Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
DD-85-20, Informs That Time Provided by NRC Regulations to Review Director'S Decision DD-85-20 Expired.Commission Declined Review.Decision Became Final Agency Action on 860207.Served on 86020710 February 1986Informs That Time Provided by NRC Regulations to Review Director'S Decision DD-85-20 Expired.Commission Declined Review.Decision Became Final Agency Action on 860207.Served on 860207
DD-97-06, Provides NRC Staff W/Reply to Issues Raised in Re Director Decision DD-97-06 Issued on 970318,in Response to Petition Filed,Per 10CFR2.20629 July 1997Provides NRC Staff W/Reply to Issues Raised in Re Director Decision DD-97-06 Issued on 970318,in Response to Petition Filed,Per 10CFR2.206
ELV-00013, Forwards Revs to Physical Security & Contingency Plan,Per NRC .Revs Withheld (Ref 10CFR73.21 & 2.790)21 November 1988Forwards Revs to Physical Security & Contingency Plan,Per NRC .Revs Withheld (Ref 10CFR73.21 & 2.790)
ELV-00015, Forwards Revised Response to Violations Noted in Insp Rept 50-424/88-29.Encl Withheld (Ref 10CFR73.21 & 2.790)23 November 1988Forwards Revised Response to Violations Noted in Insp Rept 50-424/88-29.Encl Withheld (Ref 10CFR73.21 & 2.790)
ELV-00036, Forwards Fifth Suppl to Summary Rept of Plant Startup Test Program.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal30 November 1988Forwards Fifth Suppl to Summary Rept of Plant Startup Test Program.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal
ELV-00062, Responds to NRC Bulletin 88-003 Requesting That Insps Be Performed for All GE latching-type Hfa Relays in Class 1E Applications.Fourteen GE 12HFA54E187H Relays Inspected on 881108 for Unit 1 & on 880606 for Unit 27 December 1988Responds to NRC Bulletin 88-003 Requesting That Insps Be Performed for All GE latching-type Hfa Relays in Class 1E Applications.Fourteen GE 12HFA54E187H Relays Inspected on 881108 for Unit 1 & on 880606 for Unit 2
ELV-00254, Forwards Personnel Resumes for Review by Commissioner Rogers.W/O Encls9 February 1989Forwards Personnel Resumes for Review by Commissioner Rogers.W/O Encls
ELV-00272, Forwards Cycle 1 Radial Peaking Factor Limit Rept,Per Tech Spec 6.8.1.6 & Elevation Dependent Peaking Factor Versus Core Height Graph3 April 1989Forwards Cycle 1 Radial Peaking Factor Limit Rept,Per Tech Spec 6.8.1.6 & Elevation Dependent Peaking Factor Versus Core Height Graph
ELV-00273, Forwards Sixth Suppl to Summary Rept of Startup Test Program.Initial Summary Rept Submitted on 870831.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal28 February 1989Forwards Sixth Suppl to Summary Rept of Startup Test Program.Initial Summary Rept Submitted on 870831.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal
ELV-00275, Forwards Response to Violations Noted in Insp Rept 50-424/89-06.Response Withheld28 February 1989Forwards Response to Violations Noted in Insp Rept 50-424/89-06.Response Withheld
ELV-00294, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Per 10CFR50,App J28 February 1989Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Per 10CFR50,App J
ELV-00304, Forwards Revised Response to Violation Noted in Insp Rept 50-424/88-56 on 881029-1216.Corrective Actions:Performance of post-refueling Outage Containment Insp & Evaluation Upgraded & Operations Personnel Briefed on Subj Notice7 March 1989Forwards Revised Response to Violation Noted in Insp Rept 50-424/88-56 on 881029-1216.Corrective Actions:Performance of post-refueling Outage Containment Insp & Evaluation Upgraded & Operations Personnel Briefed on Subj Notice
ELV-00310, Responds to Violations Noted in Insp Rept 50-424/88-61. Corrective Actions:Shift Operators Counseled on Failure to Follow Procedural Requirements of Procedure 10001-C7 March 1989Responds to Violations Noted in Insp Rept 50-424/88-61. Corrective Actions:Shift Operators Counseled on Failure to Follow Procedural Requirements of Procedure 10001-C
ELV-00311, Informs of Completion of 1,000 H Availability Test of Spds. Several Radiation Monitors out-of-svc During Part of Test Period or for Entire Test Period.W/Monitors Excluded from Test Criteria,Availability of 99.936% Achieved10 March 1989Informs of Completion of 1,000 H Availability Test of Spds. Several Radiation Monitors out-of-svc During Part of Test Period or for Entire Test Period.W/Monitors Excluded from Test Criteria,Availability of 99.936% Achieved
ELV-00330, Forwards Suppl to Rev 11 to Emergency Plan.Suppl Corrects Administrative Errors14 March 1989Forwards Suppl to Rev 11 to Emergency Plan.Suppl Corrects Administrative Errors
ELV-00332, Forwards Response to Re Request for Certain Existing Plant Documents to Be Utilized in Development of risk-based Insp Guide.W/O Attachments14 March 1989Forwards Response to Re Request for Certain Existing Plant Documents to Be Utilized in Development of risk-based Insp Guide.W/O Attachments
ELV-00336, Requests NRC Comments Re Reactor Trip Breaker Maint Frequency by 890421.Based on Westinghouse Recommendations, Maint Interval of 500 Operations,Or 18 Months,Whichever Comes First,More Appropriate for Group a Maint28 March 1989Requests NRC Comments Re Reactor Trip Breaker Maint Frequency by 890421.Based on Westinghouse Recommendations, Maint Interval of 500 Operations,Or 18 Months,Whichever Comes First,More Appropriate for Group a Maint
ELV-00340, Forwards Revised Monthly Operating Rept for Jan 1989 & Monthly Operating Rept for Feb 1989 for Vogtle,Units 1 & 215 March 1989Forwards Revised Monthly Operating Rept for Jan 1989 & Monthly Operating Rept for Feb 1989 for Vogtle,Units 1 & 2
ELV-00342, Forwards Executed Amend 4 to Indemnity Agreement B-10716 March 1989Forwards Executed Amend 4 to Indemnity Agreement B-107
ELV-00358, Completes Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Instrumentation for Unisolable Sections of Piping to Detect Adverse Temp Distributions Installed & Data Collection Initiated27 March 1989Completes Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Instrumentation for Unisolable Sections of Piping to Detect Adverse Temp Distributions Installed & Data Collection Initiated
ELV-00365, Forwards Comments on Sser 8.Spent Fuel Storage Racks Will Have Boraflex on All Sides,Including Sides Adjacent to Fuel Pool Walls16 March 1989Forwards Comments on Sser 8.Spent Fuel Storage Racks Will Have Boraflex on All Sides,Including Sides Adjacent to Fuel Pool Walls
ELV-00373, Provides Rept of Present Level of Insurance & Sources of Insurance for Plant,Per 10CFR50.54(W)(2)23 March 1989Provides Rept of Present Level of Insurance & Sources of Insurance for Plant,Per 10CFR50.54(W)(2)
ELV-00376, Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Util Identified 759 Molded Case Circuit Breakers Being Maintained as safety-related Spares in Unit 1 Warehouse as of 88120531 March 1989Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Util Identified 759 Molded Case Circuit Breakers Being Maintained as safety-related Spares in Unit 1 Warehouse as of 881205
ELV-00378, Responds to Violations Noted in Insp Rept 50-425/89-03. Corrective Actions:Controls in Place & Implemented to Identify,Track & Review Deficiencies for Reportability28 March 1989Responds to Violations Noted in Insp Rept 50-425/89-03. Corrective Actions:Controls in Place & Implemented to Identify,Track & Review Deficiencies for Reportability
ELV-00432, Responds to Station Blackout Rule.Blackout Start Procedure & Restoration of Offsite Ac Power for Shutdown Added to Existing Procedures for Coping W/Station Blackout.Mods Required to Obtain 4 H Coping Duration Listed12 April 1989Responds to Station Blackout Rule.Blackout Start Procedure & Restoration of Offsite Ac Power for Shutdown Added to Existing Procedures for Coping W/Station Blackout.Mods Required to Obtain 4 H Coping Duration ListedSafe Shutdown
ELV-00436, Forwards Response to Violations Noted in Insp Rept 50-424/89-09 on 890202-03.Response Withheld7 April 1989Forwards Response to Violations Noted in Insp Rept 50-424/89-09 on 890202-03.Response Withheld
