L-2003-059, Emergency Plan Implementing Procedure
| ML030770461 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/07/2003 |
| From: | Jernigan D Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2003-059 HP-204, Rev 8A | |
| Download: ML030770461 (23) | |
Text
Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 FPL L-2003-059 10 CFR 50 Appendix E U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Emergency Plan Implementing Procedure In accordance with 10 CFR 50 Appendix E, enclosed is a copy of the revised procedure that implements the St. Lucie Plant Radiological Emergency Plan.
Number Title Revision Implementation Date In-Plant Radiation and Contamination Surveys During Emergencies 8A February 26, 2003 Vice Presid~nt St. Lucie Plant ion 8A incorporated a plant change request (PCR) to revise the form title and ea monitored for detectors. Please contact us if there are any questions procedure.
rs,
)Igan DEJ/tlt Enclosure A-o)4P5 an FPL Group company March 7, 2003 HP-204
Title:
IN-PLANT RADIATION AND CONTAMINATION SURVEYS DURING EMERGENCIES Responsible Department: HEALTH PHYSICS REVISION
SUMMARY
Revision 8A - Incorporated PCR #03-0298 to revise form title and correct area monitored for detectors. (J. R. Walker, 02/04/03)
Revision 8 - THE PROCEDURE HAS BEEN COMPLETELY REWRITTEN. Deleted TMI Shielding Study and related text information (relocated). Made editorial/administrative changes. (J.R. Walker, 06/11/01)
PSL 0
I.
z 0
pROCEDURE POJCTION Revision FRG Review Date Approved By Approval Date S
OPS 0
02/01/82 J. H. Barrow (for) 02/04/82 DATE Plant General Manager DOCT PROCEDURE Revision FRG Review Date Approved By Approval Date DOCN HP-204 8A 06/07/01 R.G. West 06/11/01 SYS Plant General Manager COM COMPLETED N/A ITM 8A Designated Approver S. Wisla 02/04/03 Designated Approver (Minor Correction)
Procedure No.
ST. LUCIE PLANT HP-204 HEALTH PHYSICS Current Revision No.
PROCEDURE 8A FPL Effective Date SAFETY RELATED 02126103
REVISION NO:
PROCEDURE TITLE:
PAGE 8A IN-PLANT RADIATION AND CONTAMINATION 2 of 22 PROCEDURE NO:
SURVEYS DURING EMERGENCIES HP-204 ST. LUCIE PLANT TABLE OF CONTENTS SECTION PAGE 1.0 P U R P O S E......................................................................................................
3 2.0 PRECAUTIONS AND LIMITATIONS........................................................
3 3.0 RELATED SYSTEM STATUS...................................................................
3
4.0 REFERENCES
4 5.0 RECORDS REQUIRED.............................................................................
4 6.0 INSTRUCTIO NS........................................................................................
5 ATTACHMENTS ATTACHMENT A UNIT 1 AREA RAD MONITORS.........................................
7 ATTACHMENT B UNIT 2 AREA RAD MONITORS.........................................
9 ATTACHM ENT C 12
REVISION NO PROCEDURE TITLE.
PAGE' 8A IN-PLANT RADIATION AND CONTAMINATION 3 of 22 PROCEDURE NO.:
SURVEYS DURING EMERGENCIES HP-204 ST. LUCIE PLANT 1.0 PURPOSE 1.1 This procedure provides guidelines for performing radiological surveys under accident conditions.
1.2 DISCUSSION
- 1.
During an emergency, one of the primary responsibilities of the Health Physics Department shall be to evaluate the radiological conditions within the plant. In addition, Operations will require surveys to assess radiological conditions in accordance with the Emergency Operating Procedures (EOPs). Given the higher than normal radiation levels which could be encountered while performing surveys, preplanning of surveys shall be essential to maintaining exposures ALARA.
2.0 PRECAUTIONS AND LIMITATIONS 2.1 All surveys will be performed under the authorization of the Technical Support Center Health Physics Supervisor (TSCHPS) and/or the Emergency Coordinator (EC).
2.2 The buddy system will be used for entries into areas with unknown, extreme or variable radiological conditions.
2.3 Appropriate protective clothing, respiratory protection equipment and dosimetry shall be worn at all times.
2.4 No individual shall exceed the personnel exposure limits listed in Health Physics Procedure HP-201, "Emergency Personnel Exposure Control" unless authorized in accordance with that procedure.
