05000266/LER-1997-035, Forwards LER 97-035-00 Re Discovery of Inadequate Seismic Support for Reactor Coolant Pump Rotor Stand.Ler Being Submitted Beyond 30-day Requirement Due to Administrative Process Control Weakness | 15 August 1997 | Forwards LER 97-035-00 Re Discovery of Inadequate Seismic Support for Reactor Coolant Pump Rotor Stand.Ler Being Submitted Beyond 30-day Requirement Due to Administrative Process Control Weakness | |
05000266/LER-1997-036, Forwards LER 97-036-00,describing Discovery That Coincidental,Random Failure of Particular DC Power Supply During Seismic or Tornado Event Could Prevent Timely Stoppage of Auxiliary Feedwater Pumps | 25 September 1997 | Forwards LER 97-036-00,describing Discovery That Coincidental,Random Failure of Particular DC Power Supply During Seismic or Tornado Event Could Prevent Timely Stoppage of Auxiliary Feedwater Pumps | Earthquake |
05000266/LER-1997-037, Forwards LER 97-037-00 Re Potential Failure of EDG Load Sequence.New Commitments within Rept Indicated in Italics | 30 September 1997 | Forwards LER 97-037-00 Re Potential Failure of EDG Load Sequence.New Commitments within Rept Indicated in Italics | Unanalyzed Condition |
05000266/LER-1997-038, Forwards LER 97-038-00 Re Inoperability of Standby Emergency Power Supply for Approx 15 Days Due to Failure That Occurred When EDG G-03 Was Shut Down at Completion of Testing | 24 October 1997 | Forwards LER 97-038-00 Re Inoperability of Standby Emergency Power Supply for Approx 15 Days Due to Failure That Occurred When EDG G-03 Was Shut Down at Completion of Testing | |
05000266/LER-1997-039, Forwards LER 97-039-00 Re RHR Loop Inoperable,Due to Inoperable CCW Pump.New Commitments within Rept Indicated in Italics | 14 November 1997 | Forwards LER 97-039-00 Re RHR Loop Inoperable,Due to Inoperable CCW Pump.New Commitments within Rept Indicated in Italics | |
05000266/LER-1997-040, Forwards LER 97-040-01 Which Documents Event That Occurred at Point Beach Nuclear Plant,Unit 1.Commitments Made within Ltr,Encl | 21 November 1997 | Forwards LER 97-040-01 Which Documents Event That Occurred at Point Beach Nuclear Plant,Unit 1.Commitments Made within Ltr,Encl | Unanalyzed Condition |
05000266/LER-1997-041, Forwards LER 97-041-00 Which Describes Discovery of Potential Common Mode Failure in Control Circuits of AFW Sys at Pbnp,Unit 1.Commitments Made within Ltr,Encl | 24 November 1997 | Forwards LER 97-041-00 Which Describes Discovery of Potential Common Mode Failure in Control Circuits of AFW Sys at Pbnp,Unit 1.Commitments Made within Ltr,Encl | |
05000266/LER-1997-042, Forwards LER 97-042-00 Which Describes Discovery That Upper Containment Personnel Air Lock Interlock Had Been Inoperable & Required Surveillance Had Not Been Completed. New Commitments within Rept,Indicated in Italics | 1 December 1997 | Forwards LER 97-042-00 Which Describes Discovery That Upper Containment Personnel Air Lock Interlock Had Been Inoperable & Required Surveillance Had Not Been Completed. New Commitments within Rept,Indicated in Italics | |
05000266/LER-1997-043, Forwards LER 97-043-01,re Discovery That TS Surveillance of Reactor Trip Sys Interlocks Were Not Adequate. Supplemental Info Is Provided at End of Rept.Previous Commitments Made within Rept Also Encl | 16 March 1998 | Forwards LER 97-043-01,re Discovery That TS Surveillance of Reactor Trip Sys Interlocks Were Not Adequate. Supplemental Info Is Provided at End of Rept.Previous Commitments Made within Rept Also Encl | |
