Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000400/1985048 | 14 July 1986 | Notifies of Ofc of Investigations Discontinuance of Inquiry Q2-85-021 & Related Area of Interest as to Matter Contained in Insp Rept 50-400/85-48.Insp Rept & Notice of Violation May Be Released | |
IR 05000410/1983006 | 2 December 1983 | Discusses 830422 Anonymous Allegation Re Deficiencies in Emergency Diesel Generator Sys,Radiation Containment Sys & Qualifications of Contract Personnel (Allegation Rept Q-1-83-012,based on Insp Rept 50-410/83-06) | |
IR 05000445/1978020 | 9 February 1979 | Corrects Notice of Deviation Re Insp Rept 50-445/78-20,per Util 790209 Response | |
IR 05000454/1983038 | 27 January 1984 | Identifies Addl Insp Repts 50-454/83-38 & 50-455/83-28 Re Reinsp Program,Per 840120 Memo | |
IR 05000482/1983013 | 26 July 1983 | Informs That Allegation 4-83-A-17 Re Improper Use of white-out Unsubstantiated.Forwards Insp Rept 50-482/83-13. Engineering Section Insp to Be Conducted.W/O Encl | |
IR 05000482/1983028 | 26 October 1983 | Informs That Allegation 4-83-A-17 Inspected by R Hall on 830919-22 & Findings Reported in Encl 50-482/83-28.W/o Insp Rept.Related Info Encl | Affidavit |
IR 05000482/1984001 | 22 February 1984 | Informs That Remaining Item on Allegation 4-83-A-25 Completed.W/O Insp Rept 50-482/84-01 | |
IR 05000482/1984051 | 11 December 1984 | Forwards Special Const Verification Insp Rept 50-482/84-51 of Voluntary Const self-assessment on 841023-1102,per 840924 Request,For Transmittal to Applicant.Transmittal Ltr, Potential Enforcement Actions & Unresolved Items Also Encl | |
IR 05000525/2006002 | 3 June 1985 | Submits TMI Program Ofc Weekly Status Rept for Wk of 850525-0602 | |
IR 05000528/1985012 | 25 September 1985 | Forwards 850806 & 0730 Ltrs & Insp Rept 50-528/85-12 Per ACRS 811215 Request for Info Re Startup Experience on Unit 1 Prior to Loading on Unit 2.Unit 2 Fuel Load Scheduled for Nov.Initial Criticality Expected by Jan 1986 | |
IR 05000529/1985044 | 27 November 1985 | Comments on Comparison of as-built Plant W/Facility Tech Specs.Details of Review to Be Reflected in Insp Rept 50-529/85-44 & IE Insp Procedure 71301, Tech Spec Review, Dtd 850322.Proposed Tech Specs Clear & Enforceable | |
IR 05000729/2008004 | 5 August 1985 | Submits TMI Program Ofc Weekly Status Rept for Wk of 850729-0804 | |
IR 05000831/2009008 | 9 September 1985 | Forwards TMI Program Ofc Weekly Status Rept for Wk of 850831-0908 | |
IR 05000930/2010006 | 7 October 1985 | Submits TMI Program Ofc Weekly Status Rept for Wk of 850930-1006 | |
IR 07100015/2011016 | 23 November 1987 | Forwards Plant Status Rept for 871015-1116,providing Highlights of Significant Events | New Resident Inspector |
IR 07100026/2011029 | 30 November 1987 | Submits TMI-2 Cleanup Project Directorate Status Rept for 871026-1129 Re Defueling,Environ Monitoring,Decontamination Activities,Waste Mgt,Nrc Evaluations in Progress & Next Public Meeting | |
ML082320170 | 4 October 1985 | Responds to 850828 Concerns That Procedures in Draft Manual Chapter 0514 Not Followed in Addressing Util 850604 Backfit Claim.Nrr Completed Actions within Stipulated 3-wk Time Frame.Ie Concurrence Delayed NRC Response | Backfit |
ML082380843 | 7 November 1985 | Discusses Util 850531 Response to NRC Request for Addl Info Re Item 2.2.2 of Generic Ltr 83-28 Contending That Request Violated plant-specific Backfit Manual.Appeal Not Planned. Item Closed | Backfit |
ML082890913 | 18 March 1985 | Forwards Monthly Status Rept on plant-specific Backfitting Activities Current Through 850308.Nine of 15 SER Open Items Resolved Prior to Appeal Meetings.Ser Scheduled for Completion on 850329 | |
ML18046B289 | 4 February 1982 | Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) | |
ML18046B290 | 10 February 1982 | Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) | |
ML20023B937 | 4 April 1983 | Forwards Eh Gischel Affidavit & Memo Re Allegations on safety-related Mods & Tests.Investigation Underway | |
ML20024B000 | 26 April 1968 | Comments on Jcp&L Draft Oyster Creek Unit 2 Contract Transmitted by G Gray 680327 Ltr.Comments Based on Belief That Contract Should Pose No More or No Less Burden on Vendor than Met Ed Contract | |
