Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
DD-85-20, Informs That Time Provided by NRC Regulations to Review Director'S Decision DD-85-20 Expired.Commission Declined Review.Decision Became Final Agency Action on 860207.Served on 860207 | 10 February 1986 | Informs That Time Provided by NRC Regulations to Review Director'S Decision DD-85-20 Expired.Commission Declined Review.Decision Became Final Agency Action on 860207.Served on 860207 | |
DD-97-06, Provides NRC Staff W/Reply to Issues Raised in Re Director Decision DD-97-06 Issued on 970318,in Response to Petition Filed,Per 10CFR2.206 | 29 July 1997 | Provides NRC Staff W/Reply to Issues Raised in Re Director Decision DD-97-06 Issued on 970318,in Response to Petition Filed,Per 10CFR2.206 | |
ELV-00013, Forwards Revs to Physical Security & Contingency Plan,Per NRC .Revs Withheld (Ref 10CFR73.21 & 2.790) | 21 November 1988 | Forwards Revs to Physical Security & Contingency Plan,Per NRC .Revs Withheld (Ref 10CFR73.21 & 2.790) | |
ELV-00015, Forwards Revised Response to Violations Noted in Insp Rept 50-424/88-29.Encl Withheld (Ref 10CFR73.21 & 2.790) | 23 November 1988 | Forwards Revised Response to Violations Noted in Insp Rept 50-424/88-29.Encl Withheld (Ref 10CFR73.21 & 2.790) | |
ELV-00036, Forwards Fifth Suppl to Summary Rept of Plant Startup Test Program.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal | 30 November 1988 | Forwards Fifth Suppl to Summary Rept of Plant Startup Test Program.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal | |
ELV-00062, Responds to NRC Bulletin 88-003 Requesting That Insps Be Performed for All GE latching-type Hfa Relays in Class 1E Applications.Fourteen GE 12HFA54E187H Relays Inspected on 881108 for Unit 1 & on 880606 for Unit 2 | 7 December 1988 | Responds to NRC Bulletin 88-003 Requesting That Insps Be Performed for All GE latching-type Hfa Relays in Class 1E Applications.Fourteen GE 12HFA54E187H Relays Inspected on 881108 for Unit 1 & on 880606 for Unit 2 | |
ELV-00254, Forwards Personnel Resumes for Review by Commissioner Rogers.W/O Encls | 9 February 1989 | Forwards Personnel Resumes for Review by Commissioner Rogers.W/O Encls | |
ELV-00272, Forwards Cycle 1 Radial Peaking Factor Limit Rept,Per Tech Spec 6.8.1.6 & Elevation Dependent Peaking Factor Versus Core Height Graph | 3 April 1989 | Forwards Cycle 1 Radial Peaking Factor Limit Rept,Per Tech Spec 6.8.1.6 & Elevation Dependent Peaking Factor Versus Core Height Graph | |
ELV-00273, Forwards Sixth Suppl to Summary Rept of Startup Test Program.Initial Summary Rept Submitted on 870831.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal | 28 February 1989 | Forwards Sixth Suppl to Summary Rept of Startup Test Program.Initial Summary Rept Submitted on 870831.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal | |
ELV-00275, Forwards Response to Violations Noted in Insp Rept 50-424/89-06.Response Withheld | 28 February 1989 | Forwards Response to Violations Noted in Insp Rept 50-424/89-06.Response Withheld | |
ELV-00294, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Per 10CFR50,App J | 28 February 1989 | Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Per 10CFR50,App J | |
ELV-00304, Forwards Revised Response to Violation Noted in Insp Rept 50-424/88-56 on 881029-1216.Corrective Actions:Performance of post-refueling Outage Containment Insp & Evaluation Upgraded & Operations Personnel Briefed on Subj Notice | 7 March 1989 | Forwards Revised Response to Violation Noted in Insp Rept 50-424/88-56 on 881029-1216.Corrective Actions:Performance of post-refueling Outage Containment Insp & Evaluation Upgraded & Operations Personnel Briefed on Subj Notice | |
ELV-00310, Responds to Violations Noted in Insp Rept 50-424/88-61. Corrective Actions:Shift Operators Counseled on Failure to Follow Procedural Requirements of Procedure 10001-C | 7 March 1989 | Responds to Violations Noted in Insp Rept 50-424/88-61. Corrective Actions:Shift Operators Counseled on Failure to Follow Procedural Requirements of Procedure 10001-C | |
ELV-00311, Informs of Completion of 1,000 H Availability Test of Spds. Several Radiation Monitors out-of-svc During Part of Test Period or for Entire Test Period.W/Monitors Excluded from Test Criteria,Availability of 99.936% Achieved | 10 March 1989 | Informs of Completion of 1,000 H Availability Test of Spds. Several Radiation Monitors out-of-svc During Part of Test Period or for Entire Test Period.W/Monitors Excluded from Test Criteria,Availability of 99.936% Achieved | |
ELV-00330, Forwards Suppl to Rev 11 to Emergency Plan.Suppl Corrects Administrative Errors | 14 March 1989 | Forwards Suppl to Rev 11 to Emergency Plan.Suppl Corrects Administrative Errors | |
ELV-00332, Forwards Response to Re Request for Certain Existing Plant Documents to Be Utilized in Development of risk-based Insp Guide.W/O Attachments | 14 March 1989 | Forwards Response to Re Request for Certain Existing Plant Documents to Be Utilized in Development of risk-based Insp Guide.W/O Attachments | |
ELV-00336, Requests NRC Comments Re Reactor Trip Breaker Maint Frequency by 890421.Based on Westinghouse Recommendations, Maint Interval of 500 Operations,Or 18 Months,Whichever Comes First,More Appropriate for Group a Maint | 28 March 1989 | Requests NRC Comments Re Reactor Trip Breaker Maint Frequency by 890421.Based on Westinghouse Recommendations, Maint Interval of 500 Operations,Or 18 Months,Whichever Comes First,More Appropriate for Group a Maint | |
ELV-00340, Forwards Revised Monthly Operating Rept for Jan 1989 & Monthly Operating Rept for Feb 1989 for Vogtle,Units 1 & 2 | 15 March 1989 | Forwards Revised Monthly Operating Rept for Jan 1989 & Monthly Operating Rept for Feb 1989 for Vogtle,Units 1 & 2 | |
ELV-00342, Forwards Executed Amend 4 to Indemnity Agreement B-107 | 16 March 1989 | Forwards Executed Amend 4 to Indemnity Agreement B-107 | |
ELV-00358, Completes Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Instrumentation for Unisolable Sections of Piping to Detect Adverse Temp Distributions Installed & Data Collection Initiated | 27 March 1989 | Completes Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Instrumentation for Unisolable Sections of Piping to Detect Adverse Temp Distributions Installed & Data Collection Initiated | |
ELV-00365, Forwards Comments on Sser 8.Spent Fuel Storage Racks Will Have Boraflex on All Sides,Including Sides Adjacent to Fuel Pool Walls | 16 March 1989 | Forwards Comments on Sser 8.Spent Fuel Storage Racks Will Have Boraflex on All Sides,Including Sides Adjacent to Fuel Pool Walls | |
ELV-00373, Provides Rept of Present Level of Insurance & Sources of Insurance for Plant,Per 10CFR50.54(W)(2) | 23 March 1989 | Provides Rept of Present Level of Insurance & Sources of Insurance for Plant,Per 10CFR50.54(W)(2) | |
ELV-00376, Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Util Identified 759 Molded Case Circuit Breakers Being Maintained as safety-related Spares in Unit 1 Warehouse as of 881205 | 31 March 1989 | Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Util Identified 759 Molded Case Circuit Breakers Being Maintained as safety-related Spares in Unit 1 Warehouse as of 881205 | |
ELV-00378, Responds to Violations Noted in Insp Rept 50-425/89-03. Corrective Actions:Controls in Place & Implemented to Identify,Track & Review Deficiencies for Reportability | 28 March 1989 | Responds to Violations Noted in Insp Rept 50-425/89-03. Corrective Actions:Controls in Place & Implemented to Identify,Track & Review Deficiencies for Reportability | |
ELV-00432, Responds to Station Blackout Rule.Blackout Start Procedure & Restoration of Offsite Ac Power for Shutdown Added to Existing Procedures for Coping W/Station Blackout.Mods Required to Obtain 4 H Coping Duration Listed | 12 April 1989 | Responds to Station Blackout Rule.Blackout Start Procedure & Restoration of Offsite Ac Power for Shutdown Added to Existing Procedures for Coping W/Station Blackout.Mods Required to Obtain 4 H Coping Duration Listed | Safe Shutdown |
ELV-00436, Forwards Response to Violations Noted in Insp Rept 50-424/89-09 on 890202-03.Response Withheld | 7 April 1989 | Forwards Response to Violations Noted in Insp Rept 50-424/89-09 on 890202-03.Response Withheld | |
ELV-00449, Forwards Amend 12 to Physical Security Plan.Amend Withheld (Ref 10CFR73.21) | 28 April 1989 | Forwards Amend 12 to Physical Security Plan.Amend Withheld (Ref 10CFR73.21) | |
