MONTHYEARML20217A2421999-09-30030 September 1999 Proposed Tech Specs Removing Parameters No Longer Applicable & Adding Tdf Value for Model 94 SGs in Place of Reactor Coolant Sys Flow ML20211Q2361999-09-0808 September 1999 Proposed Tech Specs 3/4.8.1,revised by Relocating 18-month Surveillance to Subject Sdg to Insps IAW Procedures Prepared in Conjunction with Mfg Recommendations to Section 3.8.1.1.4.8 of UFSAR ML20211Q8071999-09-0808 September 1999 Proposed Tech Specs & Associated Bases for Specification 3/4.8.1, AC Sources, to Eliminate Requirement for Accelerated Testing of Standby DGs & Associated NRC Reporting Requirements ML20211G2281999-08-24024 August 1999 Proposed Tech Specs Pages,Relocating Cycle Specific Operating Parameters from TSs to Colr,Including Moving Location of Insert 6 from Page 6-21 to Page 6-22 of Administrative Control Section & Renumbering Methods List ML20211C0371999-08-18018 August 1999 Proposed Tech Specs 3.4.9.3 Re Cold Overpressure Mitigation Curve Associated with Replacement SGs ML20209G9351999-07-15015 July 1999 Proposed Tech Specs 3.7.1.6 Re Atmospheric Steam Relief Valves ML20209G4461999-07-13013 July 1999 Proposed Tech Specs,Modifying 3.6.3 Action B,Clarifyin Use of Check Valve with Flow Through Valve Secured as Means to Isolated Affected Containment Penetrations ML20209C1511999-07-0101 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-80, Changing TSs 3.3.2 & 3.7.8 Allowing All Fuel Handling Bldg Exhaust Air Sys Components to Be Inoperable for Period of 8 Hours to Facilitate Repair of Train B Exhaust Booster Fan ML20209B5341999-06-24024 June 1999 Proposed Tech Specs Section 6.9.1.6.a,adding Min Measured RCS Flow,Which Lists Parameters Included in COLR ML20195E4701999-06-0707 June 1999 Proposed Tech Specs Pages Re Proposed Amend to Licenses NPF-76 & NPF-80,deleting Total Allowance,Sensor Error & Z Terms from ESFAS & RTS Instrumentation Trip Setpoint Tables of TS 2.2.1 & 3.3.2 ML20195E4211999-06-0707 June 1999 Proposed Tech Specs,Relocating cycle-specific RCS-related TS Parameter Limits to COLR ML20205S3511999-04-19019 April 1999 Proposed Tech Specs Bases Page 3/4 8-3 Removing Reference to Fast Transfer Capability That Is Inconsistent with STP Design Bases as Described in UFSAR Chapters 8.2 & 8.3 ML20205G8081999-03-30030 March 1999 Proposed Tech Specs,Relocating Section 3/4.3.3.4, Meteorological Instrumentation & Associated Bases Description to STP Trm,Per NUREG-1431 ML20204J9681999-03-22022 March 1999 Proposed Tech Specs Incorporating New TS for Atmospheric Steam Relief Valve Instrumentation & Revising TS 3.7.1.6 Re Atmospheric Steam Relief Valves ML20204D1581999-03-15015 March 1999 Proposed Tech Specs 3/4.7.9 for Snubbers to TRM ML20207D9651999-03-0202 March 1999 Proposed Tech Specs Change Clarifies Use of Check Valve with Flow Through Valve Secured as Means to Isolate Containment Penetration in TS 3.6.3 Action B ML20207C4721999-02-24024 February 1999 Proposed Tech Specs Bases 3/4.2.5,clarifying That Averaging of Only Three Channels Is Min Expected When Verifying DNB Parameter Compliance ML20202G6871999-01-26026 January 1999 Proposed Tech Spec Page 3/4 4-39,revising TS 4.4.10 for Alternate ISI of RCP Flywheels ML20199K5681999-01-20020 January 1999 Proposed Tech Specs Surveillance Requirement 4.7.1.2.1.a Re AFW Pump Performance Testing ML20198A2181998-12-10010 December 1998 Revised TS Pages,Adding Ref to TS Figure 2.1-2 to Bases Section 2.1.1 as Figure Provides DNBR Curves Appropriate to Alternate DNB Operating Criteria