MONTHYEARML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML20108F5302020-03-20020 March 2020 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0129, Rev. 0, Test Stand Deficiency - EMD Fuel Injectors P/N H40084720 ML20024E2552020-01-0909 January 2020 Engine Systems, Inc., Submittal of Selenium Surge Suppressor, Emo P/N 8403049 ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19199A0342019-07-0505 July 2019 Lake Engineering Co., Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19168A0102019-05-31031 May 2019 Curtis-Wright Nuclear Division- Notification Report for Potential Part 21 Update ML19168A0122019-05-31031 May 2019 Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML19077A0962019-03-0505 March 2019 Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 ML17243A1362017-08-28028 August 2017 Fisher Information Notice, (FIN) 2017-04 - Erroneous Rotary Seating Torque Calculation in Flowscanner Software ML17223A2002017-08-0909 August 2017 10 CFR Written Notification for Hex Head Cap Screws Nova Machine Products Part Numbers: BPRT.008227.30, BPRT.008468.30, and BPRT.008342.30 ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML17104A2882017-04-13013 April 2017 Emerson Process Management, LLC - Fisher Information Notice, (FIN) 2017-02 ML17114A0702017-04-13013 April 2017 Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards ML17114A0712017-04-13013 April 2017 10 CFR Part 21 Notification of Deviation - Gkt Relay ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16251A0982016-09-0202 September 2016 Part 21 - Potential Failure of Battery System Connections ML16321A4502016-08-31031 August 2016 Part 21 Notification - Flowserve Swing Check Valves ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16039A2692016-02-0303 February 2016 Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15089A4372015-03-20020 March 2015 Part 21 - Dual Alarm Modules That May Contain Faulty Diodes in Single State Relays ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14105A0182014-04-11011 April 2014 Part 21 - Model 1154HP Transmitters with Integral 1159 Remote Diaphragm Seals May Exhibit Degraded Functional Reliability ML14094A4452014-04-0101 April 2014 Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems ML14069A4682014-03-0202 March 2014 Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML14042A2022014-02-0505 February 2014 Part 21 Report Regarding Unqualified Material Used in Electrical Penetration Assemblies ML13277A0102013-09-23023 September 2013 Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA) ML13246A0842013-08-23023 August 2013 Notification of Potential Defect & Interim Report Regarding a Potential Defect of Materials Supplied to Operating Us Nuclear Power Plants by Mirion Technologies (Conax Nuclear) Inc. (Mtcn) with Containment Electric Penetration Assemblies ML13238A2532013-08-21021 August 2013 Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13142A3292013-05-0606 May 2013 Notification of Potential Part 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0109, Rev. 0 ML13127A0142013-05-0303 May 2013 Part 21 Report - Fuel Injectors Failed Pressure Test ML13102A3032013-04-10010 April 2013 Part 21 Involving a Potential Weld Defect ML13093A1532013-04-0202 April 2013 Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective Tie Wraps and Holders ML13095A0112013-03-25025 March 2013 Update to Event Number 48798: 10 CFR Part 21 Notification, Dual Alarm Modules and Single Alarm Modules ML13073A1072013-03-12012 March 2013 Notification of Potential Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML13063A4432013-03-0101 March 2013 10 CFR Part 21 Report Notification, Dual Alarm Modules and Single Alarm Modules ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13002A4702012-12-28028 December 2012 10 C.F.R. Part 21 Notification to Customers - COM-5 and SSC-T Protective Relays - Telephone Relay Armature Pivot Pin, Resubmitted to Include Attachment 1, Which Was Inadvertently Omitted in the Original Fax ML13002A0302012-12-21021 December 2012 Part 21 Notification - Defect Discoveredd in COM-5 and SSC-T Protective Relays Distributed by Abb, Inc ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations 2021-09-09
[Table view] Category:Letter
