| Q | CCA | Title |
---|
05000458/FIN-2009006-01 | 2009Q1 | H.14 | Failure to Promptly Correct a Condition Adverse to Quality |
05000458/FIN-2009002-01 | 2009Q1 | H.8 | Inadequate Risk Assessment While the Control Building Chilled Water System was Removed from Service |
05000458/FIN-2009003-01 | 2009Q2 | P.1 P.1(a) | Failure to Identify and Formally Critique an Emergency Plan Weakness |
05000458/FIN-2009004-01 | 2009Q3 | H.4 H.5 | Failure to Implement Containment Closure Procedure |
05000458/FIN-2009004-02 | 2009Q3 | H.2 | Failure to Control Scaffold Construction |
05000458/FIN-2009004-03 | 2009Q3 | | Failure to Maintain Reactor Core Isolation Cooling System Seismic Design |
05000458/FIN-2009004-04 | 2009Q3 | P.3 | Failure to Ensure Standby Liquid Control System Test Tank Remained Drained |
05000458/FIN-2009008-01 | 2009Q3 | P.2 | Inadequate Operability Determinations for a Degraded Diesel Exhaust Pipe |
05000458/FIN-2009005-01 | 2009Q4 | | Main Steam Line Plus Seal Failure Results in Loss of Reactor Cavity Inventory |
05000458/FIN-2009005-02 | 2009Q4 | H.7 | Failure to Ensure the Emergency Contact had Knowledge About a Shipment |
05000458/FIN-2009402-01 | 2009Q4 | H.14 | Security |