|
---|
Category:- No Document Type Applies
MONTHYEARML23192A1212023-07-0606 July 2023 FAQ 23-03 - Peach Bottom Unit 1 Unplanned Scram with Complications Interpretation ML23136A6052023-05-12012 May 2023 FAQ 23-02 Peach Bottom Performance Indicator Interpretation Request ML23023A1992023-01-20020 January 2023 ISI Owners Activity Report for the 24th Refueling Cycle Covering ISI Activities Associated with the First Period of the 5th ISI Inspection Interval for Unit 2 RS-20-140, Proposed Changes to Decommissioning Trust Agreements2020-10-30030 October 2020 Proposed Changes to Decommissioning Trust Agreements ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 ML19247D2872019-09-0404 September 2019 Fws to NRC, Concurrence That Peach Bottom License Renewal Is Not Likely to Adversely Affect the Indiana Bat or Northern Long-eared Bat ML18283B2782018-10-15015 October 2018 PBAPS PRA System Importance List ML17128A0162017-05-0808 May 2017 May 3, 2017 Peach Bottom Attendance List for Public Meeting ML16102A1152016-04-0606 April 2016 Aam Attendance List ML15113A2982015-04-23023 April 2015 Aam Attendance List, April 2015 ML15097A1142015-04-0707 April 2015 Soarca Peach Bottom 2006 Meteorological File RA-15-019, Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2015-03-0202 March 2015 Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15071A1192015-03-0202 March 2015 Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML14153A5352014-05-29029 May 2014 May 29, 2014 Aam, Attendance List ML15120A2292014-03-11011 March 2014 NRC Comments on Fpra FAQ 14-0007, Transient Fire Frequency Likelihood (4/30/2015) ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 ML13211A4032013-07-30030 July 2013 EPU LAR Supplement 6 Attachment 2 - Response to Request for Additional Information - Snpb ML13143A3312013-06-0606 June 2013 Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 ML13133A1482013-03-0404 March 2013 Attendee List for Peach Bottom Aam on April 18, 2013 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1127100332011-09-28028 September 2011 ROP Tabletop Examples and Results ML11255A3402011-08-25025 August 2011 State-of-the-Art Reactor Consequence Analyses (Soarca), Peach Bottom Initial Information Needs ML1117502192011-06-22022 June 2011 NRC Inspection Findings Related to Closed Cooling Water Systems (1/1/2004 to 6/22/2011) ML1110801202011-04-13013 April 2011 Public Meeting Attendance List, April 13, 2011 ML1011100692010-04-20020 April 2010 PBAPS Aam Sign-in Sheets, April 19, 2010 ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML1021103752010-03-0202 March 2010 Action Request Number: 00939717, Elevated Tritium Identified in New Sample Point ML12024A0732009-03-31031 March 2009 Don Dube Comments; Soarca Secy and Associated Enclosures ML12024A0742009-03-0909 March 2009 RES Response Comments; Don Dube Comments: Soarca Secy and Associated Enclosures ML0903500432009-02-0303 February 2009 Peter Stockton Comments to NRC Public Meeting, 2/3/09 ML0816503082008-06-0909 June 2008 Annual Assessment Meeting, Sign-In Sheet ML0815003772008-04-29029 April 2008 Summary of Enhanced Monitoring of Security, Regarding Peach Bottom'S Security Officers ML0815003782008-04-29029 April 2008 Allegation Receipt Report, Regarding Allegation ML0812702892008-03-24024 March 2008 Sign-in Sheet, Pb, Security Deviation Memo, 3/24/08 ML0806704192008-03-0707 March 2008 CDBI Findings ML0804603992008-02-13013 February 2008 Power Reactor Inattentive Officer Findings 2004-Present ML0803602952008-01-23023 January 2008 Talking Points on Transition from Wackenhut/Wcbs ML0803600752008-01-23023 January 2008 Pennsylvania Senate Standing Committee Hearing Prep Book ML0803600522008-01-23023 January 2008 AR 00673505 Report, Aff Fac: Peach Bottom, AR Type: CR ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0703000342007-01-12012 January 2007 Public Comments Submitted by E-mail: Eric Epstein, Three Mile Island Alert, Inc ML0615101792006-05-30030 May 2006 FOL Pages Associated W/License Transfer DPR-44 ML0516401312005-05-27027 May 2005 Advisory Committee Reports to AEC on Safety Aspects of Two Reactor Projects ML0516402382005-05-27027 May 2005 Paper Subject: Consultant to Dl&R, Graphite for Gas Cooled Reactors ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML0309304702003-03-18018 March 2003 Comments on Peach Bottom SER 2023-07-06
[Table view] |
Text
Summary of Enhanced Monitoring of Security Between 9/11/07 and 9/21/07, enhanced monitoring of Peach Bottom's security officers was undertaken by the Resident Inspectors. As part of this monitoring the following actions were taken: []
" Resident inspectors arrived at the site unannounced at 0300 on 9/11. Surprise inspections were made of 2 BRE's, the Supervisors office, the entrance station and both CAS and SAS. Monitoring was continued during swing shift hours.