ML20198A1951998-12-0909 December 1998 Corrected TS Bases Pages B 3/4 8-15,-16 & -17,as Discussed During 981103 Telcon ML20196B8121998-11-23023 November 1998 Proposed Tech Specs Pages for Proposed Amends to Licenses NPF-76 & NPF-80,relocating Descriptive Design Info from TS 3/4.7.1.1 (Table 3.7-2) Re Orifice Sizes for Main Steam Line Code Safety Valves,To Bases Section ML20155J9031998-11-0303 November 1998 Proposed Corrected Tech Specs Bases 3/4 9-3 Re Water level- Refueling Cavity & Storage Pools ML20155D5561998-10-29029 October 1998 Proposed Tech Specs Pages for Proposed Amends to Relocate Snubber TS 3/4.7.9 to TRM ML20155D5801998-10-29029 October 1998 Proposed Tech Specs Pages for Amends to Relocate Portion of TS Surveillance Requirement for DG Fuel Oil Storage Tank to TRM ML20155D5441998-10-29029 October 1998 Proposed Tech Specs Pages for Proposed Amend to Relocate Turbine Overspeed Protection TS 3/4.3.4 to TRM ML20154M1621998-10-12012 October 1998 Revised Tech Specs Bases Pages B3/4 8-14 Through -17 ML20154C5071998-09-30030 September 1998 Proposed Tech Specs Bases Page B 3/4 9-2,removing Wording Re 10% Value for Clad Gap Iodine Isotopics ML20154C0051998-09-30030 September 1998 Proposed Tech Specs Reflecting Replacement SG Tube Insp Surveillance Differences & Deleting Provision Allowing Use of F* Alternate Repair Criteria ML20154A4281998-09-28028 September 1998 Proposed Tech Specs Re Requirements Associated with Control Room & Fuel Handling Bldg Ventilation Sys ML20151T1621998-08-31031 August 1998 Proposed Tech Specs 3.4.9.3 Re Cold Overpressure Mitigation Curve Associated W/Replacement SGs ML20238F0841998-08-28028 August 1998 Proposed Tech Specs Section 4.0.5,excluding Specified Containment Isolation Valves from ISI & Testing Requirements as Stated in Section XI of ASME Boiler & Pressure Vessel Code ML20236T5141998-07-22022 July 1998 Proposed Tech Specs Re Replacement SG Water Level Setpoint Differences ML20236R1461998-07-15015 July 1998 Proposed Changes to Current Tech Specs Bases ML20236L6311998-07-0707 July 1998 Proposed Tech Specs,Reflecting Rev of Criticality Analyses & Rack Utilization Schemes for Regions 1 & 2 of Spent Fuel Racks as Described in STP UFSAR & TSs ML20236N0001998-07-0606 July 1998 Proposed Tech Specs,Relocating RCS Design Features from TS Section 5.4 to UFSAR ML20236M6381998-07-0606 July 1998 Proposed Tech Specs,Relocating 3/4.3.3.3 Requirements for Seismic Instrumentation to Technical Requirements Manual ML20236K3481998-07-0606 July 1998 Proposed Tech Specs,Relocating 3/4.7.13 Requirements for Area Temp Monitoring Sys to Technical Requirements Manual ML20247F3321998-05-0707 May 1998 Proposed Tech Specs Pages,Reflecting Replacement SG Reactor Coolant Flow Differences ML20217P1441998-04-0202 April 1998 Proposed Tech Specs 3.4.5 Re voltage-based Repair Criteria ML20202H9771998-02-16016 February 1998 Proposed Tech Specs Pages,Implementing 1-volt voltage-based Repair Criteria for SG Tube Support plate-to-tube Intersections ML20198C3741997-12-31031 December 1997 Proposed Tech Specs 2.1,2.2 & 3/4.2.5 for Alternate Operation W/Reduced Measured RCS Flow ML20197A7211997-12-17017 December 1997 Proposed Tech Specs Pages,Revising TS 4.6.2.1 to Extend Surveillance Interval of Containment Spray Sys Nozzle Air Flow Test from Five Years to Ten Years ML20199H2081997-11-20020 November 1997 Revised TS Bases Page B 3/4 4-15 ML20199A6101997-11-0505 November 1997 Proposed Tech Specs Pages,Updating TS Bases Section 3/4.4.9, to Reflect Results of Revised