Stability Option III Period Based Detection Algorithm Allowable SettingsMinimum Critical Power Ratio
ML03328051918 November 2003Part 21 Report Involving Impact of Fuel Channel Bow on Control Rod Blades
ML04132038130 April 200410CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0088, Rev. 0
ML04182012126 June 200410 CFR 21 Notice for Load Sensing Frame
ML0425200482 September 2004Part 21 Reporting: History of Emergency Diesel Generator Piston Defect at Brunswick Nuclear Plant
ML0501102237 January 2005Non-Emergency Event Report, Overstress Condition on Single Failure Proof Crane Trolleys
ML05095042829 March 200510CFR21 Reportable Condition Notification: Involving Potential to Exceed Low Pressure Technical Specification Safety LimitAnticipated operational occurrence
Fuel cladding
ML05179023724 June 2005Part 21 Notification - Critical Power Determination for G314 and GE12 Fuel with Zircaloy Spacers, 06/24/2005Anticipated operational occurrence
ML05269008420 September 2005Part 21 Notification Completion: Critical Power Determination for GE14 and GE12 Fuel with Zircaloy SpacersAnticipated operational occurrence
ML0609504013 April 2006Director Office of Inspection & Enforcement Reference: 10 CFR 21 Notification of 3/30/06 Rev1
ML06136046512 May 2006Part 21 60-Day Interim Report Notification: BWR Core Shroud Tie Rod Upper Support CrackingFinite Element Analysis
ML06166013113 June 2006Nak Engineering Inc. 10 CFR Part 21 Notification - Defective Nordberg Emergency Diesel Generator Valve Seat Inserts
ML06186038130 June 2006Operations Center Event Report, Defective Paperless Data Acquisition Recorders.
ML06262049415 September 2006Part 21 Report by Tyco Valves and Controls, LP Re Improper Valve Springs in Pressure Relief Valves. Corrective Actions Taken by Tyco Listed
ML06285036610 October 2006Part 21 Notification - BWR Core Shroud Tie Rod Upper Support CrackingSafe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Design basis earthquake
Earthquake
ML0710002296 April 2007Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1152 Pressure TransmittersHydrostatic
Loctite
ML0713703097 March 2007Velan, Inc., Piston Check Cv Information
ML07184017626 June 200710CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 1OCFR21-0093, Rev. 0 - Camfil-Farr Air Intake Filter Housing, P/N: ESI50801-1
ML07275047021 September 2007MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21Commercial Grade Dedication
ML0728303348 October 2007Notification of Potential Part 21 Report - Areva Minimum Critical Power RatioAnticipated operational occurrence
ML0731000821 November 2007Notification of Potential 10 CFR Part 21 of an Error in BWR MCPR CalculationAnticipated operational occurrence
ML0732000869 November 2007Notification of Potential Part 21 Report Conval Valves Weld Qualifications
ML0734402117 December 2007Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters
ML08043044611 February 2008Notification of Potential Part 21 Report Power Supply Unit Is Limited at Elevated Temperatures
ML0809906344 April 2008Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items
ML08120088214 April 2008Notification of Potential Part 21 on Safety Related Noncompliance DeviationCoatings
ML08239010625 August 2008Notification of Potential Part 21 on Failure of F and G SwitchesTest box
ML08319001712 November 2008Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28
ML0904007485 February 2009Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111
ML09076118811 March 2009Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs
ML09149048828 May 2009Notification of Potential Part 21 Report Re Air Circuit Breaker Deficiency
ML0925102153 September 2009Engine Systems, Inc., Part 21 - Faulty Emergency Diesel Generator Start-Up Solenoid Valve
ML0925402233 September 2009Notification of Potential Part 21 on 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 1OCFR21-0096, Rev. 0
ML09268024623 September 2009Notification of Potential Part 21 on Reportable Occurrence Under 10 CFR Part 21: Firmware Anomaly in the Model RM-80 Radiation Monitoring System
ML0927805881 October 2009Transnuclear, Inc Part 21 Report Re Fasteners on Spent Fuel Storage Devices Not Meeting Standards
ML09302056023 October 2009Potential Delivery of Nonconforming Washers Supplied with Expansion Anchors Type Hilti Kwik Bolt KB3 SS316, 1/4 and 3/8 Diameters, All Lengths, Which May Meet the Definition of a Defect within 10 CFR Part 21