05000266/LER-1997-044, Forwards LER 97-044-00 Which Describes Discovery That Inservice Test Procedure Used Dedicated Operator to Provide Operabiliity of Containment Spray Additive Sys While Both Redundant Trains Were Isolated.No New Commitments Liste | 15 January 1998 | Forwards LER 97-044-00 Which Describes Discovery That Inservice Test Procedure Used Dedicated Operator to Provide Operabiliity of Containment Spray Additive Sys While Both Redundant Trains Were Isolated.No New Commitments Listed | |
05000266/LER-1998-002, Forwards LER 98-002-00,re High Voltage Station Auxiliary Transformer Failure Due to Ground in Low Voltage Side Bus Duct.New Commitments within Rept Indicated in Italics Per 10CFR50.73(a)(2)(i)(B) Requirements | 9 February 1998 | Forwards LER 98-002-00,re High Voltage Station Auxiliary Transformer Failure Due to Ground in Low Voltage Side Bus Duct.New Commitments within Rept Indicated in Italics Per 10CFR50.73(a)(2)(i)(B) Requirements | |
05000266/LER-1998-003, Forwards LER 98-003-00,describing Discovery That Flow Meters Used to Set SW Flow Through Accident Fan Cooler Heat Exchangers Resulted in Potentially Less Flow than Assumed in Analysis for Operability of Motors During Accident | 9 February 1998 | Forwards LER 98-003-00,describing Discovery That Flow Meters Used to Set SW Flow Through Accident Fan Cooler Heat Exchangers Resulted in Potentially Less Flow than Assumed in Analysis for Operability of Motors During Accident | |
05000266/LER-1998-004, Forwards LER 98-004-00,re Discovery That Reactor Coolant Pump Lube Oil Collection Sys Did Not Fully Comply W/Prescriptive Requirements of 10CFR50 App R Section III.0. Commitments Made within Ltr,Encl | 13 February 1998 | Forwards LER 98-004-00,re Discovery That Reactor Coolant Pump Lube Oil Collection Sys Did Not Fully Comply W/Prescriptive Requirements of 10CFR50 App R Section III.0. Commitments Made within Ltr,Encl | |
05000266/LER-1998-005, Forwards LER 98-005-00 Re Discovery That Two Control Rod Exercise Tests Has Not Been Conducted at two-week Interval Required by Ts.New Commitments Made within Rept Identified in Italics | 18 February 1998 | Forwards LER 98-005-00 Re Discovery That Two Control Rod Exercise Tests Has Not Been Conducted at two-week Interval Required by Ts.New Commitments Made within Rept Identified in Italics | |
05000266/LER-1998-006, Forwards LER 98-006-00 Re Unanticipated Partial Svc Water Sys Isolation During Special Test.New Commitments within Rept Indicated in Italics | 20 February 1998 | Forwards LER 98-006-00 Re Unanticipated Partial Svc Water Sys Isolation During Special Test.New Commitments within Rept Indicated in Italics | |
05000266/LER-1998-007, Forwards LER 98-007-00 Re Event or Condition That Resulted in Condition of Nuclear Plant,Including Principal Safety Barriers,Being Seriously Degraded.Mfg Deficiency Previously Reported to Commission Via 10CFR21 Notification on | 20 February 1998 | Forwards LER 98-007-00 Re Event or Condition That Resulted in Condition of Nuclear Plant,Including Principal Safety Barriers,Being Seriously Degraded.Mfg Deficiency Previously Reported to Commission Via 10CFR21 Notification on 980112 | |
05000266/LER-1998-008, Forwards LER 98-008-00 Re EDG Air Start Motor Solenoid Valves Found W/Springs Not in Accordance W/Design.New Commitments Established within Rept Presented in Italics | 5 March 1998 | Forwards LER 98-008-00 Re EDG Air Start Motor Solenoid Valves Found W/Springs Not in Accordance W/Design.New Commitments Established within Rept Presented in Italics | |