Analysis That Was Reviewed & Accepted by NRC as Part of License Amends 55 & 44.Analysis Results Not Incorporated Into TS Bases Due to Oversight ML20210T7401997-09-0404 September 1997 Proposed Tech Specs,Revising TS to Allow Use of Elbow Tap Differential Pressure Measurements Instead of Precision Heat Balance Measurements to Determine RCS Total Flow Rate ML20217M8351997-08-18018 August 1997 Proposed Tech Specs Incorporating Revs to TS 3.7.1.6, Atomospheric Steam Relief Valves, to Ensure Automatic Feature of SG Power Operated Relief Valve Remains Operable During Mode 1 & 2 ML20210L5801997-08-14014 August 1997 Proposed Tech Specs Allowing Tolerance of RCS Volume Provided in Specification 5.4.2 to Account for SG Tube Plugging ML20198F2211997-08-0505 August 1997 Proposed Tech Specs,Providing Suppl Info Re Amends to Licenses to Convert STP TS to Improved STS Format ML20148G1531997-05-29029 May 1997 Proposed Tech Specs Providing Administrative Changes to Affected Page Re Removal of Surveillance Requirement 4.7.7.e.5 1999-09-08
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARNOC-AE-000661, Rev 4 to Severe Weather Plan, Including Summary of Changes.With1999-10-0404 October 1999 Rev 4 to Severe Weather Plan, Including Summary of Changes.With ML20217A2421999-09-30030 September 1999 Proposed Tech Specs Removing Parameters No Longer Applicable & Adding Tdf Value for Model 94 SGs in Place of Reactor Coolant Sys Flow ML20211Q8071999-09-0808 September 1999 Proposed Tech Specs & Associated Bases for Specification 3/4.8.1, AC Sources, to Eliminate Requirement for Accelerated Testing of Standby DGs & Associated NRC Reporting Requirements ML20211Q2361999-09-0808 September 1999 Proposed Tech Specs 3/4.8.1,revised by Relocating 18-month Surveillance to Subject Sdg to Insps IAW Procedures Prepared in Conjunction with Mfg Recommendations to Section 3.8.1.1.4.8 of UFSAR ML20211G2281999-08-24024 August 1999 Proposed Tech Specs Pages,Relocating Cycle Specific Operating Parameters from TSs to Colr,Including Moving Location of Insert 6 from Page 6-21 to Page 6-22 of Administrative Control Section & Renumbering Methods List ML20211C0371999-08-18018 August 1999 Proposed Tech Specs 3.4.9.3 Re Cold Overpressure Mitigation Curve Associated with Replacement SGs ML20210J0481999-07-28028 July 1999 STP Unit 1,Cycle 9 Startup Testing Summary Rept ML20209G9351999-07-15015 July 1999 Proposed Tech Specs 3.7.1.6 Re Atmospheric Steam Relief Valves ML20209H2131999-07-13013 July 1999 Rev 4,revised Pages 29 & 30 of 102 to Procedure 0ERP01-ZV-IN01, Emergency Classification ML20209H3371999-07-13013 July 1999 Rev 0 to 0PGP02-ZA-0004, Station Performance Data Collection,Categorization & Reporting ML20209G4461999-07-13013 July 1999 Proposed Tech Specs,Modifying 3.6.3 Action B,Clarifyin Use of Check Valve with Flow Through Valve Secured as Means to Isolated Affected Containment Penetrations ML20209C1511999-07-0101 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-80, Changing TSs 3.3.2 & 3.7.8 Allowing All Fuel Handling Bldg Exhaust Air Sys Components to Be Inoperable for Period of 8 Hours to Facilitate Repair of Train B Exhaust Booster Fan ML20209B5341999-06-24024 June 1999 Proposed Tech Specs Section 6.9.1.6.a,adding Min Measured RCS Flow,Which Lists Parameters Included in COLR ML20209H3151999-06-23023 June 1999 Rev 4 to 0PGP02-ZA-0003, Comprehensive Risk Management ML20195E4211999-06-0707 June 1999 Proposed Tech Specs,Relocating cycle-specific RCS-related TS Parameter Limits to COLR