ML20065G968
| ML20065G968 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/22/1990 |
| From: | HOUSTON LIGHTING & POWER CO. |
| To: | |
| Shared Package | |
| ML20065G965 | List: |
| References | |
| NUDOCS 9010240307 | |
| Download: ML20065G968 (6) | |
Text
--
~;i,i3.l.f ciliilT 3 I~
[
i 5li'.HL-l4 35VR 1.-
.}NSTRUMENTATION
- l. PAGE 1 0F 4-i 4;,
e l7 ACCIDENT M3NITOR]NG INSTRUMENTATION L;
LIMfTING CONDITION FOR OPERAT!ON
~!
3.3.3,6DThe accident monitoring instrumentation channels shown in Table 3.3-10 1
shall be OPERABLE.
i m
APPLICABILITY:' MODES 1, 2, and 3.
ACTION:
.a.
As shown in Table 3.3-10.
b.
The provisions of. S;ecification 3.0.4 are not applicable.
SURVElll4NCE REOUIREMENTS 1
.4.3.3.6 Each accident monitoring instrumentation' channel'shall be demonstrated OPERABLE by performance.of the CHANNEL CHECK' and CHANNEL CALIBRATION at the:
.l f recuencies shown in Table 4.1-7.
i E
e i
yc
- ~. w i C.!
3 6,.
f' SOUTH TEXAS - UN]TS 1 & 2 3/4 3-67 9010240307 900822
~
A.
l$:
? ~h -
i-TABLE-3.3 y, g
3;;*
ACCIDENT MONITORING INSTRUNDITATION
[
m TOTAL ~
MINIMUM
^!
.g NO.~ OF CHANNELS INSTRUMENT CHANNELS OPERABLE ACTION C$
1.
Containment-Pressure 4
1
'38' d
2.
Reactor Coolant. Outlet Temperature g
TH0T (Wide Range) 1/ loop
.1/ loop 35 m
i 3.
Reactor Coolant Inlet Temperature -
l T
T ange) 1Ig 35' COLD 4.
Reactor Coolant Pressure Wide Range 3
1 37 j
and Extended Range t
m1 5.
Pressurizer Water Level 4
1 43-
.j E
6.
Steam Line Pressure 4/ steam generator 1/ steam generator 38 I
t i
7.
Steam Generator Water Level -
Narrow Range 4/ steam generator 1/ steam generator
- 381[3 8.
Steam Generator Water Level -
.i l
wide Range:
1/ steam generator 1/ steam generator 35 (r
9.
Refueling Water Storage Tank Water-cf Level 3
1 37-
.l m
5 10. Auxiliary Feedwater Storage Tank-g<4>
g Water Level 3
1 37 gi.h j
Y'
':o 11.
Auxiliary Feedwater Flow 1/ steam generator
.1/ steam generator 35 t., '
@ j$"
-g 12.
Reactor Coolant System Subcooling.
w Margin Monitor 2
1 36 a
te l
c~
\\'
~
~
[*,.h *f '.
f 17
~
7
?..:
,,a O..
TABLE 3.3-10 (Continued).
.e.
~
s' ACCIDENT MONITORING INSTRUNENTATION h
TOTAL MINIMUM c-No. of cunanEls -.
INSTRtMENT CHANNELS OPERABLE' ACTION C
5.
- 13. Containment Water level
,7 (Narrnw Ranry-)
7 1-36 l
14 Contaieument Water tevet (wide Naewp-) '
J
-1 3r-
~
15.
Core Exit Thermocouples 4 tk. C g les/ core
-42 E
quadrant (i
- 16. Steam Line Radiation Monitor-1/ steam line 1/ steam line 40.
j
$ 17.. Containment - Nigh Range Radiation Monitor 2
1 39 D
w G
- 18. - Reactor Vessel Water level (RWL)
- 2*
1*
41 %
M-
- 19. Neutron Flum (Extended Range)
'~2 1
36
- 20. Containment Nydrogen Concentration 2
l' 36
- 21. Containment Pressure (Extended Range) 2 1
36
- 22. Steam Generator Slowdown Radiation g _B "
Monitor 1/ blow & m line 1/blowdsun 11ne
. 40
- 23. Neutron Flux - Startup Rate
.. $-i-(Extended Range) 2 1
36
-C 1 4
A Wrp
- A channel'is'eight sensors.in a. probe..'A channel is OPERA 8tE if fewe or more sensors, one er nore
- m in the opper section and three or more'in the lower section, are OPERABLE.-
- A total-of 50 thermocouples are provided with 25.thermocouples on~each'of two trains. Quodrants O and D have 6 thermocouples per train each. Quadrants A and C each have 6 thermocouples on one train and 7 thermocouples on the other train..No ACTION-is requi. red asilong as each quadrant has 4 p'
thermocoopies per train OPERABLE.-
r
...._.,m.,.m, m,
,._,._g,
- ,=N6 C M N S
.i
~
TABLE 3.3-30-(Continued);
" j 5 jj[NT't ACTION STATEMENTS
. OT HL AE AW4
~
1 PME-4 0F E
!I'
! ACTION With the number of OPERABLE channels less than the Minimum Channels Operable requirement,< restore at least one inoperabJe
- l channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, or be in at least:
HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
~ ACTION 36 - a. With the number of OPERABLE channels one less than the Total Number of Channels' requirements, restore ~one inoperable channel to OPERABLE status within 7 days.: or be _in at least HOT SHUTDOWN m
within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,
- b. With the number of OPERABLE channels less than the Minimum Channels Operable requirements', restore at least one inoperable;
[
channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
ACT10N 3T - a. With the number of OPERABLE channels one less than-the Total-Number of Channels requirements, restore-the inoperable channel' to' 0PERABLE status within 31 days, or be in at least HOT SHUTDOWN within~the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. With the number of OPERABLE channels two less than the: Total Number of Channels requirement, restore at least:one inoperabie channel to-OPERABLE statu's within _7 days, or be in at least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- c. With~ the number of OPERABLE channels less than the Minimu'm Channels Operable. requirement, restore at least one inoperab' e-4 channel to OPERABLE status 'within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least -
HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
. ACTION 38 '- a. With the: number of OPERABLE channels one less than. the Total-Num';er of Chan_nels requirements,.' restore'the-inoperable channel to OPERABLE status within-90 days, or-be in at least HOT St.UTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. With the number of OPERABLE channels two less than the Total' fumber of Channels requirements, ~ restore the inoperable channel 3
to OPERABLE status;within 31 days, or be in at least' HOT SHUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
j_
- c. With the number of OPERABLE channels three less than the Total
(
Number of Channels requirement, restore at least one inoperable channel to OPERABLE status within-7 ~ days.-or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
'I
- d. With the number of OPERABLE channels less than the Minimum Channels Operable requirement, restore at least one inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SOUTH TEXA5 - UNITS 1 & 2 3/4 3-70 i
s
n h
5-N C, - (. f4 A r4G C W
{
. TABLE'3.3-10 (Continued)
H..
!-TTACHMENT !L ACTION STATEMENTS (Continued)
ST HL AE-WW R
CAGE T OF 0 Ij ACTION 39 - a.= With the number of OPERABLE. channels one less'than the-Total Number of Channels requirements, restore one. inoperable channel to OPERABLE. status within 7 days, or be in at least HOT C
SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
F 4
- b. With the number of OPERABLE channels less than the Minimum
.i Channels Operable requirements', restore at least one inoperable.
4 channel to OPERABLE stttus within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
With the number of-OPERABLE channels.less than the Minimum ACTION 40 -
Channels Operable-requirements,-restore at least one. inoperable channel-to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />,~or be in at least HOT SHUTDOWN within the r. ext 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
y l
ACTION 41
'a'..With the' number of-OPERABLE channels-one less than the Requi. red-Number of Channels, either restore the system to OPERABLE i
status Within 7 days if. repairs are feasible without shutting oown or: prepare and subm.it a Special Report to the Commission.
pursuant.to Spe'cification 6.-9.2 within 30 days following the a'
event outlining the action taken, the cause of the inoperability 1
and the plans and schedule for restoring the-~ system to OPERABLE' 3
status.
i
- b. With the number of OPERABLE Channels one less than the Minimum Channels OPERABLE"in Table 3.3-10' either restore the inoperable; g
W channel (s) to OPERABLE status >within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> if repairs are feasible without shutting down or:
1.
Initiate an alternate method of monitoring the reactor vessel inventory; q
2.
Prepare and submit a Special Report.to the Commission pursuant to Specification 6.9.2-within 30 days following the event outlining the' action taken, the cause-of,the-inoperability. and the plans and schedule for restoring n*
the system to 0PERABLE status; and ios 3.
Restore the system to OPERABLE status at the'next
~
scheduled refueling.
ACT10N:42 - a. With the number of OPERABLE channels less than 4 thermocouples per quadrant per train, restore these thermocouples to OPERABLE status within 31 days,-or be in at least HOT SHUTDOWN within the next 12: hours.
L
-b. With the number of OPERABLE channels less than 6 thermocouples per quadrant, restore these thermocousles to OPERABLE status within 7 days, or be in at least HOT 5 HUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- SOUTH TEXAS - UNITS 1 & 2 3/4 3-71 4
' A~TACriMENTA ST HL-AE 3544 -
7 PAGE
/o 0F ' to
- 3 TABLE 3;3-10 (Continued) f
-ACTION STATEHENTS (Continued) i
~
With the number of OPERABLE channels less than 4 thermo-J c.
couples per quadrant, restore these thermocouples to
[
,.i OPERABLE status within 48 nours, or be in at least NOT i'
S. JfyT.DOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
e<_
t m
-a
.):
ACTION 43 -
~ a.
.With the number of OPERABLE channels two less than the'
/-
Total Number of Channels requirements,' restore the,
' inoperable channel to OPERABLE status within 31 days, or.
F L
be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.,
i
- b.
With'the number of OPERABLE-channels three less than the i
Total Number of Channels requirement, restore at least one inoperable channel to OPERABLE status within 7 days, or be
-in at least HOT SHUTDOWN within the next-12 hours.
1 1
c.
With the number of OPERABLE channels less than the Minimum-l.
Channels Operable requirement, restore et least one inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or i
be in at least HOT SHUTDOWN withu the:next'12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. -
4 l
i 6
D 4
i a
1 L- <
l; i
n SOUTH-TEXAS - UNITS 1 & 2 3/4 3-72 AMENDMENT NOS. 14 AND 4 lr
,,