05000266/LER-1998-009, Forwards LER 98-009-00,describing Discovery of Undervoltage Relay Contacts in Safeguards Sequence Circuitry That Were Not Tested IAW Requirements of TS 15.4.6.A.2 & Table 15.4.1-1,Item 13.Commitments Established within Rept | 4 March 1998 | Forwards LER 98-009-00,describing Discovery of Undervoltage Relay Contacts in Safeguards Sequence Circuitry That Were Not Tested IAW Requirements of TS 15.4.6.A.2 & Table 15.4.1-1,Item 13.Commitments Established within Rept | |
05000266/LER-1998-010, Forwards LER 98-010-01,re Containment Spray Channel Functional Testing.Commitments Made within Ltr,Encl | 3 August 1998 | Forwards LER 98-010-01,re Containment Spray Channel Functional Testing.Commitments Made within Ltr,Encl | |
05000266/LER-1998-011, Forwards LER 98-011-00 Re Missed Tech Specs Surveillance of Radiation Monitor Prior to Discharge.New Commitments within Rept Indicated in Italics | 22 April 1998 | Forwards LER 98-011-00 Re Missed Tech Specs Surveillance of Radiation Monitor Prior to Discharge.New Commitments within Rept Indicated in Italics | |
05000266/LER-1998-012, Forwards LER 98-012-00 Re Discovery That twenty-seven Containment Penetrations Were Not Pressure Tested IAW ASME Section XI Requirements within Required Time Frame | 29 April 1998 | Forwards LER 98-012-00 Re Discovery That twenty-seven Containment Penetrations Were Not Pressure Tested IAW ASME Section XI Requirements within Required Time Frame | |
05000266/LER-1998-013, Forwards LER 98-013-00,describing Discovery That Root Valves for Containment Spray Pump Discharge Pressure Indicators Were Not Being Maintained in Normally Closed Configuration. New Commitments within Rept Are Indicated by Ital | 16 May 1998 | Forwards LER 98-013-00,describing Discovery That Root Valves for Containment Spray Pump Discharge Pressure Indicators Were Not Being Maintained in Normally Closed Configuration. New Commitments within Rept Are Indicated by Italics | |
05000266/LER-1998-014, Forwards LER 98-014-00,describing ESF (Swp) That Started Automatically During Testing of EDG Output Breaker | 17 May 1998 | Forwards LER 98-014-00,describing ESF (Swp) That Started Automatically During Testing of EDG Output Breaker | |
05000266/LER-1998-015, Forwards LER 98-015-00,re Containment Fan Cooler Test Results Outside Acceptance Criteria at Plant,Unit 1 | 20 May 1998 | Forwards LER 98-015-00,re Containment Fan Cooler Test Results Outside Acceptance Criteria at Plant,Unit 1 | |
05000266/LER-1998-016, Forwards LER 98-016-00,which Describes Evaluation of Surveillance Testing of Refueling Sys Interlocks & Safety Features.No New Commitments Made within Ltr | 26 May 1998 | Forwards LER 98-016-00,which Describes Evaluation of Surveillance Testing of Refueling Sys Interlocks & Safety Features.No New Commitments Made within Ltr | Missed surveillance |
05000266/LER-1998-017, Forwards LER 98-017-00 Re Discovery of Weld Deficiencies on Piping Support for B Loop RTD Manifold Bypass Piping.Rept Provided IAW 10CFR50.73(a)(2)(ii)(B).No New Commitments Are Contained in Rept | 11 June 1998 | Forwards LER 98-017-00 Re Discovery of Weld Deficiencies on Piping Support for B Loop RTD Manifold Bypass Piping.Rept Provided IAW 10CFR50.73(a)(2)(ii)(B).No New Commitments Are Contained in Rept | |
05000266/LER-1998-018, Forwards LER 98-018-00,describing Discovery of Deficiency in App J Containment Pressure Testing Program for Vent Valves Associated W/Containment Electrical Penetrations.New Commitments within Rept Indicated in Italics | 29 June 1998 | Forwards LER 98-018-00,describing Discovery of Deficiency in App J Containment Pressure Testing Program for Vent Valves Associated W/Containment Electrical Penetrations.New Commitments within Rept Indicated in Italics | Missed surveillance |
05000266/LER-1998-019, Forwards LER 98-019-00 Re Inoperability of Hydrogen Monitors for Both Units Due to Lack of Environ Qualification of Terminal Strip Coatings.Rept Submitted Per Requirements of 10CFR50.73(a)(2)(v)(D) | 14 July 1998 | Forwards LER 98-019-00 Re Inoperability of Hydrogen Monitors for Both Units Due to Lack of Environ Qualification of Terminal Strip Coatings.Rept Submitted Per Requirements of 10CFR50.73(a)(2)(v)(D) | Coatings |
05000266/LER-1998-020, Forwards LER 98-020-00 Re Discovery of Group of Cables in Cable Spreading Room Which May Not Meet Licensee Fire Protection Commitments for Safe Shutdown Equipment in That Fire Zone.New Commitments within Rept Indicated in Itali | 30 July 1998 | Forwards LER 98-020-00 Re Discovery of Group of Cables in Cable Spreading Room Which May Not Meet Licensee Fire Protection Commitments for Safe Shutdown Equipment in That Fire Zone.New Commitments within Rept Indicated in Italics | Safe Shutdown |
05000266/LER-1998-021, Forwards LER 98-021-00 Re Discovery That ASME Section XI Inservice Stroke Tests Were Not Performed on Four Valves within Required Time Frame.New Commitments in Rept Are Indicated in Italics | 31 July 1998 | Forwards LER 98-021-00 Re Discovery That ASME Section XI Inservice Stroke Tests Were Not Performed on Four Valves within Required Time Frame.New Commitments in Rept Are Indicated in Italics | Missed surveillance |
05000266/LER-1998-022, Forwards LER 98-022-00 Re Discovery of Procedural Inadequacy Which Alone Has Potential to Prevent Fulfillment of Safety Function of Structures or Sys Needed to Mitigate Consequences of Accident,Per 10CFR50.73(a)(2)(iv) | 13 August 1998 | Forwards LER 98-022-00 Re Discovery of Procedural Inadequacy Which Alone Has Potential to Prevent Fulfillment of Safety Function of Structures or Sys Needed to Mitigate Consequences of Accident,Per 10CFR50.73(a)(2)(iv) | |
05000266/LER-1998-023, Forwards LER 98-023-00,re Identification That Wind Loading Analysis for Circulating Water Pumphouse Did Not Address Roof Uplift.Commitments Made within Rept Indicated in Italics | 17 August 1998 | Forwards LER 98-023-00,re Identification That Wind Loading Analysis for Circulating Water Pumphouse Did Not Address Roof Uplift.Commitments Made within Rept Indicated in Italics | |
05000266/LER-1998-024, Forwards LER 98-024-00 Re Installation of Electrical Jumper During Testing That Unexpectedly Actuated Start Circuitry for Train a Emergency Diesel G01.No New Commitments Made within Ltr | 20 August 1998 | Forwards LER 98-024-00 Re Installation of Electrical Jumper During Testing That Unexpectedly Actuated Start Circuitry for Train a Emergency Diesel G01.No New Commitments Made within Ltr | |
05000266/LER-1998-025, Forwards LER 98-025-00,describing Operation of Control Room Smoke Exhaust Fan W-13C,which Could Prevent Maintaining Positive Pressure in Cr.New Commitments in Rept Indicated in Italics | 27 August 1998 | Forwards LER 98-025-00,describing Operation of Control Room Smoke Exhaust Fan W-13C,which Could Prevent Maintaining Positive Pressure in Cr.New Commitments in Rept Indicated in Italics | |
05000266/LER-1998-026, Forwards LER 98-026-00 Documenting Safety Analysis Weakness & Related Operation That Was Not IAW Intent of Ts.New Commitments in Rept Are Indicated in Italics | 9 October 1998 | Forwards LER 98-026-00 Documenting Safety Analysis Weakness & Related Operation That Was Not IAW Intent of Ts.New Commitments in Rept Are Indicated in Italics | |
05000266/LER-1998-027, Forwards LER 98-027-00,describing Discovery of Deficiency in Surveillance Testing of Logic Matrix for Isolation of non- Essential Svc Water Sys Heat Loads & Discovery That Overlap Between Auxiliary Contacts Not Adequately Verif | 12 November 1998 | Forwards LER 98-027-00,describing Discovery of Deficiency in Surveillance Testing of Logic Matrix for Isolation of non- Essential Svc Water Sys Heat Loads & Discovery That Overlap Between Auxiliary Contacts Not Adequately Verified | |
05000266/LER-1998-028, Forwards LER 98-028-00,describing Discovery That Five 40- Month Section XI Pressure Tests Were Not Performed within Required Time Frame.New Commitments within Rept Are Indicated in Italics | 11 December 1998 | Forwards LER 98-028-00,describing Discovery That Five 40- Month Section XI Pressure Tests Were Not Performed within Required Time Frame.New Commitments within Rept Are Indicated in Italics | Missed surveillance |
05000266/LER-1998-029, Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications | 26 January 1999 | Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications | |
05000266/LER-1998-030, Forwards LER 98-030-00 Re Assumptions for Equipment Necessary to Maintain Hot Safe Shutdown Outside App R Design Basis.New Commitments within Rept Indicated in Italics | 23 December 1998 | Forwards LER 98-030-00 Re Assumptions for Equipment Necessary to Maintain Hot Safe Shutdown Outside App R Design Basis.New Commitments within Rept Indicated in Italics | Safe Shutdown |
05000266/LER-1999-001, Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics i | 8 April 1999 | Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics in Rept | |
05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump | 2 September 1999 | Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump | Safe Shutdown |
05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics | 11 June 1999 | Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics | |
05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics | 19 August 1999 | Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics | Safe Shutdown |
05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics | 30 September 1999 | Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics | Safe Shutdown |
05000266/LER-2007-033, Forwards LER 07-033-00,re Discovery That Redundant Power Cables in AFW Room Do Not Meet App R Separation Criteria & Have Not Been Provided Exemption from Requirement | 30 July 1997 | Forwards LER 07-033-00,re Discovery That Redundant Power Cables in AFW Room Do Not Meet App R Separation Criteria & Have Not Been Provided Exemption from Requirement | |
05000301/LER-1981-002, Forwards Results of Metallographic Insp & Exam of Steam Generator Tube R15C73,as Committed to in LER 81-002/01T-01. Also Forwards Addl Rept on Evaluation of Apr 1981 Eddy Current Insp Results & Eddy Current Insp Maps | 27 May 1981 | Forwards Results of Metallographic Insp & Exam of Steam Generator Tube R15C73,as Committed to in LER 81-002/01T-01. Also Forwards Addl Rept on Evaluation of Apr 1981 Eddy Current Insp Results & Eddy Current Insp Maps | |
05000301/LER-1982-003, Forwards LER 82-003/03L-0 | 8 June 1982 | Forwards LER 82-003/03L-0 | |
05000301/LER-1982-004, Forwards LER 82-004/01T-0 | 15 June 1982 | Forwards LER 82-004/01T-0 | Fuel cladding |
05000301/LER-1982-006, Forwards LER 82-006/03L-0 | 20 August 1982 | Forwards LER 82-006/03L-0 | |
05000301/LER-1982-007, Forwards LER 82-007/03L-0 | 25 October 1982 | Forwards LER 82-007/03L-0 | |