Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20129K4507 November 1996Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Loop seal
High Radiation Area
Half scram
Hydrostatic
Temporary Modification
Squib
Scram Discharge Volume
Fuel cladding
Pressure Boundary Leakage
Minimum staff
Offsite Circuit
Power change
Unidentified leakage
Siren
ML20132D09613 June 1985Lists Efforts to Be Undertaken for Power Reactor Decommissioning for June-Dec 1985.PB Erickson Assigned as Project Manager for Decommissioning ActivitiesDecommissioning Funding Plan
ML20133F8922 October 1985Notification of 851011 Meeting W/Exxon Nuclear Co,Inc in Bethesda,Md to Discuss Recent Exxon Activities Toward Resolving Safety Analysis Issues
ML20134B50613 April 1994Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted
ML20136C1036 March 1997Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR
ML20136C40316 August 1979Forwards IE Bulletin 79-19, Packaging of Low Level Radwaste for Transport & Burial & Lists Licensees to Whom Bulletin Was Sent
ML20137G59113 March 1997Forwards Safety Evaluation Re Proposed TS Changes to Reflect Transition of Fuel Supplier from GE to Siemens Power Corp at Plants Unit 1 & 2
ML20137W52918 October 1985Forwards AEOD Assessment of LERs as SALP Input.Documentation Re Study of Reactor Trips for 1984 & ESF Actuations for First Half 1984 EnclTime of Discovery
Fire Barrier
Systematic Assessment of Licensee Performance
ML20138J7675 February 1997Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register PersonnelGeneric Fundamentals Examination
ML20138J9797 May 1997Notification of 970520 Meeting W/Commonwealth Edison in Rockville,Md to Discuss Commonwealth Edison Quality Initiatives & Plans for Dry Storage at Dresden
ML20140G54920 July 1977Advises That More Frequent Testing of BWR Relief & safety- Relief Valves Warranted Due to Continuing Failures. Description of long-range Program,Including Sample Ltr W/Tech Specs,ProvidedFuel cladding
ML20140G99617 June 1970Documents Conclusions Reached During ACRS 122nd Meeting Re Midland Plant Units 1 & 2 Request for Exemption to Allow Certain Const & ESF Instrumentation for Indian Point 2
ML20141F48319 May 1997Notifies of 970522 Meeting W/Util in Rockville,Md to Discuss NRC Recommendations Re Action Which Should Be Considered by Commonwealth Edison for Plant,Units 1 & 2
ML20141L85926 June 1972Forwards s to Utils Requesting Info on Experience W/Rod Worth Minimizers
ML20141N30123 June 1972Forwards Util 720607 Rept Re Hanger Failures on Torus Suction Header.Ro Bulletin 72-4 Sent to Operating Bwrs.Addl Info Will Be Forwarded When AvailableLiquid penetrant
ML20147J2399 April 1997Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations
ML20148D19828 May 1997Forwards Signed Original of Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately),For Transmittal to Ofc of Fr,For Publication.W/O Encl
ML20148D47428 May 1997Notification of Meeting W/Ce on 970602 in Rockville,Md to Discuss Concerns Addressed in Re Actions That Should Be Considered by CE for Plant,Units 1 & 2,in Response to IPEEE Fire Analysis Results
ML20148F46014 November 1977Notification of 771117 Meeting W/Utils in Bethesda,Md to Discuss SEP
ML20148P60024 December 1980Discusses Followup Study Re Degradation of Internal Appurtenances in LWR Piping During Normal Plant Operation & Potential Effects When Degraded Appurtenances Are Subj to Accident Loads.Recommends Review of Recurrent Problems
ML20149D86816 May 1994Forwards Signed Copy of Notice of Availability for Generic Communication That Has Been Issued for Transmittal to Ofc of Fr for Publication
ML20149M04710 December 1996Forwards Internet Mail Received from PM Blanch
ML20151F1228 April 1988Requests Encl Repts Containing Basic Ref Info Essential to long-term Licensing Responsibilities Be Entered Into Document Control Sys to Be Cataloged & Available to Sys Users.Record Copy
ML20151L7804 August 1997Notification of 970820 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Comed Response for Quad Cities IPEEE Conceptual Engineering Designs for long-term Resolution for Safe Shutdown EnhancementsSafe Shutdown
ML20153F10625 April 1988Notification of 880510 Counterpart Meeting W/Comm Ed in Rockville,Md to Discuss Status of BWR Licensing Issues
ML20154A28313 December 1986Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985Liquid penetrant
