 Issue dateTitleTopic
L-2002-185, Response to NRC Bulletin 2002-02 - Reactor Pressure Vessel Head Penetration Nozzle Inspection Programs11 September 2002Response to NRC Bulletin 2002-02 - Reactor Pressure Vessel Head Penetration Nozzle Inspection ProgramsSafe Shutdown
Boric Acid
Nondestructive Examination
Finite Element Analysis
Stress corrosion cracking
Pressure Boundary Leakage
Through-Wall Leakage
L-2002-189, Refueling Outage SL2-13, Steam Generator Tube Inservice Inspection Special Report3 October 2002Refueling Outage SL2-13, Steam Generator Tube Inservice Inspection Special Report
L-2002-190, Request for Information Reinitiation of ESA Section 7 Consultation20 September 2002Request for Information Reinitiation of ESA Section 7 ConsultationHigh winds
Incorporated by reference
L-2002-192, Official Service List Changes for St Lucie, Units 1 & 2 and Turkey Point, Units 3 & 417 September 2002Official Service List Changes for St Lucie, Units 1 & 2 and Turkey Point, Units 3 & 4
L-2002-194, In-Service-Inspection Plan Second Ten-Year Interval Contingency Relief Requests 22 & 32 for St. Lucie Units 1 & 227 September 2002In-Service-Inspection Plan Second Ten-Year Interval Contingency Relief Requests 22 & 32 for St. Lucie Units 1 & 2Boric Acid
Hydrostatic
Stress corrosion cracking
L-2002-196, Proposed License Amendment Reduce the Minimum Reactor Coolant System Flow15 October 2002Proposed License Amendment Reduce the Minimum Reactor Coolant System FlowBoric Acid
Shutdown Margin
Anticipated operational occurrence
Fuel cladding
Loss of condenser vacuum
L-2002-209, Cycle 18 Core Operating Limits Report - Revision 018 October 2002Cycle 18 Core Operating Limits Report - Revision 0Shutdown Margin
L-2002-212, Florida Power & Light Response to Request for Additional Information for 10 CFR 50 Appendix R K1 Exemption Clarification/Request22 October 2002Florida Power & Light Response to Request for Additional Information for 10 CFR 50 Appendix R K1 Exemption Clarification/RequestSafe Shutdown
Exemption Request
L-2002-215, Emergency Plan Implementing Procedure29 October 2002Emergency Plan Implementing ProcedureLicense Renewal
L-2002-220, Official Service List Changes29 October 2002Official Service List Changes
L-2002-238, FPL RAI Response for Relocation of Crane TS14 November 2002FPL RAI Response for Relocation of Crane TS
L-2002-239, Proposed License Amendments Request for Additional Information Response on Risk Informed One Time Increase in Integrated Leak Rate Test Surveillance Interval13 December 2002Proposed License Amendments Request for Additional Information Response on Risk Informed One Time Increase in Integrated Leak Rate Test Surveillance IntervalProbabilistic Risk Assessment
Coatings
Integrated leak rate test
Moisture barrier
L-2002-242, FPL RAI Response for Core Operating Limits Report Methodologies5 December 2002FPL RAI Response for Core Operating Limits Report Methodologies
L-2002-243, Price Anderson Guarantees/Annual Financial Report19 December 2002Price Anderson Guarantees/Annual Financial ReportIncorporated by reference
L-2002-245, In-Service-Inspection Plan Second Ten-Year Interval Interim Relief Request 3410 December 2002In-Service-Inspection Plan Second Ten-Year Interval Interim Relief Request 34Coatings
L-2002-247, In-Service Inspection Plans, Third Ten-Year Interval, Repair of Alloy 600 Small Bore Nozzles Without Flaw Removal, Unit 1 Relief Request 23, Revision 1 and Unit 2 Relief Request 5, Revision 021 November 2003In-Service Inspection Plans, Third Ten-Year Interval, Repair of Alloy 600 Small Bore Nozzles Without Flaw Removal, Unit 1 Relief Request 23, Revision 1 and Unit 2 Relief Request 5, Revision 0Boric Acid
Stress corrosion cracking
L-2002-249, Physical Security Plan - Revision 5917 December 2002Physical Security Plan - Revision 59
L-2003-007, NRC Bulletin 2002-01, Request for Additional Information Response31 January 2003NRC Bulletin 2002-01, Request for Additional Information ResponseBoric Acid
High Radiation Area
VT-2
Stress corrosion cracking
Operability Determination
Pressure Boundary Leakage
Pressure boundary leak
Through Wall Leak
Through-Wall Leakage
Unidentified leakage
Operational leakage
L-2003-009, Inservice-Inspection Plan Second Ten-Year Interval Relief Request 29 Request for Additional Information Response16 January 2003Inservice-Inspection Plan Second Ten-Year Interval Relief Request 29 Request for Additional Information ResponseNon-Destructive Examination
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Large early release frequency
Stress corrosion cracking
Maintenance Rule Program
Thermal fatigue
L-2003-012, Response to Order for Compensatory Measures Related to Access Authorization24 January 2003Response to Order for Compensatory Measures Related to Access Authorization
L-2003-014, Inservice Inspection Program Second Ten-Year Interval Relief Request 35 Early Use of ASME Code Case N-533-123 January 2003Inservice Inspection Program Second Ten-Year Interval Relief Request 35 Early Use of ASME Code Case N-533-1Boric Acid
VT-2
Scaffolding
L-2003-015, Physical Security Plan - Revision 6017 January 2003Physical Security Plan - Revision 60
L-2003-023, Contingency Unit 1 Relief Request 22 & Unit 2 Relief Request 32 - Withdrawal of Requests31 January 2003Contingency Unit 1 Relief Request 22 & Unit 2 Relief Request 32 - Withdrawal of Requests