MONTHYEARIR 05000266/20240032024-11-0505 November 2024 Integrated Inspection Report 05000266/2024003 and 05000301/2024003 ML24295A1142024-10-31031 October 2024 Suppl Env Audit Summary Letter W/Enclosure 1 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-160, Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41)2024-10-21021 October 2024 Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41) ML24295A0862024-10-21021 October 2024 Notification of NRC Baseline Inspection and Request for Information Inspection Report 0500026/2025002 L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-120, LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization2024-10-0808 October 2024 LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000266/2024011 and 05000301/2024011 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency ML24207A0202024-08-28028 August 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Point Beach Nuclear Plant, Units 1 and 2 (Docket Numbers: 50-0266 and 50-0301) IR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20240022024-08-13013 August 2024 Integrated Inspection Report 05000266/2024002 and 05000301/2024002 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24214A3092024-08-0202 August 2024 Confirmation of Initial License Examination ML24194A1802024-07-24024 July 2024 – Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections IR 05000266/20244012024-07-23023 July 2024 Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401 ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000266/20240102024-07-10010 July 2024 Age-Related Degradation Inspection Report 05000266/2024010 and 05000301/2024010 L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision IR 05000266/20244202024-06-0505 June 2024 Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24136A1952024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24130A0022024-05-0909 May 2024 Summary of Facility Changes, Tests and Experiments and Commitment Changes ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000305/20240012024-05-0202 May 2024 NRC Inspection Report No. 05000305/2024001 ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report IR 05000266/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000266/2024301; 05000301/2024301 L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report ML24116A0402024-04-23023 April 2024 Periodic Update of the Updated Final Safety Analysis Report ML24071A0912024-04-22022 April 2024 Issuance of Relief Request I6-RR-03 - Extension of the Unit 2 Steam Generator Primary Nozzle Dissimilar Metal Welds Sixth 10-Year Inservice Inspection Program Interval ML24101A0422024-04-22022 April 2024 Solutions Inc. – Exemption from Select Requirements of 10 CFR Part 73 ((Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24106A0492024-04-15015 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000266/20240012024-04-11011 April 2024 Integrated Inspection Report 05000266/2024001 and 05000301/2024001 2024-09-09
[Table view] |
Text
nESI) ENGINE SYSTEMS, INC.
175 Freight Road Rocky Mount, NC 27804 Telephone: 252/977-2720 Fax: 252/446-1134 June 26, 2007 U.S. Nuclear Regulator Commission Document Control Desk Mail Stop OP1 -17 Washington, DC 20555
Subject:
10CFR21 Reporting of Defects and Non-Compliance -
Engine Systems, Inc. Report No. 10CFR21-0093, Rev. 0 Camfil-Farr Air Intake Filter Housing, P/N: ES150801 -1
Dear Sir:
The enclosed report addresses a reportable notification applicable to a diesel engine air intake filter housing, P/N ES150801 -1, supplied by Engine Systems, Inc. in 2001.
A copy of the report has been mailed to our affected nuclear customers.
Please sign below, acknowledging receipt of this report, and return a copy to the attention of Document Control at the address above (or, fax to number 252/446-1134) within 10 working days after receipt.
Yours very truly, ENGINE SYSTEMS, INC.
Susan Woolard Document Control Please let us know if ANY of your mailing information changes - name of recipient, name of company/facility, address, etc. Mark the changes on this acknowledgment form and send to us by mail or FAX to the number above.
RECEIVED:
(93)
DATE:
419 Quality Performance With Pride
EI ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount, NC 27804 1cTelephone: 252/977-2720 Fax: 252/446-1134 Report No. 10CFR21-0093 Rev. 0: 06/25/07 10CFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT: Camfil-Farr air intake filter housing P/N: ESI50801-1 SYSTEM: Emergency Diesel Generator - intake air CONCLUSION: Reportable in accordance with 10CFR21.
Prepared By: Date:________
Engineering Manager Reviewed By: Date: _____
Quality Assurance Manager Quality Performance With Pride
Report No. 10CFR21-0093 Record of Revisions Page: 1 of 1 REV DATE PAGE DESCRIPTION 0 06/25/07 Initial issue.
