Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML02087025325 March 2002ASME Section XI Inservice Inspection Program Revised Relief Requests SR-023 and SR-029VT-2
Scaffolding
ML02142009522 May 2002Code Relief, ASME Section XI, IST Program Relief Request Granted
ML0223208701 October 2002Relief, ASME Section XI, Inservice Inspection Program Relief Request SR-27, 28, 32 and 33 Related to Repair Technique for Reactor Vessel Head Penetrations TAC Nos. MB3185 and MB3186Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Finite Element Analysis
Liquid penetrant
Dissimilar Metal Weld
ML02280036730 September 2002ASME Section XI Inservice Inspection Program Relief Request CMP-28 Extension of Reactor Vessel Inspection Schedule
ML03112038710 April 2003ASME Section XI Inservice Inspection Program Relief Request CMP-28, Revision 1 Extension of Reactor Vessel Inspection ScheduleGrace period
ML0312106961 May 2003ASME Section XI, ISI - Relief Request RR-IWE9 for Containment TestingNondestructive Examination
Liquid penetrant
ML0316814085 June 2003Risk-Informed ISI Relief Requests R-1 Response to Request for Additional InformationHydrostatic
VT-2
ML03266023523 September 2003N. Anna, Units 1 & 2 - Risk-Informed Inservice Inspection Relief Request R-1VT-2
Incorporated by reference
ML0330800204 November 2003Inservice Inspection Program Relief Request CMP-28, Revision 1, Extension of Reactor Vessel Inspection ScheduleIncorporated by reference
Grace period
ML0409605435 April 2004Relief, American Society of Mechanical Engineers Section XI Subsection Iwf Inservice Inspection, with Regard to the Functional Testing of SnubbersIncorporated by reference
ML0412700024 May 2004Request to Use Code Case N-663 as an Alternative for Surface Examination of ASME Code Class 2 Piping Welds(Tac MC2489, MC2490, MC2491, MC2523 & MC2524)Boric Acid
Non-Destructive Examination
Incorporated by reference
ML0419101182 July 20047/2/04, Surry, Units 1 & 2, Relief, Certain American Society of Mechanical Engineers (ASME) Inservice Testing (IST) Requirements. Proposed Alternatives in Relief Requests P-1, P3, P-4, P-5, P-6, P-7, V-2, V-3, V-4, V-5 & V-6 AcceptableBoric Acid
Stroke time
Temporary Modification
Incorporated by reference
Power-Operated Valves
Scaffolding
ML0424606321 September 2004Fourth Interval Inservice Testing Program Revised Relief Requests P-2
ML04259004113 September 2004Relief, Risk-Informed Inservice Inspection Relief Request R-1VT-2
Incorporated by reference
ML04273045328 September 2004American Society of Mechanical Engineers Inservice Testing Program, Revised Relief Requests P-2
ML04294028911 October 2004ASME Section Xl Inservice Inspection Program Partial Examination Relief RequestNondestructive Examination
VT-2
Liquid penetrant
Through-Wall Leakage
ML04295044416 October 2004Relief Request, American Society of Mechanical Engineers Inservice Inspection Program Third 10-Year IntervalNondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
DM weld
ML0500400544 January 2005Relief, Interval Request for Relief SR-004, Rev. 2, TAC MC3693Incorporated by reference
ML05018049510 January 2005ASME Section XI Inservice Inspection Program, End of Intervals System Pressure TestingHydrostatic
VT-2
Through-Wall Leak
ML0503406171 February 2005Ltr, Authorization of RR SR-036 & SR-037Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
DM weld
Grace period
ML05048066817 February 2005SE, Correction for ASME ISI (Tac No. MC3142, MC3143)
ML05101019611 April 2005ASME Section XI Relief Request Alternative Acceptance Criteria for Surface ExaminationsGrace period
ML0510204868 April 2005RR-8, ASME IST Requirements on Spray Pumps for Revised Relief P-8 (Tac No. MC6258)
ML05146043120 May 2005RR, Correction Letter for SR-36Incorporated by reference
Dissimilar Metal Weld
ML05153024820 May 2005ASME Section XI Inservice Inspection Relief Request Main Steam Line Branch Connection WeldoletsHydrostatic
Nondestructive Examination