ML20195E4701999-06-0707 June 1999 Proposed Tech Specs Pages Re Proposed Amend to Licenses NPF-76 & NPF-80,deleting Total Allowance,Sensor Error & Z Terms from ESFAS & RTS Instrumentation Trip Setpoint Tables of TS 2.2.1 & 3.3.2 ML20209H3081999-06-0101 June 1999 Rev 3 to 0PGP04-ZA-0604, Probabilistic Risk Assessment Program ML20205S3511999-04-19019 April 1999 Proposed Tech Specs Bases Page 3/4 8-3 Removing Reference to Fast Transfer Capability That Is Inconsistent with STP Design Bases as Described in UFSAR Chapters 8.2 & 8.3 ML20205G8081999-03-30030 March 1999 Proposed Tech Specs,Relocating Section 3/4.3.3.4, Meteorological Instrumentation & Associated Bases Description to STP Trm,Per NUREG-1431 ML20204J9681999-03-22022 March 1999 Proposed Tech Specs Incorporating New TS for Atmospheric Steam Relief Valve Instrumentation & Revising TS 3.7.1.6 Re Atmospheric Steam Relief Valves ML20204D1581999-03-15015 March 1999 Proposed Tech Specs 3/4.7.9 for Snubbers to TRM ML20207D9651999-03-0202 March 1999 Proposed Tech Specs Change Clarifies Use of Check Valve with Flow Through Valve Secured as Means to Isolate Containment Penetration in TS 3.6.3 Action B ML20207C4721999-02-24024 February 1999 Proposed Tech Specs Bases 3/4.2.5,clarifying That Averaging of Only Three Channels Is Min Expected When Verifying DNB Parameter Compliance ML20202G6871999-01-26026 January 1999 Proposed Tech Spec Page 3/4 4-39,revising TS 4.4.10 for Alternate ISI of RCP Flywheels ML20199K5681999-01-20020 January 1999 Proposed Tech Specs Surveillance Requirement 4.7.1.2.1.a Re AFW Pump Performance Testing ML20198A2181998-12-10010 December 1998 Revised TS Pages,Adding Ref to TS Figure 2.1-2 to Bases Section 2.1.1 as Figure Provides DNBR Curves Appropriate to Alternate DNB Operating Criteria ML20198A1951998-12-0909 December 1998 Corrected TS Bases Pages B 3/4 8-15,-16 & -17,as Discussed During 981103 Telcon ML20196B8121998-11-23023 November 1998 Proposed Tech Specs Pages for Proposed Amends to Licenses NPF-76 & NPF-80,relocating Descriptive Design Info from TS 3/4.7.1.1 (Table 3.7-2) Re Orifice Sizes for Main Steam Line Code Safety Valves,To Bases Section ML20155J9031998-11-0303 November 1998 Proposed Corrected Tech Specs Bases 3/4 9-3 Re Water level- Refueling Cavity & Storage Pools ML20155D5441998-10-29029 October 1998 Proposed Tech Specs Pages for Proposed Amend to Relocate Turbine Overspeed Protection TS 3/4.3.4 to TRM ML20155D5561998-10-29029 October 1998 Proposed Tech Specs Pages for Proposed Amends to Relocate Snubber TS 3/4.7.9 to TRM ML20155D5801998-10-29029 October 1998 Proposed Tech Specs Pages for Amends to Relocate Portion of TS Surveillance Requirement for DG Fuel Oil Storage Tank to TRM ML20154M1621998-10-12012 October 1998 Revised Tech Specs Bases Pages B3/4 8-14 Through -17 ML20154C0051998-09-30030 September 1998 Proposed Tech Specs Reflecting Replacement SG Tube Insp Surveillance Differences & Deleting Provision Allowing Use of F* Alternate Repair Criteria ML20154C5071998-09-30030 September 1998 Proposed Tech Specs Bases Page B 3/4 9-2,removing Wording Re 10% Value for Clad Gap Iodine Isotopics ML20154A4281998-09-28028 September 1998 Proposed Tech Specs Re Requirements Associated with Control Room & Fuel Handling Bldg Ventilation Sys ML20151T1621998-08-31031 August 1998 Proposed Tech Specs 3.4.9.3 Re Cold Overpressure Mitigation Curve Associated W/Replacement SGs ML20238F0841998-08-28028 August 1998 Proposed Tech Specs Section 4.0.5,excluding Specified Containment Isolation Valves from ISI & Testing Requirements as Stated in Section XI of ASME Boiler & Pressure Vessel Code ML20236T5141998-07-22022 July 1998 Proposed Tech Specs Re Replacement SG Water Level Setpoint Differences ML20236R1461998-07-15015 July 1998 Proposed Changes to Current Tech Specs Bases ML20236L6311998-07-0707 July 1998 Proposed Tech Specs,Reflecting Rev of Criticality Analyses & Rack Utilization Schemes for Regions 1 & 2 of Spent Fuel Racks as Described in STP UFSAR & TSs ML20236K3481998-07-0606 July 1998 Proposed Tech Specs,Relocating 3/4.7.13 Requirements for Area Temp Monitoring Sys to Technical Requirements Manual ML20236M6381998-07-0606 July 1998 Proposed Tech Specs,Relocating 3/4.3.3.3 Requirements for Seismic Instrumentation to Technical Requirements Manual ML20236N0001998-07-0606 July 1998 Proposed Tech Specs,Relocating RCS Design Features from TS Section 5.4 to UFSAR ML20247F3321998-05-0707 May 1998 Proposed Tech Specs Pages,Reflecting Replacement SG Reactor Coolant Flow Differences ML20217P1441998-04-0202 April 1998 Proposed Tech Specs 3.4.5 Re voltage-based Repair Criteria ML20202H9771998-02-16016 February 1998 Proposed Tech Specs Pages,Implementing 1-volt voltage-based Repair Criteria for SG Tube Support plate-to-tube Intersections ML20198C3741997-12-31031 December 1997 Proposed Tech Specs 2.1,2.2 & 3/4.2.5 for Alternate Operation W/Reduced Measured RCS Flow ML20197A7211997-12-17017 December 1997 Proposed Tech Specs Pages,Revising TS 4.6.2.1 to Extend Surveillance Interval of Containment Spray Sys Nozzle Air Flow Test from Five Years to Ten Years ML20199H2081997-11-20020 November 1997 Revised TS Bases Page B 3/4 4-15 1999-09-08
[Table view] |
Text
-- .
~;i,i3.l.f ciliilT 3 I~
[
- .; . i 5li'.HL-l4 35VR 1.- , ,
- l. PAGE 1 0F 4- i
- - .}NSTRUMENTATION -
4; , e l7 L;
ACCIDENT M3NITOR]NG INSTRUMENTATION LIMfTING CONDITION FOR OPERAT!ON .
~!
3.3.3,6DThe accident monitoring instrumentation channels shown in Table 3.3-10 1 shall be OPERABLE. i m
APPLICABILITY:' MODES 1, 2, and 3.
ACTION:
, .a. As shown in Table 3.3-10.
- b. The provisions of. S;ecification 3.0.4 are not applicable. .,
1 SURVElll4NCE REOUIREMENTS
.4.3.3.6 Each accident monitoring instrumentation' channel'shall be demonstrated ,
OPERABLE by performance.of the CHANNEL CHECK' and CHANNEL CALIBRATION at the: .l f recuencies shown in Table 4.1-7. i E
e i
yc ; ~. w i C.!
3 6,.
f' SOUTH TEXAS - UN]TS 1 & 2 3/4 3-67 >
.y 9010240307 PDR 900822 ADOCK 05000498 PDC
- ~
A.
l$: ? ~h -
i-y, TABLE-3.3 -
g _
3;;* ACCIDENT MONITORING INSTRUNDITATION -
[
m ^!
TOTAL ~ MINIMUM
.g NO.~ OF CHANNELS
, INSTRUMENT CHANNELS OPERABLE ACTION C
$ 1. Containment-Pressure 4 -
1 '38' d
g 2. Reactor Coolant. Outlet Temperature .
,. TH0T (Wide Range) .
1/ loop .1/ loop 35 m - . i
- 3. Reactor Coolant Inlet Temperature - _
T T ange) 1Ig 35' COLD ,
m
- 4. Reactor Coolant Pressure and Extended Range Wide Range 3 1 37 j 1
- 5. Pressurizer Water Level 4 1 43- .j E 6. Steam Line Pressure 4/ steam generator 1/ steam generator 38 i 7. Steam Generator Water Level -
Narrow Range 4/ steam generator 1/ steam generator ;381[3
! 8. Steam Generator Water Level - -
.i l wide Range: 1/ steam generator 1/ steam generator 35 (r 9. Refueling Water Storage Tank Water-Level 3 cf m
1 37- .l
! 5 10. Auxiliary Feedwater Storage Tank- g<4>
g Water Level 3 1 37 gi.h Y'
- 11. Auxiliary Feedwater Flow 1/ steam generator .1/ steam generator 35
. ':o :
> t., '
-g 12. Reactor Coolant System Subcooling. w .;
Margin Monitor @ j$"
a 2 "
1 36 te c~
~
\' ~
[*, .h *f ' .