L-2003-026, Emergency Plan Implementing Procedure7 February 2003Emergency Plan Implementing Procedure
L-2003-028, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20027 February 2003Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2002
L-2003-032, 2002 Annual Operating Report24 February 20032002 Annual Operating Report
L-2003-041, In-Service-Inspection Plan Second Ten-Year Interval Interim Relief Request 34 Supplemental3 March 2003In-Service-Inspection Plan Second Ten-Year Interval Interim Relief Request 34 Supplemental
L-2003-042, Proposed License Amendment Reduce the Minimum Reactor Coolant System Flow28 February 2003Proposed License Amendment Reduce the Minimum Reactor Coolant System FlowShutdown Margin
Anticipated operational occurrence
L-2003-043, Notice of Claim Pursuant to 10 CFR 140.6(a)24 February 2003Notice of Claim Pursuant to 10 CFR 140.6(a)
L-2003-046, Emergency Plan Implementing Procedure24 February 2003Emergency Plan Implementing ProcedureSafe Shutdown
Safeguards Contingency Plan
License Renewal
Downpower
L-2003-049, Semi-Annual Fitness-for-Duty Program Performance Data28 February 2003Semi-Annual Fitness-for-Duty Program Performance DataFitness for Duty
L-2003-051, St. Lucie, Units 1 & 2 and Turkey Point, Units 3 & 4 - Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors Answer to Order28 February 2003St. Lucie, Units 1 & 2 and Turkey Point, Units 3 & 4 - Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors Answer to Order
L-2003-053, Inservice Inspection Plans Unit 1 Third Ten-Year Interval, Unit 2 Second Ten-Year Interval Unit 1 Relief Request 24 and Unit 2 Relief Request 36 Proposed Alternative Requirements for Implementation of ASME Section XI Appendix Viii, Supple25 March 2003Inservice Inspection Plans Unit 1 Third Ten-Year Interval, Unit 2 Second Ten-Year Interval Unit 1 Relief Request 24 and Unit 2 Relief Request 36 Proposed Alternative Requirements for Implementation of ASME Section XI Appendix Viii, SupplemeDissimilar Metal Weld
L-2003-059, Emergency Plan Implementing Procedure7 March 2003Emergency Plan Implementing ProcedureBoric Acid
L-2003-064, Decommissioning Fund Status Report14 March 2003Decommissioning Fund Status Report
L-2003-069, Generic Letter 96-06 Supplemental Response Resolution of Waterhammer Issues13 March 2003Generic Letter 96-06 Supplemental Response Resolution of Waterhammer Issues
L-2003-073, Property Insurance - 10 CFR 50.54(w)(3)20 March 2003Property Insurance - 10 CFR 50.54(w)(3)
L-2003-078, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report26 March 2003Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual ReportFuel cladding
L-2003-080, Inservice Inspection Plan, Second Ten-Year Interval, Relief Request 29 Supplemental Response to Request for Additional Information26 March 2003Inservice Inspection Plan, Second Ten-Year Interval, Relief Request 29 Supplemental Response to Request for Additional InformationNon-Destructive Examination
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Intergranular Stress Corrosion Cracking
Large early release frequency
Stress corrosion cracking
Maintenance Rule Program
Thermal fatigue
L-2003-082, Annual Radiological Environmental Operating Report for Calendar Year 200217 April 2003Annual Radiological Environmental Operating Report for Calendar Year 2002Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
L-2003-083, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.i.414 April 2003Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.i.4Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Hydrostatic
Missed surveillance
Stress corrosion cracking
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Unidentified leakage
L-2003-085, Steam Generator Tubesheet Inspection Practices31 March 2003Steam Generator Tubesheet Inspection Practices
L-2003-086, Order (EA-03-009) Relaxation Requests 1 and 2 Examination Coverage of Reactor Pressure Vessel Head Penetration Nozzles - Supplemental Data28 March 2003Order (EA-03-009) Relaxation Requests 1 and 2 Examination Coverage of Reactor Pressure Vessel Head Penetration Nozzles - Supplemental DataBoric Acid
Pressure Boundary Leakage
L-2003-090, March 2003 Monthly Operating Report for St. Lucie Units 1 & 214 April 2003March 2003 Monthly Operating Report for St. Lucie Units 1 & 2
L-2003-098, Report of 10 CFR 50.59 Plant Changes21 April 2003Report of 10 CFR 50.59 Plant Changes
L-2003-107, Emergency Plan Implementing Procedure23 April 2003Emergency Plan Implementing ProcedureSafe Shutdown
Ultimate heat sink
Offsite Dose Calculation Manual
License Renewal
Earthquake
L-2003-108, Inservice Inspection Plan, Unit 1 Third and Unit 2 Second Ten-Year Intervals Request for Additional Information Response Unit 1 Relief Request 23 and Unit 2 Relief Request 3323 April 2003Inservice Inspection Plan, Unit 1 Third and Unit 2 Second Ten-Year Intervals Request for Additional Information Response Unit 1 Relief Request 23 and Unit 2 Relief Request 33Hydrostatic
Finite Element Analysis
Earthquake
Affidavit
Thermal fatigue
L-2003-110, Cycle 14 Core Operating Limits Report1 May 2003Cycle 14 Core Operating Limits ReportShutdown Margin
L-2003-113, Relaxation Requests 1 & 2 - Supplement 229 April 2003Relaxation Requests 1 & 2 - Supplement 2
L-2003-116, In-Service-Inspection Plan Second Ten-Year Interval Relief Request 371 May 2003In-Service-Inspection Plan Second Ten-Year Interval Relief Request 37Liquid penetrant