Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000458/FIN-2002007-01 | Failure to properly lock open Valve CNM-FCV200 | Significance Determination Process | |
05000458/FIN-2007002-05 | Licensee-Identified Violation | ||
05000458/FIN-2008002-01 | Internal Operating Experience Not Used to Prevent Recurrence of Reactor Recirculation FCV Runbacks Insert Description (Section 1R19.1) | Reactor Vessel Water Level | |
05000458/FIN-2008002-02 | Condensate Demineralizer Tank Liner Failure (Section 1R19.2) | Significance Determination Process | |
05000458/FIN-2008002-03 | Improper Design Control for Evaluating Emergency Diesel Generator Turbocharger Combustion Air Pipe Stresses (Section 1R19.3) | ||
05000458/FIN-2008002-04 | Failure to Follow Reactor Startup Procedure Results in Six Control Rod Withdrawal Errors (Section 4OA2) | Significance Determination Process Fuel cladding | |
05000458/FIN-2008002-05 | Licensee-Identified Violation | Significance Determination Process Fuel cladding | |
05000458/FIN-2008003-01 | Inadequate Risk Assessment for Removing Control Building Chilled Water System from Service | Significance Determination Process Incremental Core Damage Probability Deficit | |
05000458/FIN-2008003-02 | Inadequate Risk Assessment While Troubleshooting Results in Unanticipated Reactor Power Oscillations | Significance Determination Process Incremental Core Damage Probability Deficit | |
05000458/FIN-2008003-03 | Failure to Follow a Radiation Protection Procedure | Significance Determination Process Substantial potential for overexposure | |
05000458/FIN-2008003-04 | Licensee-Identified Violation | Substantial potential for an overexposure | |
05000458/FIN-2008003-05 | Licensee-Identified Violation | High Radiation Area Substantial potential for overexposure | |
05000458/FIN-2008003-06 | Licensee-Identified Violation | Substantial potential for an overexposure | |
05000458/FIN-2008003-07 | Licensee-Identified Violation | Substantial potential for overexposure | |
05000458/FIN-2008004-01 | Inadequate Procedure for Staging the Station Blackout Diesel Generator during Severe Weather | High winds | |
05000458/FIN-2008004-02 | Inadequate Corrective Actions Results in Multiple Failures of Standby Service Water Switchgear Room Ventialtion Fans | Condition Adverse to Quality | |
05000458/FIN-2008004-03 | Inadequate Risk Assessment for Transformer Yard Maintenance While Shut Down | ||
05000458/FIN-2008004-04 | Turbine Building Siding Failure Below Design Specifications | ||
05000458/FIN-2008006-01 | Eight Examples of a Failure to Meet 10 CFR Part 50, Appendix B, Design Control (1R21.b.1) | Ultimate heat sink | |
05000458/FIN-2008006-02 | Failure to Recalculate Suppression Pool Peak Temperature Response (1R21.b.2) | ||
05000458/FIN-2008006-03 | Inadequate Testing Programs for 4-kV Circuit Breakers, Class 1E Molded Case Circuit Breakers, and the Emergency Diesel Generators (1R21.b.3) | ||
05000458/FIN-2008006-04 | Inadequate Implementation of Temporary Installation Procedure (1R21.b.4) | ||
05000458/FIN-2008006-05 | Inadequate Implementation of Operability Determination Procedure (4OA2.1) | ||
05000458/FIN-2008006-06 | Inadequate/Untimely Corrective Action for Failure of Magnesium-Rotor Motor-Operated Valves (4OA2.2) | Significance Determination Process Large early release frequency Fuel cladding | |
05000458/FIN-2009002-01 | Inadequate Risk Assessment While the Control Building Chilled Water System was Removed from Service | Significance Determination Process Incremental Core Damage Probability Deficit | |
05000458/FIN-2009002-02 | Licensee-Identified Violation | Fire Protection Program | |
05000458/FIN-2009002-03 | Licensee-Identified Violation | Fire Protection Program | |
05000458/FIN-2009002-04 | Licensee-Identified Violation | ||
05000458/FIN-2009002-05 | Licensee-Identified Violation | Significance Determination Process | |
05000458/FIN-2009003-01 | Failure to Identify and Formally Critique an Emergency Plan Weakness | Significance Determination Process | |
05000458/FIN-2009004-01 | Failure to Implement Containment Closure Procedure | Significance Determination Process | |
05000458/FIN-2009004-02 | Failure to Control Scaffold Construction | ||
05000458/FIN-2009004-03 | Failure to Maintain Reactor Core Isolation Cooling System Seismic Design | ||
05000458/FIN-2009004-04 | Failure to Ensure Standby Liquid Control System Test Tank Remained Drained | ||
05000458/FIN-2009005-01 | Main Steam Line Plus Seal Failure Results in Loss of Reactor Cavity Inventory | Significance Determination Process | |
05000458/FIN-2009005-02 | Failure to Ensure the Emergency Contact had Knowledge About a Shipment | ||
05000458/FIN-2009005-03 | Licensee-Identified Violation | Substantial potential for an overexposure | |
05000458/FIN-2009006-01 | Failure to Promptly Correct a Condition Adverse to Quality | Condition Adverse to Quality Significance Determination Process | |
05000458/FIN-2009008-01 | Inadequate Operability Determinations for a Degraded Diesel Exhaust Pipe | ||
05000458/FIN-2009008-02 | Licensee-Identified Violation | ||
05000458/FIN-2009402-01 | Security | ||
05000458/FIN-2010002-01 | Failure to Evaluate a Revised Equipment Tag Out | ||
05000458/FIN-2010002-02 | Failure to Verify Control Building Chiller Operability During Low Service Water Temperatures | ||
05000458/FIN-2010002-03 | Failure to Adequately Verify a Suitable Replacement Part Essential for Emergency Diesel Generator Operation | Mission time | |
05000458/FIN-2010003-01 | Inadequate Risk Assessment for High Pressure Core Spray Pump Room Unit Cooler Maintenance | Significance Determination Process Incremental Core Damage Probability Deficit | |
05000458/FIN-2010003-02 | Inadequate Procedure Results in Loss of Offsite Power to a 4160 Vac Safety Bus | ||
05000458/FIN-2010003-03 | Failure to Follow Radiation Work Permit Instructions | High Radiation Area Significance Determination Process Substantial potential for overexposure | |
05000458/FIN-2010003-04 | Licensee-Identified Violation | ||
05000458/FIN-2010004-01 | Failure to provide adequate decommissioning funding assurance from Dec. 31, 2008 through the present (10 CFR 50.75(b)) | ||
05000458/FIN-2010004-02 | Failure to provide complete and accurate information by failing to disclose its reliance on a contract in the March 2009 funds status report (10 CFR 50.75(f)(1) and 10 CFR 50.9) |