ELV-00458, Forwards Amend 5 to Indemnity Agreement B-107 | 21 April 1989 | Forwards Amend 5 to Indemnity Agreement B-107 | |
ELV-00473, Submits Change to Initial Startup Test Program Described in Chapter 14 of Fsar.Change Adds Footnote to Test Abstract for Containment,Auxiliary,Control & Fuel Handling Bldgs Drain Sys | 1 May 1989 | Submits Change to Initial Startup Test Program Described in Chapter 14 of Fsar.Change Adds Footnote to Test Abstract for Containment,Auxiliary,Control & Fuel Handling Bldgs Drain Sys | Boric Acid |
ELV-00475, Forwards Vogtle Unit 1 Annual Rept,Part 2 | 1 May 1989 | Forwards Vogtle Unit 1 Annual Rept,Part 2 | |
ELV-00476, Requests Extension for Annual Simulator Test Until mid-Jul 1989.Proposes Extension of Deadline for First Annual Operability Test to 900228,to Allow Testing to Be Performed After New Models Are Operational & Allow Acceptance Test | 28 April 1989 | Requests Extension for Annual Simulator Test Until mid-Jul 1989.Proposes Extension of Deadline for First Annual Operability Test to 900228,to Allow Testing to Be Performed After New Models Are Operational & Allow Acceptance Test | |
ELV-00478, Forwards Objectives & Scope of Annual Emergency Preparedness Exercise Scheduled for 890726.Exercise Will Not Involve Evaluated Participation by State or County Agencies | 8 May 1989 | Forwards Objectives & Scope of Annual Emergency Preparedness Exercise Scheduled for 890726.Exercise Will Not Involve Evaluated Participation by State or County Agencies | |
ELV-00484, Informs of Change in Distribution for NRC Correspondence Due to Recent Completion of Const of Unit 2 & Relocation of Nuclear Operations Corporate Ofc to Birmingham,Al.Revised List Encl | 1 May 1989 | Informs of Change in Distribution for NRC Correspondence Due to Recent Completion of Const of Unit 2 & Relocation of Nuclear Operations Corporate Ofc to Birmingham,Al.Revised List Encl | |
ELV-00488, Informs of Two Minor Errors to Be Corrected in NRC Hearing for Plant Full Power License.Organization Described on Figures 13.1.1-1 & 13.1.1-2 of Plant FSAR | 1 May 1989 | Informs of Two Minor Errors to Be Corrected in NRC Hearing for Plant Full Power License.Organization Described on Figures 13.1.1-1 & 13.1.1-2 of Plant FSAR | |
ELV-00499, Submits Three Changes to Description of Initial Startup Test Program in Chapter 14 of Fsar.Changes Add Footnote to Test Abstract for Boron Thermal Regeneration Sys & Liquid Waste Processing Sys | 11 May 1989 | Submits Three Changes to Description of Initial Startup Test Program in Chapter 14 of Fsar.Changes Add Footnote to Test Abstract for Boron Thermal Regeneration Sys & Liquid Waste Processing Sys | Hydrostatic |
ELV-00503, Forwards Status of Control Room Design Review,Human Engineering Discrepancies & Similarity Review Remaining Issues. All Confirmatory Items Addressed Except Annunicator Nuisance Alarms | 9 May 1989 | Forwards Status of Control Room Design Review,Human Engineering Discrepancies & Similarity Review Remaining Issues. All Confirmatory Items Addressed Except Annunicator Nuisance Alarms | |
ELV-00512, Forwards Proprietary Rev 1 to WCAP-11312 & Nonproprietary Rev 1 to WCAP-11966, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/Surveillance.... Proprietary Rept Withheld (Ref 10CFR2.790) | 25 July 1989 | Forwards Proprietary Rev 1 to WCAP-11312 & Nonproprietary Rev 1 to WCAP-11966, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/Surveillance.... Proprietary Rept Withheld (Ref 10CFR2.790) | |
ELV-00515, Responds to Violations Noted in Insp Repts 50-424/89-10 & 50-425/89-12 on 890208-0317.Corrective Actions:Qc Inspector Counseled Re Failure to Comply W/Procedure 85301-C Requirements & Personnel Appraised of Problem | 18 May 1989 | Responds to Violations Noted in Insp Repts 50-424/89-10 & 50-425/89-12 on 890208-0317.Corrective Actions:Qc Inspector Counseled Re Failure to Comply W/Procedure 85301-C Requirements & Personnel Appraised of Problem | |
ELV-00518, Requests Concurrence W/Proposed Change to Operations QA Program,Changing Size of Site Safety Audit & Engineering Review Organization Technical Personnel to eight.Marked-up FSAR Pages Showing Proposed Change Encl | 18 May 1989 | Requests Concurrence W/Proposed Change to Operations QA Program,Changing Size of Site Safety Audit & Engineering Review Organization Technical Personnel to eight.Marked-up FSAR Pages Showing Proposed Change Encl | |