3.0 RELATED SYSTEM STATUS 0
None
REVISION NO.:
PROCEDURE TITLE PAGE 8A IN-PLANT RADIATION AND CONTAMINATION 4 of 22 PROCEDURE NO:
SURVEYS DURING EMERGENCIES HP-204 ST. LUCIE PLANT
4.0 REFERENCES
NOTE One or more of the following symbols may be used in this procedure:
§ Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, Licen Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
¶ Indicates a management directive, vendor recommendation, plant praci or other non-regulatory commitment that should NOT be revised withou consultation with the plant staff.
'T Indicates a step that requires a sign off on an attachment.
4.1 St. Lucie Plant Radiological Emergency Plan (E-Plan).
4.2 E-Plan Implementing Procedures (EPIP 00-13) 4.3 HP-2, "FPL Health Physics Manual."
4.4 HPP-4, "Scheduling of Health Physics Activities."
4.5 HPP-20, "Area Radiation and Contamination Surveys."
4.6 HP-201, "Personnel Emergency Exposure Control."
4.7 HP-203, "Personnel Access Control During Emergencies."
5.0 RECORDS REQUIRED 5.1 Plant survey maps when complete shall be maintained in the plant files in accordance with QI-17-PSL-1, Quality Assurance Records.
se Lice It
REVISION NO.:
PROCEDURE TITLE PAGE.
8A IN-PLANT RADIATION AND CONTAMINATION 5 of 22 PROCEDURE NO SURVEYS DURING EMERGENCIES HP-204 ST. LUCIE PLANT 6.0 INSTRUCTIONS 6.1 In the event of a Steam Generator Tube Rupture (SGTR), the Emergency Coordinator, in conjunction with the TSCHPS, should initially post areas which could be contaminated. These areas could include the entire turbine building.
Specific areas that may experience increasing dose rates include:
- 1.
Steam Trestle
- 2.
Condenser Air Ejector
- 3.
Condensate Polisher
- 4.
Ion Exchangers and Filters located in the Steam Generator Blowdown Treatment Facility
- 5.
Condensers Attachment C contains survey maps of these areas.
6.2 Prior to entering an area to perform initial surveys, the TSCHPS and/or HPOSC (HP Supervisor in the Operational Support Center) shall review available data to determine the expected exposure rates. This review will include but not be limited to the following:
- 1.
All recent surveys of access ways and cubicle entrances.
- 2.
The plant Area Radiation Monitoring System (ARMS).
6.3 The HPOSC and TSCHPS shall assign stay times and verify Evacuated Area Re-Entry Briefing Guidance (HP-203.1) is completed prior to entry.
6.4 The survey route and sample points and methods shall be determined prior to entry by the HPOSC. See HP-205, "Emergency Inplant Air Sampling" for emergency air sampling. This information shall be designated on the Plant Survey Maps (see HPP-4, "Scheduling of Health Physics Activities").
6.5 The survey team shall be briefed by the HPOSC prior to entering the evacuated area. Special techniques or conditions shall be emphasized and noted in the Plant Survey Maps (see HPP-4).
6.6 Surveys shall be conducted in accordance with Health Physics Procedure HPP-20, "Area Radiation and Contamination Surveys," along with any additional techniques or conditions specified by the HPOSC.
6.7 Exercise extreme caution around spill areas due to the potentially high contamination levels and near holes in shield walls such as doorways. Avoid potential Hot Spots as much as practicable.
REVISION NO' PROCEDURE TITLE:
PAGE:
8A IN-PLANT RADIATION AND CONTAMINATION 6 of 22 PROCEDURE NO' SURVEYS DURING EMERGENCIES HP-204 ST. LUCIE PLANT 6.8 Exercise caution in removing protective clothing to preclude spread of contamination.
6.9 Surveys shall be documented in accordance with HPP-20 and maintained at the OSC.
6.10 The TSCHPS and HPOSC shall use the information from the initial surveys to determine future actions with regard to the Emergency affected area.
6.11 Attachment A (Unit 1) and Attachment B (Unit 2) contain a description of the plants ARMS channels. Included are the channel number, area monitored by each detector and the physical location of the detector. These attachments should be referred to when preparing for re-entry into evacuated areas.
REVISION NO:
PROCEDURE TITLE.