17
._ f - ,
- ~
7
? ..: . - _
,,a O..
. TABLE 3.3-10 (Continued). _
~
e.
s' ACCIDENT MONITORING INSTRUNENTATION h TOTAL MINIMUM c- No. of cunanEls -.
. INSTRtMENT ,
CHANNELS OPERABLE' ACTION C
- 5. 13. Containment Water level
,7 (Narrnw Ranry-) 7 1- 36 l -
14 Contaieument Water tevet (wide Naewp-) ' J -1 ,
3r-
~ .-
- 15. Core Exit Thermocouples 4 tk. C g les/ core quadrant
-42 E (i
- 16. Steam Line Radiation Monitor- 1/ steam line 1/ steam line 40. j
$ 17. . Containment - Nigh Range Radiation Monitor D w 2 1 39 G
- 18. - Reactor Vessel Water level (RWL) 1* M-
- 2*
41 %
- 19. Neutron Flum (Extended Range) '~2 1 36
- 20. Containment Nydrogen Concentration 2 l' --
36
- 21. Containment Pressure (Extended Range) 2 1 36
- 22. Steam Generator Slowdown Radiation -
Monitor ,
1/ blow & m line 1/blowdsun 11ne . 40 g _B
, 23. Neutron Flux - Startup Rate .. $-i-(Extended Range) 2 1 36 1
4
-C A Wrp
- A channel'is'eight sensors.in a. probe..'A channel is OPERA 8tE if fewe or more sensors, one er nore :m in the opper section and three or more'in the lower section, are OPERABLE.- - "
- A total-of 50 thermocouples are provided with 25.thermocouples on~each'of two trains. Quodrants O and D have 6 thermocouples per train each. Quadrants A and C each have 6 thermocouples on one train and 7 thermocouples on the other train. .No ACTION-is requi. red asilong as each quadrant has 4 p'
thermocoopies per train OPERABLE.-
.._ . _ , . . ..... .. .. -.. . . . , _ _ _ , _ __ _ r .. . . , . . . . ...._.,m.,.m, , m, _ .. ,._,._g, , . , _ _ _ , _ , _ ,
- ,=N6 C M N S .i
' ~
TABLE 3.3-30-(Continued); " j 5 jj[NT't
~
ACTION STATEMENTS
. OT HL AE AW4 1 PME-4 0F E !I' ;
! ACTION With the number of OPERABLE channels less than the Minimum .
Channels Operable requirement,< restore at least one inoperabJe :l channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, or be in at least:
HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
~ ACTION 36 - a. With the number of OPERABLE channels one less than the Total Number of Channels' requirements, restore ~one inoperable channel to OPERABLE status within 7 days.: or be _in at least HOT SHUTDOWN m within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,
- b. With the number of OPERABLE channels less than the Minimum -
Channels Operable requirements', restore at least one inoperable; [
channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
ACT10N 3T - a. With the number of OPERABLE channels one less than-the Total-Number of Channels requirements, restore-the inoperable channel' to' 0PERABLE status within 31 days, or be in at least HOT SHUTDOWN within~the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. With the number of OPERABLE channels two less than the: Total Number of Channels requirement, restore at least:one inoperabie channel to- OPERABLE statu's within _7 days, or be in at least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- c. With~ the number of OPERABLE channels less than the Minimu'm Channels Operable. requirement, restore at least one inoperab' e- 4 channel to OPERABLE status 'within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least -
HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. ,
. ACTION 38 '- a. With the: number of OPERABLE channels one less than. the Total-
Num';er of Chan_nels requirements,.' restore'the-inoperable channel to OPERABLE status within-90 days, or-be in at least HOT St.UTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. With the number of OPERABLE channels two less than the Total' ,
fumber of Channels requirements, ~ restore the inoperable channel 3 to OPERABLE status;within 31 days, or be in at least' HOT SHUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
j_
- c. With the number of OPERABLE channels three less than the Total (
Number of Channels requirement, restore at least one inoperable channel to OPERABLE status within-7 ~ days.-or be in at least HOT :
, SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. 'I
- d. With the number of OPERABLE channels less than the Minimum Channels Operable requirement, restore at least one inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. '
