Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000266/LER-1997-035, Forwards LER 97-035-00 Re Discovery of Inadequate Seismic Support for Reactor Coolant Pump Rotor Stand.Ler Being Submitted Beyond 30-day Requirement Due to Administrative Process Control Weakness15 August 1997Forwards LER 97-035-00 Re Discovery of Inadequate Seismic Support for Reactor Coolant Pump Rotor Stand.Ler Being Submitted Beyond 30-day Requirement Due to Administrative Process Control Weakness
05000266/LER-1997-036, Forwards LER 97-036-00,describing Discovery That Coincidental,Random Failure of Particular DC Power Supply During Seismic or Tornado Event Could Prevent Timely Stoppage of Auxiliary Feedwater Pumps25 September 1997Forwards LER 97-036-00,describing Discovery That Coincidental,Random Failure of Particular DC Power Supply During Seismic or Tornado Event Could Prevent Timely Stoppage of Auxiliary Feedwater PumpsEarthquake
05000266/LER-1997-037, Forwards LER 97-037-00 Re Potential Failure of EDG Load Sequence.New Commitments within Rept Indicated in Italics30 September 1997Forwards LER 97-037-00 Re Potential Failure of EDG Load Sequence.New Commitments within Rept Indicated in ItalicsUnanalyzed Condition
05000266/LER-1997-038, Forwards LER 97-038-00 Re Inoperability of Standby Emergency Power Supply for Approx 15 Days Due to Failure That Occurred When EDG G-03 Was Shut Down at Completion of Testing24 October 1997Forwards LER 97-038-00 Re Inoperability of Standby Emergency Power Supply for Approx 15 Days Due to Failure That Occurred When EDG G-03 Was Shut Down at Completion of Testing
05000266/LER-1997-039, Forwards LER 97-039-00 Re RHR Loop Inoperable,Due to Inoperable CCW Pump.New Commitments within Rept Indicated in Italics14 November 1997Forwards LER 97-039-00 Re RHR Loop Inoperable,Due to Inoperable CCW Pump.New Commitments within Rept Indicated in Italics
05000266/LER-1997-040, Forwards LER 97-040-01 Which Documents Event That Occurred at Point Beach Nuclear Plant,Unit 1.Commitments Made within Ltr,Encl21 November 1997Forwards LER 97-040-01 Which Documents Event That Occurred at Point Beach Nuclear Plant,Unit 1.Commitments Made within Ltr,EnclUnanalyzed Condition
05000266/LER-1997-041, Forwards LER 97-041-00 Which Describes Discovery of Potential Common Mode Failure in Control Circuits of AFW Sys at Pbnp,Unit 1.Commitments Made within Ltr,Encl24 November 1997Forwards LER 97-041-00 Which Describes Discovery of Potential Common Mode Failure in Control Circuits of AFW Sys at Pbnp,Unit 1.Commitments Made within Ltr,Encl
05000266/LER-1997-042, Forwards LER 97-042-00 Which Describes Discovery That Upper Containment Personnel Air Lock Interlock Had Been Inoperable & Required Surveillance Had Not Been Completed. New Commitments within Rept,Indicated in Italics1 December 1997Forwards LER 97-042-00 Which Describes Discovery That Upper Containment Personnel Air Lock Interlock Had Been Inoperable & Required Surveillance Had Not Been Completed. New Commitments within Rept,Indicated in Italics
05000266/LER-1997-043, Forwards LER 97-043-01,re Discovery That TS Surveillance of Reactor Trip Sys Interlocks Were Not Adequate. Supplemental Info Is Provided at End of Rept.Previous Commitments Made within Rept Also Encl16 March 1998Forwards LER 97-043-01,re Discovery That TS Surveillance of Reactor Trip Sys Interlocks Were Not Adequate. Supplemental Info Is Provided at End of Rept.Previous Commitments Made within Rept Also Encl
05000266/LER-1997-044, Forwards LER 97-044-00 Which Describes Discovery That Inservice Test Procedure Used Dedicated Operator to Provide Operabiliity of Containment Spray Additive Sys While Both Redundant Trains Were Isolated.No New Commitments Liste15 January 1998Forwards LER 97-044-00 Which Describes Discovery That Inservice Test Procedure Used Dedicated Operator to Provide Operabiliity of Containment Spray Additive Sys While Both Redundant Trains Were Isolated.No New Commitments Listed
05000266/LER-1998-002, Forwards LER 98-002-00,re High Voltage Station Auxiliary Transformer Failure Due to Ground in Low Voltage Side Bus Duct.New Commitments within Rept Indicated in Italics Per 10CFR50.73(a)(2)(i)(B) Requirements9 February 1998Forwards LER 98-002-00,re High Voltage Station Auxiliary Transformer Failure Due to Ground in Low Voltage Side Bus Duct.New Commitments within Rept Indicated in Italics Per 10CFR50.73(a)(2)(i)(B) Requirements