During this time inspections were made of 1 additional BRE, the Security Shift Supervisors' office, and both CAS and SAS up through approximately 2030. All security officers appeared attentive. Discussions were held with numerous security officers and supervisors, there was no indication that anyone was aware of inattentive security officers. Discussions were also held regarding the status of security equipment and the ability to "capture" video from security cameras.
Both night shift and day shift security personnel were interviewed and no issues were raised.
- On 9/13, an unannounced inspection of the security "ready room" was made. It is noted that the door to this room is glass, but locked. Only portions of the room are visible through the door glass. Since the ready room location was moved within the last few months, the previous ready room was also inspected. Based on discussions with Exelon security supervision, this door was also kept locked and the glass was covered. This room is now a storage room for contaminated vacuum cleaners and is kept locked.
" Between 9/12-9/14 spot checks were made on security. The resident followed one, security officer on his rounds for about I hour and discussed morale, working conditions and inattentive security officers. No issues were raised.
- On 9/15/07 another unannounced inspection was conducted. CAS and SAS were both inspected, officers appeared attentive and no issues were raised. The resident was escorted to the Ready room and met with several security officers there. Apparently, PBAPS management was interviewing security as part of their internal investigation. The security personnel in the ready room felt that the inattentive security officer issue was being raisedby a former disgruntled employee. These officers were not aware of any inattentive security officers.
- On 9/18/07, an unannounced inspection of the ready room was made. Knock on the door was required for entry, since door is locked with "hard key". Since the ready room is a clean area within the RCA, one must clear the monitors (tone prompts) before gaining access to the room door. Plant manager was in the ready room discussing security and conditions with the SNS and several security officers. Also toured the SNS Office and Security Operations Area.
" On 9/19/07 another unannounced inspection was conducted at 0400. SAS and the armory were inspected and no issues were raised.
ormaton in this record was deleted in
~ wihe Fr e amof Inform~ation Ac-a On 9/20/2007, an unannounced tour of the ready room was made. Numerous officers and the SNS were present. This was the first time that we noted a security supervisor (Roy Woods) was stationed to provide continuous oversight of the ready room.
0 On 9/20/2007, made a visit to the former ready room and tried our new key. No one was in the room.
4 9/21/07 an unannounced inspection of the ready room was conducted at 0340.
Only a security supervisor was in the ready room and she appeared attentive.
Accompanied a security officer on his rounds, no issues raised. Went by the SNSS's office and discovered that Limerick SNSS's had been brought in to stand shift with PB SNSS. In addition, Wackenhut management had been assigned to shift to provide supervisory oversight 24/7. ,A "
(b)M7)a FD
Information in this record was deleted, in accordance withl*!ýreedom of Information Act FOLAJPA (b)(7)a FbT7)ala (Wý 7)al
(b)(7)a (b)(7)a