Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML0234501036 December 2002TVA Central Emergency Control Center (CECC) - Emergency Plan Implementing Procedure (EPIP) Revisions
ML02345046610 December 2002Steam Generator Replacement Project - Topical Report No. 24370-TR-C-001, Alternate Rebar Splice - Bar-Lock Mechanical Splices, Response to NRC Request for Additional InformationCommercial Grade Dedication
ML0234505594 December 2002February 5, 2003 Generic Fundamentals Examination Section, Administration of Written Operator Licensing ExamGeneric Fundamentals Examination
ML02346049224 October 2002Meeting Agenda & Slides from Tva/Nrc Sequoyah Steam Generator Replacement Project Topical MeetingSafe Shutdown
Ultimate heat sink
Commercial Grade Dedication
Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Design basis earthquake
Earthquake
Control of Heavy Loads
ML02350033213 December 2002November 2002 Monthly Operating Report for Sequoyah Nuclear Power Plant
ML02352017820 December 2002December 2002 Exam Post-Exam Comments - None
ML02352029616 December 2002Unsatisfactory Laboratory Result on Blind Performance Test SpecimenFitness for Duty
ML02352063718 December 2002Meeting with TVA Steam Generator Compartment Roof Modification Topical Report Associated with the Steam Generator Replacement at Sequoyah, Unit 1
ML02353060816 December 2002Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs.Nondestructive Examination
ML02353062819 December 2002Steam Generator Compartment Roof Modification Topical Report
ML02357036623 December 2002Forthcoming Meeting with TVA Regarding Steam Generator Compartment Roof Modification Topical Report Associated with Steam Generator Replacement at Sequoyah, Unit 1
ML02358023120 December 2002TVA Central Emergency Control Center - Emergency Plan Implementing Procedure (EPIP) RevisionsGrab sample
Hydrostatic
ML02361022221 December 2002Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) Model for Sequoyah 1 and 2Probabilistic Risk Assessment
ML02364031319 December 2002Topical Report (WCAP-15984) for Technical Specification Change No. 00-14, Pressure Temperature Limits Report (PTLR) and Request for Exemption from the Requirements of 10 CFR 50, Appendix G, Enclosures 1 & 2
ML02364031931 December 2002Topical Report WCAP-15984-NP, Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Sequoyah Units 1 & 2.Hydrostatic
Finite Element Analysis
ML02364038420 December 2002Tennessee Valley Authority'S Posthearing Proposed Findings of Fact and Conclusions of Law
ML02364042020 December 2002Part 1 of 2, Attachment to Tennessee Valley Authority'S Posthearing Proposed Findings of Fact and Conclusions of Law
ML02364042220 December 2002Part 2 of 2, Attachments to Tennessee Valley Authority'S Posthearing Proposed Findings of Fact and Conclusions of LawEnforcement Discretion
ML03002003524 December 2002Notice Regarding Certain Implementation Actions Taken in Response to Interim Safeguards & Security Compensatory Measures at Browns Perry Nuclear Plant, Units 1, 2 & 3, & Sequoyah Nuclear Plant, Units 1 & 2
ML03003011931 December 2002Control Room Habitability Analysis for Design Basis Accidents - Tritium Production
ML03010003020 December 2002Meeting Handout - SQN Project Plan 12/20/2002Shutdown Margin
Missed surveillance
ML03013018113 November 2002Discharge Monitoring Report for Sequoyah
ML03014007911 December 2002Tennessee Valley Authority - Discharge Monitoring Report for Sequoyah Nuclear Plant
ML03014027023 December 2002Tennessee Storm Water Multi-Sector General Permit for Industrial Activities Permit No. TNR050000 Sector O Exceedance of the Monitoring Cut-off Concentration
ML03043059820 December 2002December 2002-301 Exam Administrative DocumentsBoric Acid
Job Performance Measure
ML03051052220 December 2002Tennessee Valley Authority (TVA) - NRC Staff'S Findings of Fact and Conclusions of Law Concerning the Tennessee Valley Authority'S Violation of 10 C.F.R. 50.7
ML03161089924 December 2002Rev 3 to 24370-TR-C-002-A, Sequoyah Unit 1 Steam Generator Replacement Rigging and Heavy Load Handling Topical Report, Table of Contents Through Figure 1Safe Shutdown
Unanalyzed Condition
Boric Acid
High winds
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Tornado Missile Protection
Design basis earthquake
Large early release frequency
Earthquake
Control of Heavy Loads
ML03161090824 December 2002Rev 3 to 24370-TR-C-002-A, Sequoyah Unit 1 Steam Generator Replacement Rigging and Heavy Load Handling Topical Report, Attachment 1 Through Figure 3Safe Shutdown
Unanalyzed Condition
Boric Acid
High winds
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Finite Element Analysis
Design basis earthquake
Earthquake
Control of Heavy Loads
ML04005008530 December 2002Final Exercise Report for Sequoyah Nuclear Power PlantHigh Radiation Area
ML09189017831 October 2002Map Figures 8-1 Through 8-40
ML09189017931 October 2002Map Figures 8-41 Through 8-94
ML09189018031 October 2002Volume I - Main Text, Tables, and Figures Hydrogeological and Geochemical Site Characterization ReportCoatings
Environmental Justice
Press Release-02-116, NRC Grants TVA License Amendments to Produce Tritium at Sequoyah Nuclear Power Plant in Tennessee1 October 2002Press Release-02-116: NRC Grants TVA License Amendments to Produce Tritium at Sequoyah Nuclear Power Plant in TennesseeOpen House
TAC:MA657315 November 2002
TAC:MB266021 November 2002
TAC:MB52712 October 2002
TAC:MB592416 December 2002