I J
Report No. 10CFR21-0093 Revision: 0 Date: 06/25/07 Page: 1 of 3 COMPONENT:
Camfil-Farr intake air filter housing, part number ES150801-1 DISCUSSION:
Engine Systems Inc. (ESI) began a 10CFR21 evaluation on 4/27/07 to investigate cracking of an air intake filter housing at the Kewaunee Power Station (KPS) as shown in Figure 1 below. The evaluation was concluded on 6/25/07 and was determined to be a reportable defect as defined by 10CFR21.
Figure 1 1A Emergency Diesel Generator Air Box Cracking created a small gap to occur between the front and top surfaces of the housing. The gap was approximately 'A"at the highest point (near the center) and decreased on either side of the center point (overall crack length was approximately 10" long). The filter housing utilizes four (4) bag-type filter elements aligned horizontally. The vertical centerline of the housing is between the two (2) elements shown in Figure 1; another element is located beside each of the pictured elements. The crack resulted in a pathway for unfiltered air to enter the engine turbocharger.
Unfiltered air may contain foreign material that could cause turbocharger failure and/or premature engine wear.
Report No. 10CFR21-0093 Revision: 0 Date: 06/25/07 Page: 2 of 3 Possible causes of the cracking have been determined to be:
- 1. Lack of weld penetration during fabrication of the housing.
- 2. High residual stresses related to bowing on the top surface and/or improper fit up during fabrication.
- 3. Overload event during shipment, storage, installation, or some other time to promote crack initiation.
The filter housing was repaired on site by KPS personnel and therefore a detailed examination of the cracked housing could not be performed by ESI. KPS observations and inspections provide the following information:
- 1. Bowing of the filter housing was evident and documented by measurements on the top surface of the A EDG housing but was not present on the B EDG housing.
- 2. No cracking was present on the B EDG housing.
- 3. The filter housing was received without any physical damage.
- 4. The extent of bowing on the top plate at the time of installation is unknown.
- 5. The filter housing was installed in fall 2001 and has accumulated approximately 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> of run time. Damage to the housing was not observed during each of the three (3) subsequent refuel outages after installation; indicating that significant cracking did not occur until after the fall 2006 outage.
- 6. Natural frequency data for both EDG's suggests that factors other than fatigue contributed to the cracking, such as external force or high residual stress.
ESI inspected three (3) of the same part number filter housings that were in-house when the cracking condition was reported. The ESI inspections provide the following:
- 1. No bowing/distortion was observed along the top surface and all other seam welds.
- 2. Proper weld penetration of the seam welds at the air inlet end of the housings was confirmed by performing magnetic particle inspection.
- 3. Visual weld examination of all welds indicated conformance to accepted industry standards.
CONCLUSION:
Actual cause of the cracking cannot be determined, but can be attributed to the following:
- 1. Lack of weld penetration during fabrication of the housing.
- 2. High residual stresses related to bowing on the top surface and/or improper fit up during fabrication.
- 3. Overload event during shipment, storage, installation, or some other time to promote crack initiation.
The reported cracking is believed to be an isolated case; however, other users of filter housing part number ES150801-1 will be notified of this condition.
Report No. 10CFR21-0093 Revision: 0 Date: 06/25/07 Page: 3 of 3 AFFECTED USERS:
The following shipments of part number ES150801-1 filter housings are affected by this notification.
Part No. Customer Customer ESI SO Ship Date Qty Wisconsin Electric ES150801-1 Point Beach 4500346994 80492 Apr. 2001 2 ES150801-1 ESI50801-1 Wisconsin Public Service Kewaunee 273129 2I3129 87626 87I26 Sep.2001 Sep.I20 I2I 2 CORRECTIVE ACTION:
At the earliest convenience, affected users should inspect the air filter housings for any evidence of cracking and/or distortion that could indicate conditions of high residual stresses.