ML20154F00114 April 1969Forwards Insp Rept 50-275/69-03 & 50-237/69-05 on 690328. Info Provides Reasonable Assurance That Activities of Util, Westinghouse & Esco Re Pipe Fittings Mfg by Esco of Quality Consistent W/Requirements of PSAR
ML20154F02414 April 1969Forwards Insp Repts 50-275/69-03 & 50-237/69-05 on 690328. No Nonconformance Noted
ML20155F19410 April 1986Summarizes Operating Reactor Events Meeting 86-11 on 860407 Re Events Since 860331.List of Attendees,Discussion of Events,Status of Assignments & Assigned Completion Dates for Items Encl.Response Requested for Incomplete Assignments
ML20155H5305 November 1998Notification of 981119 Meeting with Ceco in Rockville,Md to Discuss Progress & Actions Util Taking to Resolve Fire Protection (App R) Issues Since Last Public Meeting on 980910
ML20196H4832 December 1998Forwards Facility Submitted Outline,Exam Submittal & as Given Operating Exam for Test Administered During Wk of 981026 at Dresden Nuclear Power StationSafe Shutdown
Fitness for Duty
Loop seal
Half scram
Nuclear Accident Reporting System
Job Performance Measure
Scram Discharge Volume
Earthquake
Power change
ML20196H84928 June 1999Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999
ML20196J8624 December 1998Discusses Three Plants,Evaluated for Consideration as Abnormal Occurrences & Other Event of Interest.Oconee & Quad Cities Plants Are Being Considered as AOs & Big Rock Point Being Considered as Other Event InterestSafe Shutdown
ML20196K55410 June 1999Forwards Request for Addl Info Re 10CFR50.46(A) Annual Rept. Note to File for TACs MA5336 & MA5337 Supercedes & Closes TACs MA1597,MA1598 & MA4426
ML20197B91423 July 1997Forwards Safety Evaluation Re Concrete Expansion Anchor Safety Factors for High Energy Line Break Restraints,In Response to Region III 960920 Request
ML20198A63130 December 1997Notification of Significant Licensee Meeting W/Util on 980109 in Lisle,Il to Discuss Apparent Violations & Other Issues Identified in NRC Inspection Repts 50-254/97-27 & 50-265/97-27
ML20198N92830 December 1998Notification of 990115 Meeting with Ceco in Rockville, Maryland to Discuss Progress & Actions Being Taken by Quad Cities to Resolve Fire Protection (App R) Issues & to Address Latest IPEEE Risk Evaluations
ML20199E04627 January 1998Notification of Significant Licensee Meeting W/Util on 980206 to Discuss Licensee Update of Methodology & Technical Resolutions to Current 10CFR50,App R Issues & to Discuss Scope & Type of Issues Requiring Review & Approval by NRC
ML20199E99428 January 1998Forwards Rev of 980127 Notice of Significant Licensee Meeting W/Location of Meeting Added
ML20199F01527 January 1998Revised Notification of 980206 Meeting W/Location of Meeting Added,W/Ceco in Lisle,Illinois to Discuss Licensee Update of Methodology & Technical Resolutions to Current 10CFR50 App R Issues & Scope & Type of Issues Requiring Review by NRC
ML20203H27428 July 1986Forwards,For Review,Latest Update of SALP Ratings
ML20204C76823 November 1977Requests Views of Regional Directors on Licensee Performance Eval of Subj Facils.Forwards Questions to Be Answered by 771209
ML20204H9017 October 1988Notification of Significant Licensee Meeting on 881028 W/Util in Glen Ellyn,Il to Discuss Fire Protection Findings
ML20205J5937 April 1999Informs of Court Cases Pending for California Energy Co in State of California
ML20205J5977 April 1999Forwards SER Accepting Util 980910 Proposal to NRC, Requesting Transfer of Indirect Control of Licenses DPR-29 & DPR-30 from Midamerican Energy Holding Co to Calenergy Co, Inc
ML20205P30513 September 1994Forwards Message Dealing with Allegation Received by Resident Inspector Staff at Quad Cities Station Re Missed Fire WatchFire Watch
ML20205R9913 November 1988Forwards NRR Input to SALP VII Rept for Apr 1987 - Sept 1988.List of Tech Spec Amends Issued During SALP Period Also EnclExemption Request
ML20205T6196 June 1986Forwards Updated Schedule for Licensing Actions Assigned to Region Iii.Completed Actions During May 1986 ListedFire Watch
ML20206F16421 June 1986Requests That Evaluations of Licensee Responses to Encl IE Bulletin 86-001 Re Min Flow Logic Problems That Could Disable RHR Pumps Not Be Closed Until Temporary Instruction for Guidance Issued
ML20206F34625 November 1998Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved