ML13175A21218 June 2013Project, Units 1 and 2, Enclosure 4-1 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 1 Project Summary
ML13310A6157 August 20152013-09-Draft Written Examination
ML13310A6234 October 2013STP 2013-09 Draft Operating Test
ML13310B6094 October 2013STP 2013-09 Final Operating Test
ML13323A18612 November 2013Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1
ML13339A73629 January 2014Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies
ML13354B83323 January 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for South Texas Project, Units 1 and 2, TAC Nos.: MF0825 and MF0826
ML14164A30315 May 2014Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 2 of 7
ML14164A30815 May 2014Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 5 of 7
ML14164A31415 May 2014Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 4 of 7
ML14164A31815 May 2014Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 6 of 7
ML14181A4981 May 20142014-05 - Final Written Exam
ML14181A5261 May 20142014-05-Draft Written Exam
ML15293A5632 October 20152015-10 Final Written Exam
ML16207A53428 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML16207A55028 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 7, Table of Contents
ML16207A55128 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML16207A57928 April 2016Revision 18 to Updated Safety Analysis Report, Q&R 4.2-1 Through Q&R 4.5-4
ML16230A23221 July 2016Responses to Apla Round 4 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing Application
ML17019A00211 July 2017Safety Evaluation, Enclosure 3 to Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191
ML17038A22311 July 2017Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191
ML17319A6529 October 201709 Final Op Test
ML18310A0406 November 2018NRC Integrated Inspection Report 05000498/2018003 and 0500499/2018003
ML20011D2306 December 1989Special Rept:On 891029 & 1104,Train C of Reactor Vessel Water Level Sys Observed Alternating Indicating Wet & Dry Conditions in Display Processing Sys in Control Room.Caused by Failure of Fiber Optic Link.Fiber Optic Modum Replaced
ML20012B6867 March 1990Proposed Tech Spec,Eliminating Requirement to Shutdown If One of Four Pressurizer Level post-accident Monitoring Channels Inoperable
ML20046C9271 April 19931993 Graded Exercise Scenario Manual.
ML20059J3424 November 1993Forwards RAI Re Eals,In Connection W/Review of Proposed EALs in Rev 3 to Emergency Classification Procedure 0ERP01-ZV-IN01
ML20065G96822 August 1990Proposed Tech Specs Re Steam Generator Level,Narrow Range Instrumentation
ML20083M61727 March 1984Rev 2 to Control Room Design Review;Criteria Rept
ML20087J19727 April 1995Proposed Tech Specs Re Required Operable Channels of Core Exit Thermocouples
ML20121A23930 April 2020Integrated Inspection Report 05000498/2020001 and 05000499/2020001
ML20129C1943 June 1985Rev 3 to App L, Std Abbreviations List for All South Texas Project Labeling, of Control Room Design Review Criteria Rept
ML20138L23718 October 1985Forwards Missing Sections of 850826 Draft Ser.Sections Document NRC Evaluation of Indicated Portions of FSAR
ML20140G43312 June 1997Requests That Encl Info,Re Licensee 10CFR50.59 Evaluation of Elimination of Environ Qualification of Mechanical Components,Be Placed in PDR
ML20148P03731 March 1988Technical Specifications for South Texas Project,Unit 1. Docket No. 50-498.(Houston Lighting and Power Company)
ML20206H6365 May 1999Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support
ML20207T51731 March 1987Suppl 1 to Verification & Validation Process Final Rept for South Texas Project Qualified Display Processing Sys
ML20211Q2561 December 1986Rev 1 to Station Procedure OPEP02-ZG-0007, Coolant Activity & Radionuclide Trend for Failed Fuel
ML20217G81422 November 1994Rev 2 to 0PGP03-ZA-0101, Shutdown Risk Assessment
ML20217G81915 February 1997Rev 16 to 0POP03-ZG-0009, Mid Loop Operation
ML20237G46331 July 1987Safety Evaluation Report Related to the Operation of South Texas Project,Units 1 and 2.Docket Nos. 50-498 and 50-499. (Houston Lighting and Power Company)
ML20245J8023 August 1989Forwards Revised Response to Generic Ltr 88-17, Loss of Dhr. Personnel Will Be Trained Prior to Entry Into Reduced RCS Inventory Condition to Refresh Personnel on Hazards & difficulties.W/890804 Errata Memo
ML20282A78529 July 2020ST-2020-07 Draft Outlines
ML21175A32524 June 2021Technical Specification Bases Control Program
ML22140A05928 April 20221 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML22140A06428 April 20221 to Updated Final Safety Analysis Report, Chapter 1, Responses to NRC Questions
ML22140A07728 April 20221 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (Redacted)
NOC-AE-02001290, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.2 April 2002Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.
NOC-AE-02001309, Supplement to Proposed Change to Radiation Monitoring Technical Specifications29 July 2002Supplement to Proposed Change to Radiation Monitoring Technical Specifications
NOC-AE-02001386, Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs.11 September 2002Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs.