Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000344/1988045 | 3 November 1988 | Forwards Safeguards Insp Rept 50-344/88-45 on 881017-20. Violations Noted.Encls Withheld (Ref 10CFR2.790(d) & 73.21) | |
IR 05000344/1989001 | 28 June 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/89-01 | |
IR 05000344/1989002 | 5 May 1989 | Forwards Safeguards Insp Rept 50-344/89-02 on 890329-0420. Notification of Enforcement Actions Based on Substandard Performance of Security Officers in Use of Firearms Will Be Provided.Rept Withheld (Ref 10CFR2.790) | |
IR 05000344/1989005 | 1 June 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/89-05 | |
IR 05000344/1989008 | 27 July 1989 | Discusses Safeguards Insp Rept 50-344/89-08 & Security Insp Rept 50-344/89-02 & Forwards Notice of Violation Re Safeguards Info Protection & Firearms Training Adequacy.Encl Withheld (Ref 10CFR2.790) | |
IR 05000344/1989010 | 14 July 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/89-10. Corrective Actions Will Be Verified During Future Insp | |
IR 05000344/1989012 | 27 September 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/89-12.Contested Violation Re Interpretation of SNT-TC-1A Requirements Will Be Further Examined | High Radiation Area Nondestructive Examination VT-2 |
IR 05000344/1989014 | 7 August 1989 | Ack Receipt of 890707 & 28 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/89-14. Handwritten Notes Encl | High Radiation Area |
IR 05000344/1989017 | 12 September 1989 | Forwards Insp Rept 50-344/89-17 on 890618-0729 & Notice of Violation.Insp Identified That ESF Components Had Been Operated Outside Normal Design Limits | |
IR 05000344/1989018 | 25 September 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/89-18 | |
IR 05000344/1990011 | 27 July 1990 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/90-11 | |
IR 05000344/1990018 | 10 July 1990 | Forwards Safeguards Insp Rept 50-344/90-18 on 900625-29.No Violations Noted.Rept Withheld (Ref 10CFR2.790(d)) | |
IR 05000344/1990200 | 30 January 1992 | Revises Commitment Date to Resolve Svc Water Sys Water Hammer Concern,Identified in Edsfi Rept 50-344/90-200 from 920131 to 0430 | |
IR 05000344/1992019 | 27 August 1992 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/92-19 | |
IR 05000344/1992029 | 18 December 1992 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/92-29 | |
IR 05000344/1997005 | 25 March 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/97-05.Actions Will Be Reviewed During Future Insp to Determine That Full Compliance Has Been Achieved & Will Be Maintained | Scaffolding |
ML17249A964 | 18 October 1979 | Notifies of State Senate Bill 641 Requiring State Dept of Energy to Maintain Inspector at Nuclear Plant on 40-h/wk Basis.Requests NRC Comments on Training,Duties & Responsibilities & Working Relationship W/Nrc Inspector | |
ML17311A104 | 30 October 1989 | Advises That Commitment Date for Performance of Surveillance Moved to 891130 to Allow for Incorporation in Biennial Audit Per Rev 1 to LER 89-08.NRC Resident Inspector Informed of Change on 891013 | |
ML18036A979 | 30 January 1992 | Revises Commitment Date to Resolve Svc Water Sys Water Hammer Concern,Identified in Edsfi Rept 50-344/90-200 from 920131 to 0430 | |
ML18082A492 | 12 May 1980 | Forwards Schedule for Evaluation of Westinghouse Steam Generator Row One U Bends.Requests Delay of NRC Issuance of Generic Ltrs to near-term OL Plants Requiring Plugging of Row One Tubes,In Confirmation of 800415 Meeting | Nondestructive Examination |
ML20054E820 | 2 June 1982 | Discusses IE 820316-0430 Insp of Circumstances Associated W/ Inoperability of Emergency Diesel Generators During 811108- 12,1201-820104 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty | |
ML20054F248 | 8 June 1982 | Forwards IE Enforcement Conference Rept 50-344/82-19 on 820507 | |
ML20054F383 | 11 June 1982 | Forwards Addl Info Re Implementation Schedules for NUREG-0737 Items,In Response to Generic Ltr 82-10.Items Include I.A.1.3.1,I.A.1.3.2,I.C.1,II.D.1.2,II.D.1.3, II.K.3.30,II.K.3.31,III.A.1.2,III.A.2.2 & III.D.3.4 | |
