Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML030930470 | 18 March 2003 | Comments on Peach Bottom SER | Safe Shutdown Incorporated by reference Aging Management License Renewal EVT-1 |
ML050540464 | 9 February 2004 | Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants | |
ML051640131 | 27 May 2005 | Advisory Committee Reports to AEC on Safety Aspects of Two Reactor Projects | |
ML051640238 | 27 May 2005 | Paper Subject: Consultant to Dl&R, Graphite for Gas Cooled Reactors | |
ML061510179 | 30 May 2006 | FOL Pages Associated W/License Transfer DPR-44 | Safe Shutdown Fire Protection Program |
ML070300034 | 12 January 2007 | Public Comments Submitted by E-mail: Eric Epstein, Three Mile Island Alert, Inc | |
ML072630114 | 14 September 2007 | / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 | |
ML072630319 | 14 September 2007 | P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List | |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML080360052 | 23 January 2008 | AR 00673505 Report, Aff Fac: Peach Bottom, AR Type: CR | |
ML080360075 | 23 January 2008 | Pennsylvania Senate Standing Committee Hearing Prep Book | |
ML080360295 | 23 January 2008 | Talking Points on Transition from Wackenhut/Wcbs | |
ML080460399 | 13 February 2008 | Power Reactor Inattentive Officer Findings 2004-Present | Significance Determination Process |
ML080670419 | 7 March 2008 | CDBI Findings | Reactor Vessel Water Level Stroke time Past operability Battery sizing |
ML081270289 | 24 March 2008 | Sign-in Sheet, Pb, Security Deviation Memo, 3/24/08 | |
ML081500377 | 29 April 2008 | Summary of Enhanced Monitoring of Security, Regarding Peach Bottom'S Security Officers | Inattentive |
ML081500378 | 29 April 2008 | Allegation Receipt Report, Regarding Allegation | |
ML081650308 | 9 June 2008 | Annual Assessment Meeting, Sign-In Sheet | |
ML090350043 | 3 February 2009 | Peter Stockton Comments to NRC Public Meeting, 2/3/09 | |
ML101110069 | 20 April 2010 | PBAPS Aam Sign-in Sheets, April 19, 2010 | |
ML101930460 | 25 March 2010 | List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants | |
ML102110375 | 2 March 2010 | Action Request Number: 00939717, Elevated Tritium Identified in New Sample Point | NJPDES Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML111080120 | 13 April 2011 | Public Meeting Attendance List, April 13, 2011 | |
ML111750219 | 22 June 2011 | NRC Inspection Findings Related to Closed Cooling Water Systems (1/1/2004 to 6/22/2011) | Condition Adverse to Quality Significance Determination Process |
ML11255A340 | 25 August 2011 | State-of-the-Art Reactor Consequence Analyses (Soarca), Peach Bottom Initial Information Needs | |
ML112710033 | 28 September 2011 | ROP Tabletop Examples and Results | Time of Discovery Mission time Significance Determination Process |
ML12024A073 | 31 March 2009 | Don Dube Comments; Soarca Secy and Associated Enclosures | |
ML12024A074 | 9 March 2009 | RES Response Comments; Don Dube Comments: Soarca Secy and Associated Enclosures | |
ML12056A052 | 12 March 2012 | Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | |
ML13133A148 | 4 March 2013 | Attendee List for Peach Bottom Aam on April 18, 2013 | |
ML13143A331 | 6 June 2013 | Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 | |
ML13211A403 | 30 July 2013 | EPU LAR Supplement 6 Attachment 2 - Response to Request for Additional Information - Snpb | Shutdown Margin Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Power change |
ML13364A283 | 30 December 2013 | Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 | Generic Fundamentals Examination |
ML14153A535 | 29 May 2014 | May 29, 2014 Aam, Attendance List | |
ML15071A119 | 2 March 2015 | Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | Safe Shutdown High winds Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Operating Basis Earthquake Operator Manual Action Nuclear Accident Reporting System Spent Fuel Pool Instrumentation Earthquake Fuel cladding Pressure Boundary Leakage |
ML15097A114 | 7 April 2015 | Soarca Peach Bottom 2006 Meteorological File | |
ML15113A298 | 23 April 2015 | Aam Attendance List, April 2015 | |
ML15120A229 | 11 March 2014 | NRC Comments on Fpra FAQ 14-0007, Transient Fire Frequency Likelihood (4/30/2015) | |
ML16102A115 | 6 April 2016 | Aam Attendance List | |
ML17128A016 | 8 May 2017 | May 3, 2017 Peach Bottom Attendance List for Public Meeting | |
ML18283B278 | 15 October 2018 | PBAPS PRA System Importance List | |
ML19247D287 | 4 September 2019 | Fws to NRC, Concurrence That Peach Bottom License Renewal Is Not Likely to Adversely Affect the Indiana Bat or Northern Long-eared Bat | |
ML20008D223 | 8 January 2020 | NRC Region I Twitter Feeds 10-1 to 12-31-2019 | New Resident Inspector |
ML23023A199 | 20 January 2023 | (PBAPS) Unit 2, ISI Owner'S Activity Report for the 24th Refueling Cycle Covering ISI Activities Associated with the First Period of the 5th ISI Inspection Interval for Unit 2 | |
ML23136A605 | 12 May 2023 | FAQ 23-02 Peach Bottom Performance Indicator Interpretation Request | |
ML23192A121 | 6 July 2023 | FAQ 23-03 - Peach Bottom Unit 1 Unplanned Scram with Complications Interpretation | |
RA-15-019, Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | 2 March 2015 | Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | Safe Shutdown High winds Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Operating Basis Earthquake Operator Manual Action Nuclear Accident Reporting System Spent Fuel Pool Instrumentation Earthquake Fuel cladding Pressure Boundary Leakage |
RS-20-140, Proposed Changes to Decommissioning Trust Agreements | 30 October 2020 | Proposed Changes to Decommissioning Trust Agreements | Exemption Request |