Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000219/LER-1982-060, Forwards LER 82-060/03L-0.Detailed Event Analysis Encl11 January 1983Forwards LER 82-060/03L-0.Detailed Event Analysis Encl
05000219/LER-1983-001, Forwards LER 83-001/03L-0.Detailed Event Analysis Encl25 February 1983Forwards LER 83-001/03L-0.Detailed Event Analysis Encl
05000219/LER-1983-002, Forwards LER 83-002/03L-0.Detailed Event Analysis Encl4 March 1983Forwards LER 83-002/03L-0.Detailed Event Analysis Encl
05000219/LER-1983-003, Forwards LER 83-003/03L-0.Detailed Event Analysis Encl15 February 1983Forwards LER 83-003/03L-0.Detailed Event Analysis EnclReactor Vessel Water Level
05000219/LER-1983-005, Forwards LER 83-005/03L-0.Detailed Event Analysis Encl4 March 1983Forwards LER 83-005/03L-0.Detailed Event Analysis Encl
05000219/LER-1983-006, Forwards LER 83-006/03L-0.Detailed Event Analysis Encl4 March 1983Forwards LER 83-006/03L-0.Detailed Event Analysis Encl
05000219/LER-1983-008, Forwards LER 83-008/03L-0.Detailed Event Analysis Encl12 April 1983Forwards LER 83-008/03L-0.Detailed Event Analysis Encl
05000219/LER-1983-009, Forwards LER 83-009/01T-0.Detailed Event Analysis Encl15 March 1983Forwards LER 83-009/01T-0.Detailed Event Analysis Encl
05000219/LER-1983-010, Forwards LER 83-010/01T-0.Detailed Event Analysis Encl23 March 1983Forwards LER 83-010/01T-0.Detailed Event Analysis Encl
05000219/LER-1983-011, Forwards LER 83-011/03L-0.Detailed Event Analysis Encl23 March 1983Forwards LER 83-011/03L-0.Detailed Event Analysis Encl
05000219/LER-1983-012, Forwards LER 83-012/01T-0.Detailed Event Analysis Encl4 April 1983Forwards LER 83-012/01T-0.Detailed Event Analysis Encl
05000219/LER-1983-013, Forwards LER 83-013/01T-0.Detailed Event Analysis Encl8 April 1983Forwards LER 83-013/01T-0.Detailed Event Analysis Encl
05000219/LER-1983-014, Forwards LER 83-014/01T-0.Detailed Event Analysis Encl20 April 1983Forwards LER 83-014/01T-0.Detailed Event Analysis Encl
05000219/LER-1985-018, Responds to 860106 Request for Reevaluation of long-term Corrective Actions Re LER 85-018, Emergency Svc Water Pipe Coating Failure. Util Intends to Optically Inspect Essential Svc Water Sys on Refueling Outage Basis15 September 1986Responds to 860106 Request for Reevaluation of long-term Corrective Actions Re LER 85-018, Emergency Svc Water Pipe Coating Failure. Util Intends to Optically Inspect Essential Svc Water Sys on Refueling Outage Basis
05000219/LER-1986-001, Responds to Request for Info Re Reactor Protection Sys Switch Replacement Per Amend 95 to License DPR-16 & LER 86-01.Static-o-ring Switches Will Be Replaced.Tech Spec Change Request Will Be Submitted by 86081527 May 1986Responds to Request for Info Re Reactor Protection Sys Switch Replacement Per Amend 95 to License DPR-16 & LER 86-01.Static-o-ring Switches Will Be Replaced.Tech Spec Change Request Will Be Submitted by 860815
05000219/LER-1987-030, Forwards Rev 1 to LER 87-030.Event Date Incorrectly Reported in Two Places on LER Due to Administrative Oversight5 November 1987Forwards Rev 1 to LER 87-030.Event Date Incorrectly Reported in Two Places on LER Due to Administrative Oversight
05000219/LER-1988-013, Responds to NRC Request for Addl Info Re LER 88-013, MSIV Failure Caused by MSIV Poppet Vibration Dtd 880808.All Four MSIVs Will Be Tested in Two Refueling Cycles.Penetrant Testing Will Be Performed Anytime Valve Stem Removed9 February 1989Responds to NRC Request for Addl Info Re LER 88-013, MSIV Failure Caused by MSIV Poppet Vibration Dtd 880808.All Four MSIVs Will Be Tested in Two Refueling Cycles.Penetrant Testing Will Be Performed Anytime Valve Stem Removed
05000219/LER-1989-025, Responds to 901002 Safety Evaluation Re 891216 Event Involving Two Control Rods Moving at Same Time Reported Via LER 89-025.Mod to Reduce Probability of Simultaneous Control Rod Withdrawal Will Be Installed in 13R Refueling Out11 January 1991Responds to 901002 Safety Evaluation Re 891216 Event Involving Two Control Rods Moving at Same Time Reported Via LER 89-025.Mod to Reduce Probability of Simultaneous Control Rod Withdrawal Will Be Installed in 13R Refueling Outage
05000219/LER-1993-006, Informs of Change to Submission Date for LER 93-006, Supplemental Rept to 94123125 March 1994Informs of Change to Submission Date for LER 93-006, Supplemental Rept to 941231
05000219/LER-1997-004, Adds Oyster Creek Nuclear Generating Station Rwcs Valve V-16-2 to Scope of GL 89-10,suppl 3 Valves IAW Corrective Actions Identified in LER 97-04,dtd 970425.Description Design Basis Conditions Established for RWCU Valve,Encl5 November 1997Adds Oyster Creek Nuclear Generating Station Rwcs Valve V-16-2 to Scope of GL 89-10,suppl 3 Valves IAW Corrective Actions Identified in LER 97-04,dtd 970425.Description Design Basis Conditions Established for RWCU Valve,EnclStroke time
05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts30 September 1999Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts
05000219/LER-1998-012, Forwards LER 98-012-00 Re Actuation of ESF by Test Instrument,Due to Inadequate Procedure.Event Did Not Impact Health & Safety of Public16 October 1998Forwards LER 98-012-00 Re Actuation of ESF by Test Instrument,Due to Inadequate Procedure.Event Did Not Impact Health & Safety of Public
05000219/LER-1998-015, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page5 April 1999Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page
05000220/LER-1981-019, Forwards LER 81-019/03L-07 July 1981Forwards LER 81-019/03L-0
05000220/LER-1982-009, Forwards Updated LER 82-009/01X-112 August 1982Forwards Updated LER 82-009/01X-1
05000220/LER-1982-010, Forwards LER 82-010/03L-022 April 1982Forwards LER 82-010/03L-0
05000220/LER-1982-011, Forwards LER 82-011/03L-09 August 1982Forwards LER 82-011/03L-0
05000220/LER-1982-012, Forwards LER 82-012/04L-024 September 1982Forwards LER 82-012/04L-0
05000220/LER-1982-015, Forwards LER 82-015/03L-016 December 1982Forwards LER 82-015/03L-0
05000220/LER-1982-016, Forwards LER 82-016/03L-022 December 1982Forwards LER 82-016/03L-0
05000220/LER-1983-001, Forwards LER 83-001/04L-018 February 1983Forwards LER 83-001/04L-0
05000220/LER-1983-002, Forwards LER 83-002/04L-011 March 1983Forwards LER 83-002/04L-0
05000220/LER-1983-003, Forwards LER 83-003/04L-023 March 1983Forwards LER 83-003/04L-0
05000220/LER-1983-004, Forwards LER 83-004/03L-028 March 1983Forwards LER 83-004/03L-0
05000220/LER-1983-005, Forwards LER 83-005/01T-025 March 1983Forwards LER 83-005/01T-0
05000220/LER-1983-020, Forwards Updated LER 83-020/03X-127 April 1983Forwards Updated LER 83-020/03X-1
05000220/LER-1988-009, FOIA Request for LER 88-09,NRC Enforcement Conference W/Util on 880711,Insp Rept 50-220/88-15 & NRC Notice of Violation Ltr to Util15 May 1989FOIA Request for LER 88-09,NRC Enforcement Conference W/Util on 880711,Insp Rept 50-220/88-15 & NRC Notice of Violation Ltr to Util
05000220/LER-1997-012, Clarifies CA 3 of LER 97-12, Addl 10CFR50 App R Section Iii.J Lighting Deficiencies31 March 1998Clarifies CA 3 of LER 97-12, Addl 10CFR50 App R Section Iii.J Lighting Deficiencies
05000220/LER-1997-015, Informs NRC That Util Is Retracting LER 97-015, Potential Bypass Leakage Path Between Drywell & Torus During Vent & Purge, Which Had Been Reported IAW 10CFR50.73(a)(2)(v)(D). Leakage Path Would Not Have Prevented Plant Function1 May 1998Informs NRC That Util Is Retracting LER 97-015, Potential Bypass Leakage Path Between Drywell & Torus During Vent & Purge, Which Had Been Reported IAW 10CFR50.73(a)(2)(v)(D). Leakage Path Would Not Have Prevented Plant Functions
05000220/LER-1998-003, Forwards LER 98-003-00 Re Power/Flow Relationship TS Violation.Rept Fulfills Requirement of TS 3.1.7.g for 30-day Written Rept If Power/Flow Relationship of COLR Is Exceeded3 April 1998Forwards LER 98-003-00 Re Power/Flow Relationship TS Violation.Rept Fulfills Requirement of TS 3.1.7.g for 30-day Written Rept If Power/Flow Relationship of COLR Is Exceeded
05000220/LER-1998-013, Forwards LER 98-013-00 Re Valve Repositioning Caused by non-conformance W/App R Safe Shutdown Analysis6 July 1998Forwards LER 98-013-00 Re Valve Repositioning Caused by non-conformance W/App R Safe Shutdown AnalysisSafe Shutdown
05000220/LER-1998-014, Forwards LER 98-014-00 Re CR Staffing in Violation of TS Due to Unqualified SRO Assuming SRO Shift Duties17 July 1998Forwards LER 98-014-00 Re CR Staffing in Violation of TS Due to Unqualified SRO Assuming SRO Shift Duties
05000244/LER-1982-009, Forwards LER 82-009/03L-016 April 1982Forwards LER 82-009/03L-0
05000244/LER-1982-010, Forwards LER 82-010/01T-06 April 1982Forwards LER 82-010/01T-0
05000244/LER-1982-012, Forwards LER 82-012/03L-09 June 1982Forwards LER 82-012/03L-0
05000244/LER-1982-013, Forwards LER 82-013/01T-02 June 1982Forwards LER 82-013/01T-0
05000244/LER-1982-014, Forwards LER 82-014/03L-022 July 1982Forwards LER 82-014/03L-0
05000244/LER-1982-015, Forwards LER 82-015/03L-024 July 1982Forwards LER 82-015/03L-0
05000244/LER-1982-016, Forwards LER 82-016/03L-021 August 1982Forwards LER 82-016/03L-0
05000244/LER-1982-017, Forwards LER 82-017/03L-020 August 1982Forwards LER 82-017/03L-0