Design basis earthquake
Earthquake
ML0520800068 August 2005Relief, Safety Significant Socket Weld Examinations, TAC MC3134Boric Acid
Probabilistic Risk Assessment
VT-2
Exemption Request
Dissimilar Metal Weld
ML05269031728 September 2005Relief Request, ASME Section XI ISI on Partial Examination (Tac No. MC4633, MC4634, MC4635, MC4636, MC4637)Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Through-Wall Leak
ML0529300321 November 2005Relief, Fourth 10-Year Inservice Inspection Program, MC5586, MC5587, MC5596, MC5597, MC5598, and MC5600Hydrostatic
VT-2
Incorporated by reference
Through-Wall Leak
ML0530402031 November 2005Relief Request, Fourth 10-Year Inservice Inspection SPT-008Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Incorporated by reference
Design basis earthquake
ML0604405462 February 2006Relief, Containment Relief Request IWL1
ML06054028428 March 2006Third 10-Year Inservice Inspection Interval Relief Request PRT-08VT-2
Incorporated by reference
ML06073046828 March 2006Relief, Third 10-Year Inservice Inspection Interval PRT-07VT-2
Incorporated by reference
ML06087013714 April 2006Third 10-Year Inservice Inspection Interval Relief Requests PRT-01 and PRT-02VT-2
Incorporated by reference
Through-Wall Leak
ML06117062327 April 2006Relief, Section XI Inservice Inspection Program Relief Requests PRT-07 and PRT-08 NRC Safety Evaluation Report Discrepancy
ML06151036531 May 2006Relief, Third 10-Year ISI Interval
ML06334029429 November 2006Surrry, Unit No. 2, Reply to Fourth 10-Year Inservice Inspection Interval Relief Request CMP-007, TAC MD2673Nondestructive Examination
VT-2
Incorporated by reference
Through-Wall Leak
ML0712700165 June 2007Relief, Forth 10-Year Inservice Inspection Interval Relief Request CMP-001, Revision 1Boric Acid
VT-2
Incorporated by reference
Aging Management
Foreign Material Exclusion
ML0714403423 August 2007Relief Request to Use Portion of 2001 Edition of American Society of Mechanical Engineers CodeIncorporated by reference
ML09300035227 October 2009Submittal of Relief Request SPT-004, Revision 2, SPT-003, Revision 2 and Elimination of NRC Bulletin 2003-02 CommitmentBoric Acid
VT-2
ML12130A21725 April 2012ASME Section XI Inservice Inspection (ISI) Program Request for Alternative - Implementation of Extended Reactor Vessel Inservice Inspection Interval Relief Requests CMP-007 and CMP-009Probabilistic Risk Assessment
ML12348A0089 November 2012ASME Section XI Inservice Inspection (Isl) Program Request for Alternative - Reactor Vessel Nozzle to Safe End Butt Welds Examination Relief Requests CMP-008 and CMP-010Dissimilar Metal Weld
ML13106A14030 April 2013Relief from the Requirements of the ASME Code Section XI for the Fourth Ten-Year Inservice Inspection Program IntervalProbabilistic Risk Assessment
Incorporated by reference
ML13204A2971 August 2013Relief from the Requirements of the ASME Code (Tacs. MF0329 and MF0330)Incorporated by reference
Dissimilar Metal Weld
ML14113A34625 April 2014Relief from the Requirements of the ASME Code
ML14115A19930 April 2014Relief from the Requirements of the ASME OM Code
ML14125A4719 May 2014Relief from the Requirements of the ASME CodeBoric Acid
Incorporated by reference
ML14309A66625 November 2014Relief from the Requirements of the ASME CodeBoric Acid
VT-2
Incorporated by reference
ML15023A44116 March 2015Alternatives to the Requirements of the ASME Code and Use of a Subsequent Edition and Addenda of the ASME B&PV Code, Section XIBoric Acid
VT-2
Incorporated by reference
ML15029A42410 February 2015Fifth 10-Year Inservice Inspection Interval Request for Subsequent Edition/AddendaIncorporated by reference
ML16208A00924 August 2016Requests for Relief LMT-R01, LMT-R02, LMT-R03, LMT-P01, and LMT-C01, Alternatives to ASME Code Requirements for Limited Coverage from the Requirements of the ASME CodeNondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Through-Wall Leak
Dissimilar Metal Weld
DM weld