ELV-00531, Advises That Date for Submittal of Reactor Vessel Level Instrumentation Sys Implementation Rept Postponed.Completed Implementation Rept Will Be Submitted by 890615 | 18 May 1989 | Advises That Date for Submittal of Reactor Vessel Level Instrumentation Sys Implementation Rept Postponed.Completed Implementation Rept Will Be Submitted by 890615 | |
ELV-00594, Provides Addl Info Re Proposed Changes to QA Program,Per NRC Request.Program of Audits Required by Tech Specs & FSAR Not Being Changed by Reduction in Personnel | 8 June 1989 | Provides Addl Info Re Proposed Changes to QA Program,Per NRC Request.Program of Audits Required by Tech Specs & FSAR Not Being Changed by Reduction in Personnel | |
ELV-00599, Forwards Implementation Rept on Reactor Vessel Level Instrumentation Sys,Per NUREG-0737,Item II.F.2 & Sser 1 | 8 June 1989 | Forwards Implementation Rept on Reactor Vessel Level Instrumentation Sys,Per NUREG-0737,Item II.F.2 & Sser 1 | |
ELV-00609, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-424/89-13 on 890327-31.Corrective Actions:Rev to Procedure 00101-C, Drawing Control Completed to Include Distribution of Advanced Copies of as-built Notices | 14 June 1989 | Responds to NRC Ltr Re Violations Noted in Insp Rept 50-424/89-13 on 890327-31.Corrective Actions:Rev to Procedure 00101-C, Drawing Control Completed to Include Distribution of Advanced Copies of as-built Notices | |
ELV-00610, Requests Amend to Util 880826 Exemption Request to Allow GMR-I Canisters to Be Stored in Class C Storage Environ. Exemption Should Be Granted by 900115 | 28 September 1989 | Requests Amend to Util 880826 Exemption Request to Allow GMR-I Canisters to Be Stored in Class C Storage Environ. Exemption Should Be Granted by 900115 | Exemption Request |
ELV-00615, Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Util Determined That No Tube Plugs Identified as Susceptible to Primary Water Stress Corrosion Cracking Installed in Steam Generators | 16 June 1989 | Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Util Determined That No Tube Plugs Identified as Susceptible to Primary Water Stress Corrosion Cracking Installed in Steam Generators | |
ELV-00634, Responds to Generic Ltr 89-08 Re Erosion/Corrosion Induced Pipe Wall Thinning.Erosion/Corrosion Monitoring Program Implemented for Unit 1 & Will Be Developed for Unit 2.Insps for Unit 2 Will Be Performed During First Refueling Outage | 11 July 1989 | Responds to Generic Ltr 89-08 Re Erosion/Corrosion Induced Pipe Wall Thinning.Erosion/Corrosion Monitoring Program Implemented for Unit 1 & Will Be Developed for Unit 2.Insps for Unit 2 Will Be Performed During First Refueling Outage | |
ELV-00650, Discusses Proposed Mods to Settlement Monitoring Program. Program Includes Specific Provisions for Reading of Settlement Markers & for Engineering Evaluation of Settlement data.W/45 Oversize Drawings | 23 June 1989 | Discusses Proposed Mods to Settlement Monitoring Program. Program Includes Specific Provisions for Reading of Settlement Markers & for Engineering Evaluation of Settlement data.W/45 Oversize Drawings | |
ELV-00659, Responds to Generic Ltr 89-06, SPDS & NUREG-1342 Re Industry Implementation of Spds.Util Commits to Maintain SPDS Supporting Documentation for 3 Yrs,Including Completed Checklist & Photographs of SPDS Implementation | 5 July 1989 | Responds to Generic Ltr 89-06, SPDS & NUREG-1342 Re Industry Implementation of Spds.Util Commits to Maintain SPDS Supporting Documentation for 3 Yrs,Including Completed Checklist & Photographs of SPDS Implementation | |
ELV-00665, Forwards Response to Violations Noted in Insp Rept 50-434/88-53.Response Withheld (Ref 10CFR2.790) | 29 June 1989 | Forwards Response to Violations Noted in Insp Rept 50-434/88-53.Response Withheld (Ref 10CFR2.790) | |
ELV-00696, Submits Supplemental Info Re Rev to Tech Spec 5.3.1.Rev Necessary in Order That Higher Enrichment Fuel May Be Used for Plant,Starting W/Cycle 3 | 17 July 1989 | Submits Supplemental Info Re Rev to Tech Spec 5.3.1.Rev Necessary in Order That Higher Enrichment Fuel May Be Used for Plant,Starting W/Cycle 3 |