05000266/LER-1998-003, Forwards LER 98-003-00,describing Discovery That Flow Meters Used to Set SW Flow Through Accident Fan Cooler Heat Exchangers Resulted in Potentially Less Flow than Assumed in Analysis for Operability of Motors During Accident9 February 1998Forwards LER 98-003-00,describing Discovery That Flow Meters Used to Set SW Flow Through Accident Fan Cooler Heat Exchangers Resulted in Potentially Less Flow than Assumed in Analysis for Operability of Motors During Accident
05000266/LER-1998-004, Forwards LER 98-004-00,re Discovery That Reactor Coolant Pump Lube Oil Collection Sys Did Not Fully Comply W/Prescriptive Requirements of 10CFR50 App R Section III.0. Commitments Made within Ltr,Encl13 February 1998Forwards LER 98-004-00,re Discovery That Reactor Coolant Pump Lube Oil Collection Sys Did Not Fully Comply W/Prescriptive Requirements of 10CFR50 App R Section III.0. Commitments Made within Ltr,Encl
05000266/LER-1998-005, Forwards LER 98-005-00 Re Discovery That Two Control Rod Exercise Tests Has Not Been Conducted at two-week Interval Required by Ts.New Commitments Made within Rept Identified in Italics18 February 1998Forwards LER 98-005-00 Re Discovery That Two Control Rod Exercise Tests Has Not Been Conducted at two-week Interval Required by Ts.New Commitments Made within Rept Identified in Italics
05000266/LER-1998-006, Forwards LER 98-006-00 Re Unanticipated Partial Svc Water Sys Isolation During Special Test.New Commitments within Rept Indicated in Italics20 February 1998Forwards LER 98-006-00 Re Unanticipated Partial Svc Water Sys Isolation During Special Test.New Commitments within Rept Indicated in Italics
05000266/LER-1998-007, Forwards LER 98-007-00 Re Event or Condition That Resulted in Condition of Nuclear Plant,Including Principal Safety Barriers,Being Seriously Degraded.Mfg Deficiency Previously Reported to Commission Via 10CFR21 Notification on20 February 1998Forwards LER 98-007-00 Re Event or Condition That Resulted in Condition of Nuclear Plant,Including Principal Safety Barriers,Being Seriously Degraded.Mfg Deficiency Previously Reported to Commission Via 10CFR21 Notification on 980112
05000266/LER-1998-008, Forwards LER 98-008-00 Re EDG Air Start Motor Solenoid Valves Found W/Springs Not in Accordance W/Design.New Commitments Established within Rept Presented in Italics5 March 1998Forwards LER 98-008-00 Re EDG Air Start Motor Solenoid Valves Found W/Springs Not in Accordance W/Design.New Commitments Established within Rept Presented in Italics
05000266/LER-1998-009, Forwards LER 98-009-00,describing Discovery of Undervoltage Relay Contacts in Safeguards Sequence Circuitry That Were Not Tested IAW Requirements of TS 15.4.6.A.2 & Table 15.4.1-1,Item 13.Commitments Established within Rept4 March 1998Forwards LER 98-009-00,describing Discovery of Undervoltage Relay Contacts in Safeguards Sequence Circuitry That Were Not Tested IAW Requirements of TS 15.4.6.A.2 & Table 15.4.1-1,Item 13.Commitments Established within Rept
05000266/LER-1998-010, Forwards LER 98-010-01,re Containment Spray Channel Functional Testing.Commitments Made within Ltr,Encl3 August 1998Forwards LER 98-010-01,re Containment Spray Channel Functional Testing.Commitments Made within Ltr,Encl
05000266/LER-1998-011, Forwards LER 98-011-00 Re Missed Tech Specs Surveillance of Radiation Monitor Prior to Discharge.New Commitments within Rept Indicated in Italics22 April 1998Forwards LER 98-011-00 Re Missed Tech Specs Surveillance of Radiation Monitor Prior to Discharge.New Commitments within Rept Indicated in Italics
05000266/LER-1998-012, Forwards LER 98-012-00 Re Discovery That twenty-seven Containment Penetrations Were Not Pressure Tested IAW ASME Section XI Requirements within Required Time Frame29 April 1998Forwards LER 98-012-00 Re Discovery That twenty-seven Containment Penetrations Were Not Pressure Tested IAW ASME Section XI Requirements within Required Time Frame
05000266/LER-1998-013, Forwards LER 98-013-00,describing Discovery That Root Valves for Containment Spray Pump Discharge Pressure Indicators Were Not Being Maintained in Normally Closed Configuration. New Commitments within Rept Are Indicated by Ital16 May 1998Forwards LER 98-013-00,describing Discovery That Root Valves for Containment Spray Pump Discharge Pressure Indicators Were Not Being Maintained in Normally Closed Configuration. New Commitments within Rept Are Indicated by Italics
05000266/LER-1998-014, Forwards LER 98-014-00,describing ESF (Swp) That Started Automatically During Testing of EDG Output Breaker17 May 1998Forwards LER 98-014-00,describing ESF (Swp) That Started Automatically During Testing of EDG Output Breaker
05000266/LER-1998-015, Forwards LER 98-015-00,re Containment Fan Cooler Test Results Outside Acceptance Criteria at Plant,Unit 120 May 1998Forwards LER 98-015-00,re Containment Fan Cooler Test Results Outside Acceptance Criteria at Plant,Unit 1
05000266/LER-1998-016, Forwards LER 98-016-00,which Describes Evaluation of Surveillance Testing of Refueling Sys Interlocks & Safety Features.No New Commitments Made within Ltr26 May 1998Forwards LER 98-016-00,which Describes Evaluation of Surveillance Testing of Refueling Sys Interlocks & Safety Features.No New Commitments Made within LtrMissed surveillance
05000266/LER-1998-017, Forwards LER 98-017-00 Re Discovery of Weld Deficiencies on Piping Support for B Loop RTD Manifold Bypass Piping.Rept Provided IAW 10CFR50.73(a)(2)(ii)(B).No New Commitments Are Contained in Rept11 June 1998Forwards LER 98-017-00 Re Discovery of Weld Deficiencies on Piping Support for B Loop RTD Manifold Bypass Piping.Rept Provided IAW 10CFR50.73(a)(2)(ii)(B).No New Commitments Are Contained in Rept
05000266/LER-1998-018, Forwards LER 98-018-00,describing Discovery of Deficiency in App J Containment Pressure Testing Program for Vent Valves Associated W/Containment Electrical Penetrations.New Commitments within Rept Indicated in Italics29 June 1998Forwards LER 98-018-00,describing Discovery of Deficiency in App J Containment Pressure Testing Program for Vent Valves Associated W/Containment Electrical Penetrations.New Commitments within Rept Indicated in ItalicsMissed surveillance
05000266/LER-1998-019, Forwards LER 98-019-00 Re Inoperability of Hydrogen Monitors for Both Units Due to Lack of Environ Qualification of Terminal Strip Coatings.Rept Submitted Per Requirements of 10CFR50.73(a)(2)(v)(D)14 July 1998Forwards LER 98-019-00 Re Inoperability of Hydrogen Monitors for Both Units Due to Lack of Environ Qualification of Terminal Strip Coatings.Rept Submitted Per Requirements of 10CFR50.73(a)(2)(v)(D)Coatings
05000266/LER-1998-020, Forwards LER 98-020-00 Re Discovery of Group of Cables in Cable Spreading Room Which May Not Meet Licensee Fire Protection Commitments for Safe Shutdown Equipment in That Fire Zone.New Commitments within Rept Indicated in Itali30 July 1998Forwards LER 98-020-00 Re Discovery of Group of Cables in Cable Spreading Room Which May Not Meet Licensee Fire Protection Commitments for Safe Shutdown Equipment in That Fire Zone.New Commitments within Rept Indicated in ItalicsSafe Shutdown
05000266/LER-1998-021, Forwards LER 98-021-00 Re Discovery That ASME Section XI Inservice Stroke Tests Were Not Performed on Four Valves within Required Time Frame.New Commitments in Rept Are Indicated in Italics31 July 1998Forwards LER 98-021-00 Re Discovery That ASME Section XI Inservice Stroke Tests Were Not Performed on Four Valves within Required Time Frame.New Commitments in Rept Are Indicated in ItalicsMissed surveillance
05000266/LER-1998-022, Forwards LER 98-022-00 Re Discovery of Procedural Inadequacy Which Alone Has Potential to Prevent Fulfillment of Safety Function of Structures or Sys Needed to Mitigate Consequences of Accident,Per 10CFR50.73(a)(2)(iv)13 August 1998Forwards LER 98-022-00 Re Discovery of Procedural Inadequacy Which Alone Has Potential to Prevent Fulfillment of Safety Function of Structures or Sys Needed to Mitigate Consequences of Accident,Per 10CFR50.73(a)(2)(iv)
05000266/LER-1998-023, Forwards LER 98-023-00,re Identification That Wind Loading Analysis for Circulating Water Pumphouse Did Not Address Roof Uplift.Commitments Made within Rept Indicated in Italics17 August 1998Forwards LER 98-023-00,re Identification That Wind Loading Analysis for Circulating Water Pumphouse Did Not Address Roof Uplift.Commitments Made within Rept Indicated in Italics
05000266/LER-1998-024, Forwards LER 98-024-00 Re Installation of Electrical Jumper During Testing That Unexpectedly Actuated Start Circuitry for Train a Emergency Diesel G01.No New Commitments Made within Ltr20 August 1998Forwards LER 98-024-00 Re Installation of Electrical Jumper During Testing That Unexpectedly Actuated Start Circuitry for Train a Emergency Diesel G01.No New Commitments Made within Ltr
