ML20113H632 | 31 December 1984 | Vols 1-4 to Tdi Diesel Generator Design Review & Quality Revalidation Rept | |
ML20114D425 | 10 January 1985 | Detailed Control Room Design Review Summary Rept | Emergency Lighting Operability Assessment |
ML20115J983 | 30 June 1996 | Individual Plant Examination of External Events for Severe Accident Vulnerabilities for Pnpp | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting Tornado Generated Missile Seismically rugged Exemption Request Earthquake Fire Protection Program Fire Watch Backfit Weak link |
ML20117E810 | 31 March 1986 | Results of Atmospheric Tracer Study within Bldg Complex at Pnpp | |
ML20128A028 | 30 June 1985 | Max Extended Operating Domain Analysis | Anticipated operational occurrence Feedwater Controller Failure Flow Induced Vibration |
ML20128L561 | 10 April 1996 | Safety Evaluation Summary Per 10CFR50.59(B)(2) 1994-1996 | Safe Shutdown Packing leak Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Tornado Missile Hydrostatic Past operability Fire impairment Nondestructive Examination Temporary Modification Emergency Lighting Feedwater Controller Failure Turbine Missile Fire Protection Program Weak link Unidentified leakage Failure to Scram |
ML20129K105 | 30 November 1984 | Land-Use Survey for 1984 | |
ML20133K888 | 14 October 1985 | Suppl 1 to Dcrdr Summary Rept | Post Accident Monitoring Emergency Lighting Scram Discharge Volume Operability Assessment |
ML20134A092 | 30 September 1985 | Single Loop Operation Analysis | Abnormal operational transient Feedwater Controller Failure Fuel cladding Coast down |
ML20134H219 | 18 October 1996 | Application of Acoustic Methodology for Evaluation of Submerged Structures on Mark III Large Passive ECCS Suction Strainer | Hydrostatic |
ML20138A949 | 1 November 1985 | Rev 1 to Environ Analysis of Silicone Rubber Boot Seals | |
ML20149F993 | 29 January 1988 | Final Rept,Msiv Solenoid Valve Failure,Analytical Chemistry Results | |
ML20151T952 | 3 February 1986 | ML 5.0 Earthquake,860131,Strong-Motion Data from Perry Nuclear Power Plant Seismic Instrumentation | Earthquake |
ML20155K139 | 30 December 1987 | Final Rept MSIV 3-Way Dual Solenoid Valve Failures | Half scram Grab sample Stroke time |
ML20196A195 | 17 June 1999 | Instrument Drift Analysis | |
ML20196B787 | 21 April 1995 | Pennsylvania Power Co Master Decommissioning Trust Agreement for Beaver Valley Power Station & Perry Nuclear Power Plant | |
ML20196B850 | 1 July 1993 | Ohio Edison Co Master Decommissioning Trust Agreement for Perry Nuclear Power Plant Unit One,Perry Nuclear Power Plant Unit Two,Beaver Valley Power Station Unit One & Beaver Valley Power Station Unit Two | |
ML20196B877 | 16 December 1996 | First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961231 Between Toledo Edison Co & Mellon Bank | |
ML20196B895 | 16 December 1996 | First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961216 Between Cleveland Electric Illuminating Co & Mellon Bank | |
ML20198D550 | 30 April 1986 | Cleveland Electric Illuminating Co,Perry Power Plant Confirmatory Program of 860131 Ohio Earthquake Effect, Progress Rept | Earthquake |
ML20198J314 | 20 May 1986 | Suppl 2 to Dcrdr Summary Rept | |
ML20202F339 | 31 July 1986 | Control Room Validation Summary Rept | Pressure Boundary Leakage Failure to Scram |
ML20203G079 | 28 July 1986 | Unit 1 Offgas Sys Charcoal Adsorber Combustion Events Final Rept | Hydrostatic Scaffolding |
ML20203G088 | 29 July 1986 | General Description & Background of Offgas Sys | Loop seal |
ML20203G093 | 29 July 1986 | Analysis of Physical & Chemical Properties of Original & Replacement Activated Carbon | |
ML20203G117 | 29 July 1986 | Analysis of Mode of Ignition & Combustion Propagation for Both Charcoal Adsorber Bed Combustion Events | |
ML20203G122 | 29 July 1986 | Metallurgical Analysis of Offgas Sys Adsorber Bed Vessels | Hydrostatic |
ML20203G133 | 29 July 1986 | Description of Charcoal Removal,Sys Drying & Replacement Carbon Installation Activities | Hydrostatic |
ML20203G156 | 29 July 1986 | Description of Testing Methods to Verify Adequacy of Offgas Vault Refrigeration & Processing Sys. W/19 Photographs of Offgas Sys Components & Recovery Activities.Attachment 2 Contains 25 Oversize Graphs of N-64 Offgas Sys Event | |
ML20203G541 | 24 April 1986 | Emergency Instruction Validation Summary Rept | |
ML20203N417 | 30 April 1986 | Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications | Nondestructive Examination Liquid penetrant |
ML20204F664 | 28 May 1986 | Rev 1 to Environ Qualification Rept of Two Duct Sealants | |
ML20205N709 | 23 March 1987 | Draft GE Record in Nuclear Safety:Independent Study of GE Nuclear Control & Implementation Dept Based on Records of SA Milam & Nrc. NRC Lists of Documentation Examined & Related Info Encl | Safe Shutdown Reactor Vessel Water Level Loctite |
ML20210J873 | 7 April 1994 | Detoxification of Clam-Trol CT-4 & CT-1:Daphnia Magna Bioassays | |
ML20210T580 | 25 February 1986 | Spectral Analysis of Perry Nuclear Power Plant Velocity- Time Histories Resulting from Ohio Earthquake | Earthquake |
ML20212G746 | 7 January 1987 | Rept of Emergency Evacuation Review Team on Emergency Response Plans for Perry & Davis-Besse Nuclear Power Plants | Probabilistic Risk Assessment Earthquake Chernobyl |
ML20246B203 | 23 June 1989 | Safety Evaluation for Limitorque Motor Operators Motor W/O T-Drains | Boric Acid |
PY-CEI-NRR-0478, Rev 0 to Deep Well Injection at Calhio Wells & Leroy,Oh Earthquake of 860131 | 10 June 1986 | Rev 0 to Deep Well Injection at Calhio Wells & Leroy,Oh Earthquake of 860131 | Earthquake |
PY-CEI-NRR-0835, Motor Valve Testing & Evaluatiion at Perry Nuclear Power Plant (IE Bulletin 85-003) | 31 March 1988 | Motor Valve Testing & Evaluatiion at Perry Nuclear Power Plant (IE Bulletin 85-003) | Stroke time Hydrostatic |
PY-CEI-NRR-1463, Rev 0 to Evaluation of Flaw Indications in Perry FW Nozzle to Safe-End Welds Extrapolated Beyond RF0-3 | 14 February 1992 | Rev 0 to Evaluation of Flaw Indications in Perry FW Nozzle to Safe-End Welds Extrapolated Beyond RF0-3 | |
PY-CEI-NRR-2076, Rev 2 to Nonproprietary Version of Controlled Copy of Dose Calculation Data Base for Application of Revised DBA Source Term to CEI Pnpp | 14 June 1996 | Rev 2 to Nonproprietary Version of Controlled Copy of Dose Calculation Data Base for Application of Revised DBA Source Term to CEI Pnpp |