PAGE:
8A IN-PLANT RADIATION AND CONTAMINATION 7 of 22 PROCEDURE NO SURVEYS DURING EMERGENCIES HP-204 ST. LUCIE PLANT ATTACHMENT A UNIT I AREA RAD MONITORS (Page 1 of 2)
DETECTOR AREA MONITORED DETECTOR ID LOCATION RE-26-1 Unit 1 Control Room Area CR, Rear RPS Cab D RE-26-2 Spent Fuel Pool Area Refuel Stairs, Door 169 N RE-26-3 Containment Radiation CIS A 0 degrees, Approx. 90' EL RE-26-4 Containment Radiation CIS B 270 degrees, Approx. 90' EL RE-26-5 Containment Radiation CIS C 180 degrees, Approx. 90' EL RE-26-6 Containment Radiation CIS D 90 degrees, Approx. 90' EL RE-26-7 Fuel Pool Area Fuel Pool, N Wall, Center RE-26-8 Fuel Pool Canal Area Fuel Pool, SW Corner RE-26-9 Fuel Pool Pump Area In Door 169, 24' North RE-26-1 0 Boric Acid Pre-Concentrator Area Mid of EWHW, S Wall RE-26-11 Waste Filter Area SW Sect of EWHW, Locked RE-26-12 Laundry Filter Area SW Sect of EWHW, Locked RE-26-13 Waste Gas Compressor Area N Off W End of EWHW, Locked RE-26-14 Charging Pumps Area 1B's Entr, on Pillar RE-26-15 B/A Hold Up Pump Area RAB, -.5' Across from 1A HU Drain Pump RE-26-16 Ion Exchanger (Sample Heat MG Room, Left to Smpl Rm Exchanger)
RE-26-17 Ion Heat Exchanger Area Eastern NS HW,Do2 Cal Cage RE-26-18 Ion Exchanger Valves VIv Gal, Mid W Wall RE-26-19 Drumming Station Area Last S Exit on EW HW, Turn Left
REVISION NO:
PROCEDURE TITLE PAGE 8A IN-PLANT RADIATION AND CONTAMINATION 8 of 22 PROCEDURE NO.:
SURVEYS DURING EMERGENCIES HP-204 ST. LUCIE PLANT ATTACHMENT A UNIT 1 AREA RAD MONITORS (Page 2 of 2)
DETECTOR AREA MONITORED DETECTOR ID LOCATION RE-26-20 Purification Filter Area N Wall of VCT HW RE-26-21 Spent Resin Tank Area E End of EW HW RE-26-22 HPSI & Cont Spray Pump Area RAB 19.5' West Wall at Turn in Catwalk RE-26-23 Decon Room Area On South Wall of Decon Room RE-26-24 HVAC Room Area - Fan Room On RA2 Pillar, Ctr of Rm RE-26-25 Chemical Drain Pump Area NW Corn or EW HW, UP Ladder RE-26-26 Flash Tank Pump Area W Wall (Mid) of VCT HW RE-26-27 Boronometer Enclosure Area Left off VCT HW to Let-Down RE-26-36 Refueling Pool Area RCB 62' on Elevator Wall RE-26-37 New Fuel Storage Area NFB 48' EL West Wall RE-26-38 Aerated Waste Storage Area Far NW Cor of EW HW, Up Ladder RE-26-39 Boric Acid Concentrator Area RAB 19.5' Near Entrance to IA BA Conc.
RE-26-46 Outside Air Intake A 62' HVAC Room RE-26-47 Outside Air Intake B 62' HVAC Room RE-26-52 Containment Post LOCA - Fan 15' W of NE Cor, 15' Up RCB Room Wall, Fan Room RE-26-53 Containment Post LOCA 20' E of NW Cor, Fan Room RCB Wall RE-26-58 Containment High Range A 0 Degrees Approx 90' El RCB RE-26-59 Containment High Range B 180 Degrees Approx 90' El
REVISION NO:
PROCEDURE TITLE:
PAGE 8A IN-PLANT RADIATION AND CONTAMINATION 9 of 22 PROCEDURE NO' SURVEYS DURING EMERGENCIES HP-204 ST. LUCIE PLANT ATTACHMENT B UNIT 2 AREA RAD MONITORS (Page 1 of 3)
DETECTOR AREA MONITORED DETECTOR ID LOCATION RIM-26-1 Control Room NE corner of control room RIM-26-2 Outside Personnel Hatch RCB 62' by elevator RIM-26-3 Containment Radiation CIS A CH, 00, north wall RIM-26-4 Containment Radiation CIS B CH, 2700, west wall RIM-26-5 Containment Radiation CIS C CH, 1800, south wall RIM-26-6 Containment Radiation CIS D CH, 900, east wall RIM-26-7 Spent Fuel Bldg.
62', east wall south of cask crane area RIM-26-8 Spent Fuel Bldg.
62', east wall north of transfer canal RIM-26-9 Spent Fuel Bldg.
62', SE wall of fuel pool RIM-26-10 Spent Fuel Bldg.
62', SW wall of fuel pool RIM-26-11 Spent Fuel Bldg.
62', West (center) fuel of pool RIM-26-12 Spent Fuel Bldg.
62', north end of fuel pool, west of cask area RIM-26-13 Waste Gas Comp.
-.5', on top of wall between A & B compressors RIM-26-14 Charging Pump Room
-.5', on wall between B & C pump RIM-26-15 Hold Up Drain Pump
-.5', under stairway near B.A.
hold up tank RIM-26-16 Sample Room 19.5', beside M.G. set area RIM-26-17 Ion Exchange Hall 19.5', east end RAB, north-south hallway
REVISION NO:
PROCEDURE TITLE:
PAGE 8A IN-PLANT RADIATION AND CONTAMINATION 10 of 22 PROCEDURE NO.
SURVEYS DURING EMERGENCIES HP-204 ST. LUCIE PLANT ATTACHMENT B UNIT 2 AREA RAD MONITORS (Page 2 of 3)
DETECTOR AREA MONITORED DETECTOR ID LOCATION RIM-26-18 Flash Tank Pump 19.5', room west of ion exchange hallway RIM-26-19 Drumming Station 19.5', inside door to the right RIM-26-20 Purif. Filter 19.5', west end of VCT hallway RIM-26-21 Spent Resin Hall
-.5', east end of hallway RIM-26-22 ECCS Equipment
-.5', HPSI room, left of entrance RIM-26-23 Decon. Area 19.5', laundry room west corner RIM-26-24 HVAC 43', between HVE-6B and HVE 6A RIM-26-25 Chemical Drain
-.5', west end of room RIM-26-26 VCT Hall 19.5', left wall of VCT hall RIM-26-27 Boronometer 19.5', inside door to left, up high RIM-26-28 New Fuel Storage FHB 48', SW wall RIM-26-29 Aerated Waste
-.5', west end, right wall RIM-26-30 B.A. Concentrator 19.5', between A & B Concentrator RIM-26-31 Fuel Pool Filter FHB 19.5', west wall RIM-26-32 Outside Personnel Hatch Just inside personnel hatch (right)
RIM-26-33 Refueling Canal FHB 62', SW wall of transfer canal RIM-26-34 Fuel Pool Pump FHB 19.5', pool pump room, east wall RIM-26-35 B.A. Precon. Filter
-.5', on west wall by precon. filter N-,
REVISION NO:
PROCEDURE TITLE:
PAGE 8A IN-PLANT RADIATION AND CONTAMINATION 11 of 22 PROCEDURE NO:
SURVEYS DURING EMERGENCIES HP-204 ST. LUCIE PLANT ATTACHMENT B UNIT 2 AREA RAD MONITORS (Page 3 of 3)
DETECTOR AREA MONITORED DETECTOR ID LOCATION RIM-26-36 Waste Filter
-.5', on wall above waste filters, west end RIM-26-37 ECCS Equipment
-.5', above wall between A & B LPSI RIM-26-38 Control Room Post LOCA 900 top of FHB (east)
RIM-26-39 Control Room Post LOCA 2100 (south) mounted on stack RIM-26-40 Control Room RCB 62', 0°, north wall RIM-26-41 Control Room RCB 62', 1800, south wall RIM-26-61 Control Room Outside Air Intake Behind kitchen of Control Room, in duct RIM-26-62 Control Room Outside Air Intake C.C.W. surge tank room RIM-26-65 Control Room Outside Air Intake Behind kitchen of Control Room, in duct RIM-26-66 Control Room Outside Air Intake C.C.W. surge tank room RIM-26-69 ECCS Effluent Post LOCA 43' RAB near access to roof RIM-26-70 ECCS Effluent Post LOCA 43' RAB near access to roof RIM-26-71 Unit 2 Battery Room Steam trestle A main steam RIM-26-72 Unit 2 Battery Room Steam trestle B main steam RIM-26-73 Unit 2 Battery Room Between A & B main steam RIM-26-90 Post LOCA Plant Stack 62', behind Control Room on roof
(/
REVISION NU..
8A PROCEDURE NO HP-204 r
PROCEDURE TITLE:
IN-PLANT RADIATION AND CONTAMINATION SURVEYS DURING EMERGENCIES ST. LUCIE PLANT PAGE.
12 of 22 I
ATTACHMENT C (Page 1 of 11)
Af A
In 7 T
7, 1
S~AM**S MAN.O.....
A CONTROLLED DOCUMEN Dol ST. LUCIE-UNIT #2 ST. LUCIE - UNIT #2 FLOOR PLAN TURBINE BUILDING ELEVATION 19 50'
- 1 Iii_
DRAWING I
FOR INFORMATION ONLY "THIS DOCUMENT 13 NOT CONTROLLED, NOTTO SCALE BEFORE USEVERIFY INFORMATIONWITH T
L rl -
T..
REVISION NO.
8A PROCEDURE NO:
HP-204 Y
(
PROCEDURE TITLE:
IN-PLANT RADIATION AND CONTAMINATION SURVEYS DURING EMERGENCIES ST. LUCIE PLANT (f
13 of 22 Ia ATTACHMENT C (Page 2 of 11)
S(_)
REACTOR AUXILIARY BUILDING
-+/-TE TRESTLE I
II~
aEVAIOR su i
E L I
T:
L IW..
I I
i
.,;i.,h I
I CL
- -:A.
EyeE A-,R4 iOL~.,4S L
0 0
0 1 N -
.i.
(p-LA O N D E N E R ACO N D N E R PAGE NER LAADS (ENERIEAD)
NCNERW T _
DRE comeSE 2
I"
~C D N
DLSER E
PEELI-MANLED DRAWING FOR INFORMATION ONLY THIS DOCUMENT IS NOT CONTROLLED, NOT TO SCALE BEFORE USE. VERIFY INFORMATION WITH A CONTROLLED DOCUMENT IPL ST. LUCIE - UNIT #2 FLOOR PLAN TURBINE BUILDING ELEVAT1ON 39 50' OPE N OLOOW me"T EXCHNEN ATBA'Ytlt CHARGER 2
BAT ROMED ATEY AKS 0
-0
-0 I
.1 1,
I-'/u=,
\\
REVISION Nu,..
8A PROCEDURE NO:
HP-204 r
PROCEDURE TITLE IN-PLANT RADIATION AND CONTAMINATION SURVEYS DURING EMERGENCIES ST. LUCIE PLANT T
(
PAGE.>,
14 of 22 ATTACHMENT C (Page 3 of 11)
FLOOR PLAN ELEVATION 19.50' 2A AUXILIARY FEEDWATER PUMP 2B AUXILIARY FEEDWATER PUMP UNDERGROUND PIPE TRENCH FLOOR PLAN ELEVATION 41.08' HCV-09 1 HACV'09 I AIR ACCUM:
HCV-081A HCV-C8is TEST PANEL TEST PANEL TURBINE GENERATOR BUILDING DRAWING I
FOR INFORMATION ONLY THIS DOCUMENT IS NOT CONTROLLED.
NOT TO SCALE BEFORE.USE.VERIFY INFORMATION WITH ST. LUCIE - UNIT #2 FLOOR PLAN STEAMTRESTLE "A
A COMROLLED DOCUMENT Q'i
REVISION Nu..
8A PROCEDURE NO.:
HP-204 IC PROCEDURE TITLE.
IN-PLANT RADIATION AND CONTAMINATION SURVEYS DURING EMERGENCIES ST. LUCIE PLANT r
PAGE'
- PAGE5, 15 of 22 I
ATTACHMENT C (Page 4 of 11)
'3 I
REVISION NO:
8A PROCEDURE NO.:
HP-204
(
PROCEDURE TITLE.
IN-PLANT RADIATION AND CONTAMINATION SURVEYS DURING EMERGENCIES ST. LUCIE PLANT 1*PAGE:ý 16 of 22 ATTACHMENT C (Page 5 of 11)
To REACTOR AUX RAI ELEVATOR BUILDING
~84)
MUM I
I I
I I
I I
IOCHEM A NA LVzER I,
I II I
I I
I I ONITI]__
E ANALYZE ELEýATORL.PHEATER 4A 0
IIINEA M
- ICAT, I
pll I
~~~~~~~EMERGENCY S
LIDCTRIsiI EMA COCOOLANS T
I
[
I!:
Mli NOR AREA I
0I I
P HEATER SA RSPJT F I I
I THIS DOCUMENT IS NOT CONTROLLED, SNOT TO SCALE BEOEUEEIYIFRAINOHFLOOR PLAN TURBINE BUILDIIN mCONTROLLED DOCUMENT ELEVATION 39 50 SOIOUM AALVMAZF T 2 CHMF.C ANALYZER SSAMPLE PANEL
- 4M CONFERENCE CUBICLES C
CE OFFICE OEICE OFIE CHEMISTRY OFFICES ELEVATION SW' I?"
1 IG RU OOOOO
j 1 1
It I
MARY BUILDING m
IN-PLANT RADIATION AND CONTAMINATION I
17 of 22 SURVEYS DURING EMERGENCIES 1
ST. LUCIE PLANT ATTACHMENT C (Page 6 of 11)
L--
IN-PLANT RADIATION AND CONTAMINATION SURVEYS DURING EMERGENCIES ST. LUCIE PLANT ATTACHMENT C (Page 7 of 11)
~ia Vdf'll if1 Aid *1 mI*Atilild Al
/11O'Q FLOOR PLAN ELEVATION 19 SO0 TURBINE GENERATOR BUILDING DRAWING FOR INFORMATION ONLY THIS DOCUMENT IS NOT CONTROLLED, NOT TO SCALE BEFORE USE,VERIFY INFORMATION WITH A CONTROLLED DOCUMENT ST. LUCIE - UNIT #1 FLOOR PLAN STEAMTRESTLE IA AUXILIARY FEEDWATER PUMP 1S AUXILIARY FEEDWATER PUMP UNDERGROUND PIPE TRENCH
-a--I-fl t~.,/,il' A-,.M*~
F--.F.V1AIlfIll All.UOl FLOOR PLAN ELEVATION 19 50' Is L1
REVISION NW..
8A PROCEDURE NO.
HP-204 I
PROCEDURE TITLE' IN-PLANT RADIATION AND CONTAMINATION SURVEYS DURING EMERGENCIES ST. LUCIE PLANT IPAGE'.",
19 of 22 I
ATTACHMENT C (Page 8 of 11)
I
IN-PLANT RADIATION AND CONTAMINATION SURVEYS DURING EMERGENCIES ST. LUCIE PLANT ATTACHMENT C (Page 9 of 11)
FLOOR PLAN ELEVATION 19 50' DRAWING FOR INFORMATION ONLY THIS DOCUMENT I1 NOT CONTROLLED, NOT TO SCALE BEFORE USEVERIFY INFORMATION WITH A CONTROLLED DOCUMENT FPL ST. LUCIE - UNIT #1 & #2 LOCATION PLAN CONDENSATE POLISHING FACILITY ELEVATIONS 19 50' & 32 50'
IN-PLANT RADIATION AND CONTAMINATION SURVEYS DURING EMERGENCIES ST. LUCIE PLANT ATTACHMENT C (Page 10 of 11)
PARTIAL PLAN AT ELEVATION 30.00' PARTIAL PLAN BELOW ELEVATION 19.50' GROUND FLOOR PLAN ELEVATION 19 50' DRAWING FOR INFORMATION ONLY THIS DOCUMENT IS NOT CONTROLLED, NOT TO SCALE SEFOR^ -
rIUE' VERIFY INFORMATION WITH ST. LUCIE - UNITS #1 & #2 LOCATION PLAN STEAM GENERATOR BLOWDOWN BUILDING ELEVATION 19 50' UNIT I TRANSFORMER
"'TROLLED DOCUMENT PATA PLAN.BE.OW.EL.ATION....5.
Q L I
REVISION 8A PROCEDURE NO:
HP-204 (l"
PROCEDURE TITLE*
IN-PLANT RADIATION AND CONTAMINATION SURVEYS DURING EMERGENCIES ST. LUCIE PLANT I
PAGE.',
22 of 22 ATTACHMENT C (Page 11 of 11)
PLAN AT ELEVATION 35 00' & 77.00' (2)
U3 Q)
DRAWING FOR INFORMATION ONLY THIS DOCUMENT IS NOT CONTROLLED, NOT TO SCALE BEFORE USE, VERIFY INFORMATION WITH A CONTROLLED DOCUMENT I
PL ST. LUCIE - UNITS #1 & #2 LOCATION PLAN STEAM GENERATOR BLOWDOWN BUILDING Q
fr\\
PARTIAL PLAN AT ELEVATION 55.50'