Issue date | Title | |
---|---|---|
ML13175A212 | 18 June 2013 | Project, Units 1 and 2, Enclosure 4-1 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 1 Project Summary |
ML13310A615 | 7 August 2015 | 2013-09-Draft Written Examination |
ML13310A623 | 4 October 2013 | STP 2013-09 Draft Operating Test |
ML13310B609 | 4 October 2013 | STP 2013-09 Final Operating Test |
ML13323A186 | 12 November 2013 | Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 |
ML13339A736 | 29 January 2014 | Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies |
ML13354B833 | 23 January 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for South Texas Project, Units 1 and 2, TAC Nos.: MF0825 and MF0826 |
ML14164A303 | 15 May 2014 | Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 2 of 7 |
ML14164A308 | 15 May 2014 | Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 5 of 7 |
ML14164A314 | 15 May 2014 | Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 4 of 7 |
ML14164A318 | 15 May 2014 | Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 6 of 7 |
ML14181A498 | 1 May 2014 | 2014-05 - Final Written Exam |
ML14181A526 | 1 May 2014 | 2014-05-Draft Written Exam |
ML15293A563 | 2 October 2015 | 2015-10 Final Written Exam |
ML16207A534 | 28 April 2016 | Revision 18 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML16207A550 | 28 April 2016 | Revision 18 to Updated Safety Analysis Report, Chapter 7, Table of Contents |
ML16207A551 | 28 April 2016 | Revision 18 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML16207A579 | 28 April 2016 | Revision 18 to Updated Safety Analysis Report, Q&R 4.2-1 Through Q&R 4.5-4 |
ML16230A232 | 21 July 2016 | Responses to Apla Round 4 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing Application |
ML17019A002 | 11 July 2017 | Safety Evaluation, Enclosure 3 to Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 |
ML17038A223 | 11 July 2017 | Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 |
ML17319A652 | 9 October 2017 | 09 Final Op Test |
ML18310A040 | 6 November 2018 | NRC Integrated Inspection Report 05000498/2018003 and 0500499/2018003 |
ML20011D230 | 6 December 1989 | Special Rept:On 891029 & 1104,Train C of Reactor Vessel Water Level Sys Observed Alternating Indicating Wet & Dry Conditions in Display Processing Sys in Control Room.Caused by Failure of Fiber Optic Link.Fiber Optic Modum Replaced |
ML20012B686 | 7 March 1990 | Proposed Tech Spec,Eliminating Requirement to Shutdown If One of Four Pressurizer Level post-accident Monitoring Channels Inoperable |
ML20046C927 | 1 April 1993 | 1993 Graded Exercise Scenario Manual. |
ML20059J342 | 4 November 1993 | Forwards RAI Re Eals,In Connection W/Review of Proposed EALs in Rev 3 to Emergency Classification Procedure 0ERP01-ZV-IN01 |
ML20065G968 | 22 August 1990 | Proposed Tech Specs Re Steam Generator Level,Narrow Range Instrumentation |
ML20083M617 | 27 March 1984 | Rev 2 to Control Room Design Review;Criteria Rept |
ML20087J197 | 27 April 1995 | Proposed Tech Specs Re Required Operable Channels of Core Exit Thermocouples |
ML20121A239 | 30 April 2020 | Integrated Inspection Report 05000498/2020001 and 05000499/2020001 |
ML20129C194 | 3 June 1985 | Rev 3 to App L, Std Abbreviations List for All South Texas Project Labeling, of Control Room Design Review Criteria Rept |
ML20138L237 | 18 October 1985 | Forwards Missing Sections of 850826 Draft Ser.Sections Document NRC Evaluation of Indicated Portions of FSAR |
ML20140G433 | 12 June 1997 | Requests That Encl Info,Re Licensee 10CFR50.59 Evaluation of Elimination of Environ Qualification of Mechanical Components,Be Placed in PDR |
ML20148P037 | 31 March 1988 | Technical Specifications for South Texas Project,Unit 1. Docket No. 50-498.(Houston Lighting and Power Company) |
ML20206H636 | 5 May 1999 | Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support |
ML20207T517 | 31 March 1987 | Suppl 1 to Verification & Validation Process Final Rept for South Texas Project Qualified Display Processing Sys |
ML20211Q256 | 1 December 1986 | Rev 1 to Station Procedure OPEP02-ZG-0007, Coolant Activity & Radionuclide Trend for Failed Fuel |
ML20217G814 | 22 November 1994 | Rev 2 to 0PGP03-ZA-0101, Shutdown Risk Assessment |
ML20217G819 | 15 February 1997 | Rev 16 to 0POP03-ZG-0009, Mid Loop Operation |
ML20237G463 | 31 July 1987 | Safety Evaluation Report Related to the Operation of South Texas Project,Units 1 and 2.Docket Nos. 50-498 and 50-499. (Houston Lighting and Power Company) |
ML20245J802 | 3 August 1989 | Forwards Revised Response to Generic Ltr 88-17, Loss of Dhr. Personnel Will Be Trained Prior to Entry Into Reduced RCS Inventory Condition to Refresh Personnel on Hazards & difficulties.W/890804 Errata Memo |
ML20282A785 | 29 July 2020 | ST-2020-07 Draft Outlines |
ML21175A325 | 24 June 2021 | Technical Specification Bases Control Program |
ML22140A059 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML22140A064 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1, Responses to NRC Questions |
ML22140A077 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (Redacted) |
NOC-AE-02001290, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | 2 April 2002 | Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. |
NOC-AE-02001309, Supplement to Proposed Change to Radiation Monitoring Technical Specifications | 29 July 2002 | Supplement to Proposed Change to Radiation Monitoring Technical Specifications |
NOC-AE-02001386, Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs. | 11 September 2002 | Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs. |