05000266/LER-1998-025, Forwards LER 98-025-00,describing Operation of Control Room Smoke Exhaust Fan W-13C,which Could Prevent Maintaining Positive Pressure in Cr.New Commitments in Rept Indicated in Italics27 August 1998Forwards LER 98-025-00,describing Operation of Control Room Smoke Exhaust Fan W-13C,which Could Prevent Maintaining Positive Pressure in Cr.New Commitments in Rept Indicated in Italics
05000266/LER-1998-026, Forwards LER 98-026-00 Documenting Safety Analysis Weakness & Related Operation That Was Not IAW Intent of Ts.New Commitments in Rept Are Indicated in Italics9 October 1998Forwards LER 98-026-00 Documenting Safety Analysis Weakness & Related Operation That Was Not IAW Intent of Ts.New Commitments in Rept Are Indicated in Italics
05000266/LER-1998-027, Forwards LER 98-027-00,describing Discovery of Deficiency in Surveillance Testing of Logic Matrix for Isolation of non- Essential Svc Water Sys Heat Loads & Discovery That Overlap Between Auxiliary Contacts Not Adequately Verif12 November 1998Forwards LER 98-027-00,describing Discovery of Deficiency in Surveillance Testing of Logic Matrix for Isolation of non- Essential Svc Water Sys Heat Loads & Discovery That Overlap Between Auxiliary Contacts Not Adequately Verified
05000266/LER-1998-028, Forwards LER 98-028-00,describing Discovery That Five 40- Month Section XI Pressure Tests Were Not Performed within Required Time Frame.New Commitments within Rept Are Indicated in Italics11 December 1998Forwards LER 98-028-00,describing Discovery That Five 40- Month Section XI Pressure Tests Were Not Performed within Required Time Frame.New Commitments within Rept Are Indicated in ItalicsMissed surveillance
05000266/LER-1998-029, Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications26 January 1999Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications
05000266/LER-1998-030, Forwards LER 98-030-00 Re Assumptions for Equipment Necessary to Maintain Hot Safe Shutdown Outside App R Design Basis.New Commitments within Rept Indicated in Italics23 December 1998Forwards LER 98-030-00 Re Assumptions for Equipment Necessary to Maintain Hot Safe Shutdown Outside App R Design Basis.New Commitments within Rept Indicated in ItalicsSafe Shutdown
05000266/LER-1999-001, Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics i8 April 1999Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics in Rept
05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump2 September 1999Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer PumpSafe Shutdown
05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics11 June 1999Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics
05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics19 August 1999Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in ItalicsSafe Shutdown
05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics30 September 1999Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in ItalicsSafe Shutdown
05000266/LER-2007-033, Forwards LER 07-033-00,re Discovery That Redundant Power Cables in AFW Room Do Not Meet App R Separation Criteria & Have Not Been Provided Exemption from Requirement30 July 1997Forwards LER 07-033-00,re Discovery That Redundant Power Cables in AFW Room Do Not Meet App R Separation Criteria & Have Not Been Provided Exemption from Requirement
05000301/LER-1981-002, Forwards Results of Metallographic Insp & Exam of Steam Generator Tube R15C73,as Committed to in LER 81-002/01T-01. Also Forwards Addl Rept on Evaluation of Apr 1981 Eddy Current Insp Results & Eddy Current Insp Maps27 May 1981Forwards Results of Metallographic Insp & Exam of Steam Generator Tube R15C73,as Committed to in LER 81-002/01T-01. Also Forwards Addl Rept on Evaluation of Apr 1981 Eddy Current Insp Results & Eddy Current Insp Maps
05000301/LER-1982-003, Forwards LER 82-003/03L-08 June 1982Forwards LER 82-003/03L-0
05000301/LER-1982-004, Forwards LER 82-004/01T-015 June 1982Forwards LER 82-004/01T-0Fuel cladding
05000301/LER-1982-006, Forwards LER 82-006/03L-020 August 1982Forwards LER 82-006/03L-0
05000301/LER-1982-007, Forwards LER 82-007/03L-025 October 1982Forwards LER 82-007/03L-0