SOUTH TEXA5 - UNITS 1 & 2 3/4 3-70 s
i
n ,
h 5- N C, - (. f4 A r4G C W
{
. TABLE'3.3-10 (Continued)
H..R !-TTACHMENT !L ACTION STATEMENTS (Continued) ST HL AE-WW CAGE T OF 0 Ij ACTION 39 - a.= With the number of OPERABLE. channels one less'than the-Total Number of Channels requirements, restore one. inoperable channel to OPERABLE. status within 7 days, or be in at least HOT C F
SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4
- b. With the number of OPERABLE channels less than the Minimum .i Channels Operable requirements', restore at least one inoperable. 4 channel to OPERABLE stttus within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
ACTION 40 - With the number of-OPERABLE channels.less than the Minimum ,
Channels Operable-requirements,-restore at least one. inoperable
,' channel-to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />,~or be in at least HOT SHUTDOWN within the r. ext 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. y l '
ACTION 41 'a'..With the' number of-OPERABLE channels-one less than the Requi. red-
! Number of Channels, either restore the system to OPERABLE i status Within 7 days if. repairs are feasible without shutting oown or: prepare and subm.it a Special Report to the Commission.
pursuant .to Spe'cification 6.-9.2 within 30 days following the event outlining the action taken, the cause of the inoperability a' 1 and the plans and schedule for restoring the-~ system to OPERABLE' 3 status. :
i
- b. With the number of OPERABLE Channels one less than the Minimum Channels OPERABLE"in Table 3.3-10' either restore the inoperable;
, g W channel (s) to OPERABLE status >within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> if repairs are feasible without shutting down or:
- 1. Initiate an alternate method of monitoring the reactor vessel inventory; q
- 2. Prepare and submit a Special Report.to the Commission pursuant to Specification 6.9.2-within 30 days following the event outlining the' action taken, the cause-of,the-n inoperability. and the plans and schedule for restoring -
the system to 0PERABLE status; and ios ;
Restore the system to OPERABLE status at the'next
~
, , 3.
scheduled refueling. !
ACT10N:42 - a. With the number of OPERABLE channels less than 4 thermocouples ;
per quadrant per train, restore these thermocouples to OPERABLE
- status within 31 days,-or be in at least HOT SHUTDOWN within the next 12: hours.
L ,
-b. With the number of OPERABLE channels less than 6 thermocouples per quadrant, restore these thermocousles to OPERABLE status within 7 days, or be in at least HOT 5 HUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- SOUTH TEXAS - UNITS 1 & 2 3/4 3-71 4
' A~TACriMENTA -!
ST HL-AE 3544 - -
7 PAGE /o 0F ' to '
- 3
. ;, TABLE 3;3-10 (Continued)
. f
-ACTION STATEHENTS (Continued) i
~
, c. With the number of OPERABLE channels less than 4 thermo- J couples per quadrant, restore these thermocouples to
, .i
OPERABLE status within 48 nours, or be in at least NOT [
i' .!
. SJfyT.DOWN within the m next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. e<_ t
. , , - - -a --
.):
/-
ACTION 43 - ~ a. .With the number of OPERABLE channels two less than the' Total Number of Channels requirements,' restore the , -
' inoperable channel to OPERABLE status within 31 days, or . F L be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />., '
i
- b. With'the number of OPERABLE- channels three less than the i Total Number of Channels requirement, restore at least one >
inoperable channel to OPERABLE status within 7 days, or be ;
-in at least HOT SHUTDOWN within the next-12 hours. ,,
1 1
- c. With the number of OPERABLE channels less than the Minimum-Channels Operable requirement, restore et least one
- l. inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or i be in at least HOT SHUTDOWN withu the:next'12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. - 4 l
i 6
D 4
i a '-
1 L- <
l; '.
i n
lr SOUTH-TEXAS - UNITS 1 & 2 3/4 3-72 AMENDMENT NOS. 14 AND 4
- - _ _ _ _ _ _ . ._- _ . . - .. .- , ,