ML20054F855 | 10 June 1982 | Forwards Amend 74 to License NPF-1 & Notice of Issuance & Availability.Amend Deletes Certain Tech Spec Requirements for Pump & Valve Testing Now Covered Under 10CFR50.55a | |
ML20054G482 | 14 June 1982 | Submits Supplemental Check for Class III License Fee for Amend 72 to License NPF-1,in Response to NRC | |
ML20054G611 | 4 June 1982 | Forwards IE Insp Rept 50-344/82-12 on 820316-0430. Enforcement Action to Be Subj of Separate Correspondence | |
ML20054G810 | 2 June 1982 | Forwards IE Insp Rept 50-344/82-16 on 820503-07.No Noncompliance Noted | |
ML20054G870 | 8 June 1982 | Responds to NRC Re Violations Noted in IE Insp Rept 50-344/82-10.Corrective Actions:Statement Prohibiting Use of Fire Hoses for Nonemergency Purposes Added to Procedure PS-3-21.Fire Brigade Training Will Be Conducted | |
ML20054H137 | 15 June 1982 | Forwards Endorsement 47 to Maelu Policy MF-86 & Endorsement 55 to Nelia Policy NF-225 | |
ML20054H354 | 8 June 1982 | Requests That Util Continue to Apply Interim Operating Restrictions Until Westinghouse 820120 Rept Reviewed,Per Util Re Intent to Return to Unrestricted Automatic Rod Control Commencing W/Startup for Fuel Cycle 5 | |
ML20054H763 | 18 June 1982 | Forwards Westinghouse Evaluation of Use of Fuel Assemblies Containing Stainless Steel Fuel Rod Replacements.Stainless Steel Rods Will Not Have Significant Impact on Cycle 5 Core. Prompt Approval of License Change Application 88 Requested | |
ML20054H892 | 16 June 1982 | Responds to Re Changes to Facility Security Plan. Changes Consistent w/10CFR50.54(p) | |
ML20054H909 | 17 June 1982 | Forwards Revision 2 to Security Force Training & Qualification Plan.Revision Withheld (Ref 10CFR2.790) | |
ML20054J056 | 18 June 1982 | Responds to 820205 Request for Relief from Certain ASME Code Section XI Requirements.Relief Granted Until 860520.Forwards Safety Evaluation & Notice of Granting of Relief | |
ML20054J215 | 11 June 1982 | Forwards IE Insp Rept 50-344/82-18 on 820419-0528.No Noncompliance Noted | |
ML20054J538 | 22 June 1982 | Forwards Revision to Design Info Questionnaires Re Fuel Pin Exchange Process Conducted at Facility | |
ML20054J659 | 24 June 1982 | Forwards Final Response to 810508 Request for Addl Info Re Evaluation Criteria for Masonry Walls.Items 6-10 Addressed | |
ML20054L569 | 18 June 1982 | Confirms 820618 Telcon Between Jl Crews & Bd Withers Re Degradation of Thermal Sleeve Components in Rcs.Power Operation Will Not Resume Until Matter Resolved | |
ML20054L592 | 15 June 1982 | Forwards IE Insp Rept 50-344/82-17 on 820525-28.No Noncompliance Noted | |
ML20054M130 | 10 June 1982 | Forwards Monthly Operating Rept for May 1982 | |
ML20055A141 | 9 July 1982 | Forwards Monthly Operating Rept for June 1982 | |
ML20055A344 | 1 July 1982 | Forwards Conservative Calculation of Enthalpy Rise Factor W/Power Level & Tech Specs Limits | |
ML20055A346 | 6 July 1982 | Forwards FEMA Region X Evaluation of Potential Effects Upon Response Capabilities W/Respect to Volcanic Activity Such as Ashfall Mudflow,Floods,Landslides,Earthquakes & Future Eruptions | Earthquake |
ML20055A500 | 30 June 1982 | Responds to Re Acceptability of Corbin 436 & 437 Combination Padlock for Protecting Safeguards Info.Padlocks Should Meet Criteria of Reg Guide 5.12, General Use of Locks in Protection & Control of Facilities & Snm | |
ML20055B273 | 25 June 1982 | Forwards Public Version or Revision 3 to Radiological Emergency Response Plan Implementing Procedure EP-18, Fire Fighting. Receipt Form Encl | |
ML20055B770 | 2 July 1982 | Forwards Response to 820602 Notice of Violation & Proposed Imposition of Civil Penalties.Cause of Failure Not Design Deficiency But Analytical Error Leading to Incorrect Training Info Bulletin.Revised Standing Order Issued | |
ML20055C134 | 3 August 1982 | Advises That Main Steam Line Radiation & Containment Hydrogen Monitors Will Be Operational by 821001,per NUREG-0737 Items II.F.1.1 & II.F.1.6 |