ML20024B292 | 31 July 1979 | Responds to Embrey Request for 790801 Draft &/Or Status of Presentation for B&W Sys Responsiveness & Suppls 790726 Ltr | Power change |
ML20024B313 | 9 May 1978 | Summary of 780424 Meetings W/Cpc Re Mechanism by Which B&W Assures That All Site Problems at Other Sites Are Reviewed for Applicability to Contract & That Corrective Actions Are Taken Where Appropriate | |
ML20024B433 | 15 July 1975 | Forwards Site Problem Rept Re Electromatic Relief Valve Malfunction Resulting from Corrosion of Lever Pin & Lever Hinge.Customers Should Be Advised to Inspect Periodically for Corrosion & Valve Motion During Shutdown | |
ML20024B454 | 16 November 1978 | Requests Withdrawal of 780404 Potential Safety Concern Re Secondary Side Auxiliary Feedwater Control Level.Problem W/ 6-ft Control Not Inadvertent,But Part of Planned Effort | |
ML20024B455 | 3 November 1978 | Dismisses Validity of Potential Safety Concern (PSC) Filed Against 205 Plants Re Secondary Side Auxiliary Feedwater Control Level.Potential Obstructions Nonexistent | |
ML20024B477 | 3 November 1978 | Discusses Potential Safety Concern (PSC) Re Secondary Side Auxiliary Feedwater Control Level.Positive 6-ft Control Approved in Summer 1977.Return to 40-ft Control Studied. Potential Obstructions Nonexistent.Psc Should Be Withdrawn | |
ML20024B481 | 14 April 1979 | Discusses C Michelson,Of Tva,Critique of Small Breaks for B&W RCS in May 1978 | |
ML20024B756 | 1 May 1979 | Forwards Results Summary of 1978-79 Requal Written Exam,For info.Post-oral Packages Forwarded to Individuals Having Two or More Categories Less than 80% | |
ML20024C471 | 10 February 1978 | Discusses Lack of Prompt Notification to TMI Re Substantial Safety Hazard.Proper Customer Notification Will Be Provided by Licensing | |
ML20024C484 | 14 April 1978 | Suggests Policy Calling for Detailed Incident Rept for Every Significant Incident Affecting B&W Plants | |
ML20024C511 | 31 May 1979 | Advises That Preliminary Rept of Safety Concern PSC 16-79 Will Be Provided Upon Completion | |
ML20024C556 | 14 December 1979 | Emphasizes Need for PRA Capability.Related Info Encl | Probabilistic Risk Assessment |
ML20024C571 | 1 July 1981 | Provides Sequence of Events | Boric Acid |
ML20024C577 | 11 December 1978 | Recommends Small Break Analyses W/Reactor Coolant Pumps Powered | |
ML20024C583 | 2 January 1979 | Forwards ECCS Analysis Unit Activities Rept,Dec 1978. | |
ML20024C606 | 4 September 1979 | Summarizes Analysis Code Requirements & Verification Project,Action Item 5 on CRAFT2 Simulations of Small Break Transients | |
ML20024C770 | 7 February 1974 | Discusses SPR-158 Re Natural Circulation Mode of Operation. Mod to Control Sys to Give Operator Ability to Control Once Through Steam Generator Level in Control Room When Reactor Coolant Pumps Inoperable Not Recommended | |
ML20024C785 | 9 February 1978 | Expresses Concern W/Eccs Analysis Re Operator Interruption of HPI Following Initial Stage of Loca.Operating Procedures to Allow Termination of HPI Under Stated Conditions Should Be Written | |
ML20024C788 | 16 February 1978 | Discusses Acceptable Procedure for Terminating HPI Following Loca.Procedure Requested in 780209 Memo Will Be Modified Accordingly | |
ML20024C812 | 3 August 1978 | Requests Resolution of Operator Interruption of HPI During low-pressure Transients.Memos Dtd 780209 & 18 Encl | |
ML20024C816 | 15 November 1978 | Informs That Toledo Edison Needs to Reduce Auxiliary Feedwater Setpoints for Natural Circulation.Suggestion to Resolve Impasse Provided.Further Analytical Effort Required to Confirm 10 Ft Level Setpoint Adequate | |
ML20054E830 | 8 June 1982 | Releases Public Version of Revision to Administrative Procedure | |
ML20054F391 | 14 June 1982 | Releases Public Version of Revised Emergency Plan Implementing Procedure | |
ML20054F590 | 11 June 1982 | Advises That Jr Gray Will Present Argument for NRC at Oral Argument on Emergency Planning.Twenty Minutes Each Will Be Allotted for Aamodt,Licensee & Commonwealth Appeals | |
ML20054G582 | 15 June 1982 | Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components | |
ML20054G587 | 12 May 1982 | Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful | |
ML20054H139 | 17 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory |