ML23023A199

From kanterella
Jump to navigation Jump to search
ISI Owners Activity Report for the 24th Refueling Cycle Covering ISI Activities Associated with the First Period of the 5th ISI Inspection Interval for Unit 2
ML23023A199
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 01/20/2023
From: Morris J, Weis M
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23023A197 List:
References
CCN: 23-02
Download: ML23023A199 (3)


Text

Page 1 of 3 FORM OAR-1 OWNERS ACTIVITY REPORT Report Number P2R24 Plant Peach Bottom Atomic Power Station, 1848 Lay Road, Delta, PA 17314 Unit No.

2 Commercial Service Date July 5, 1974 Refueling Outage Number P2R24 (if applicable)

Current Inspection Interval ISI = Fifth Inspection Interval / CISI = Third Inspection Interval (1st, 2nd, 3rd, 4th, other)

Current Inspection Period First Inspection Period (ISI and Containment ISI)

(1st, 2nd, 3rd )

Edition and Addenda of Section XI applicable to the Inspection Plans ASME Section XI 2013 Edition Date and Revision of Inspection Plans ER-PB-330-1001 Rev. 4 (10/16/2020), Rev. 5 (9/28/2021), Rev. 6 (10/25/2022)

Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same as above Code Cases used:

N-532-5, N-613-2, N-639, N-702, N-716-1, N-854, N-858, N-864 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of P2R24 conform to the requirements of Section XI (refueling outage number)

Signed Mark Weis, Fleet ISI Program Owner Date (Owner or Owners designee. Title)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by Hartford Steam Boiler Inspection and Insurance Company have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions 14732 I, N, R PA 3227 (Inspectors Signature)

(National Board Number and Endorsement)

Date Weis, Mark E.

Digitally signed by Weis, Mark E.

DN: cn=Weis, Mark E.

Date: 2023.01.20 14:23:05 -05'00' Morris, Jonathan Sherman Digitally signed by Morris, Jonathan Sherman Date: 2023.01.20 14:24:57

-05'00'

Page 2 of 3 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Examination Item Number Item Description Evaluation Description B-P B15.10 Leak found at N-16A nozzle during B-P Pressure Test in 2R23 (2020)

As found condition repaired in P2R23 (2020) and accepted for one cycle per EC 632907. Relief Request I5R-14 Revision 1 approves repair for remainder of 5th ISI interval, refer to ML22236A670.

E-A E1.12 Torus Pitting on Wetted Surfaces in Submerged Areas As found condition identified 4 areas which exceeded established global wall thinning limit and 10% wall loss criteria, IR 4533172. All locations were compared to the allowable local wall thinning limits and sufficient margin still exists. All areas were prepped and mitigated with Service Level 1 coating. All areas are now Category E-C components and will be inspected during the next period.

Page 3 of 3 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description Of Work Date Completed Repair/Replacement Plan Number 1

MS Isolation Valve AO-2-01A-086B AO-2-01A-086C AO-2-01A-086D Replaced studs and nuts on Main Steam Isolation Vales 10/28/2022 22-010 22-011 22-012 3

33HB-20 ESW Piping Repair pinhole leaks (2 total) with branch connection per EC 636830 5/27/2022 22-050 22-051 22-052 3

32GB-H43 and 32GB-S58 support Added new shim to support to restore design configuration 6/2/2021 21-086 3

32GB-H27 support Added new shim to support to restore design configuration 10/14/2021 21-110 MC N-200A Replace studs and nuts on torus access hatch 10/27/2022 22-005