ELV-00449, Forwards Amend 12 to Physical Security Plan.Amend Withheld (Ref 10CFR73.21)28 April 1989Forwards Amend 12 to Physical Security Plan.Amend Withheld (Ref 10CFR73.21)
ELV-00458, Forwards Amend 5 to Indemnity Agreement B-10721 April 1989Forwards Amend 5 to Indemnity Agreement B-107
ELV-00473, Submits Change to Initial Startup Test Program Described in Chapter 14 of Fsar.Change Adds Footnote to Test Abstract for Containment,Auxiliary,Control & Fuel Handling Bldgs Drain Sys1 May 1989Submits Change to Initial Startup Test Program Described in Chapter 14 of Fsar.Change Adds Footnote to Test Abstract for Containment,Auxiliary,Control & Fuel Handling Bldgs Drain SysBoric Acid
ELV-00475, Forwards Vogtle Unit 1 Annual Rept,Part 21 May 1989Forwards Vogtle Unit 1 Annual Rept,Part 2
ELV-00476, Requests Extension for Annual Simulator Test Until mid-Jul 1989.Proposes Extension of Deadline for First Annual Operability Test to 900228,to Allow Testing to Be Performed After New Models Are Operational & Allow Acceptance Test28 April 1989Requests Extension for Annual Simulator Test Until mid-Jul 1989.Proposes Extension of Deadline for First Annual Operability Test to 900228,to Allow Testing to Be Performed After New Models Are Operational & Allow Acceptance Test
ELV-00478, Forwards Objectives & Scope of Annual Emergency Preparedness Exercise Scheduled for 890726.Exercise Will Not Involve Evaluated Participation by State or County Agencies8 May 1989Forwards Objectives & Scope of Annual Emergency Preparedness Exercise Scheduled for 890726.Exercise Will Not Involve Evaluated Participation by State or County Agencies
ELV-00484, Informs of Change in Distribution for NRC Correspondence Due to Recent Completion of Const of Unit 2 & Relocation of Nuclear Operations Corporate Ofc to Birmingham,Al.Revised List Encl1 May 1989Informs of Change in Distribution for NRC Correspondence Due to Recent Completion of Const of Unit 2 & Relocation of Nuclear Operations Corporate Ofc to Birmingham,Al.Revised List Encl
ELV-00488, Informs of Two Minor Errors to Be Corrected in NRC Hearing for Plant Full Power License.Organization Described on Figures 13.1.1-1 & 13.1.1-2 of Plant FSAR1 May 1989Informs of Two Minor Errors to Be Corrected in NRC Hearing for Plant Full Power License.Organization Described on Figures 13.1.1-1 & 13.1.1-2 of Plant FSAR
ELV-00499, Submits Three Changes to Description of Initial Startup Test Program in Chapter 14 of Fsar.Changes Add Footnote to Test Abstract for Boron Thermal Regeneration Sys & Liquid Waste Processing Sys11 May 1989Submits Three Changes to Description of Initial Startup Test Program in Chapter 14 of Fsar.Changes Add Footnote to Test Abstract for Boron Thermal Regeneration Sys & Liquid Waste Processing SysHydrostatic
ELV-00503, Forwards Status of Control Room Design Review,Human Engineering Discrepancies & Similarity Review Remaining Issues. All Confirmatory Items Addressed Except Annunicator Nuisance Alarms9 May 1989Forwards Status of Control Room Design Review,Human Engineering Discrepancies & Similarity Review Remaining Issues. All Confirmatory Items Addressed Except Annunicator Nuisance Alarms
ELV-00512, Forwards Proprietary Rev 1 to WCAP-11312 & Nonproprietary Rev 1 to WCAP-11966, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/Surveillance.... Proprietary Rept Withheld (Ref 10CFR2.790)25 July 1989Forwards Proprietary Rev 1 to WCAP-11312 & Nonproprietary Rev 1 to WCAP-11966, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/Surveillance.... Proprietary Rept Withheld (Ref 10CFR2.790)
ELV-00515, Responds to Violations Noted in Insp Repts 50-424/89-10 & 50-425/89-12 on 890208-0317.Corrective Actions:Qc Inspector Counseled Re Failure to Comply W/Procedure 85301-C Requirements & Personnel Appraised of Problem18 May 1989Responds to Violations Noted in Insp Repts 50-424/89-10 & 50-425/89-12 on 890208-0317.Corrective Actions:Qc Inspector Counseled Re Failure to Comply W/Procedure 85301-C Requirements & Personnel Appraised of Problem
ELV-00518, Requests Concurrence W/Proposed Change to Operations QA Program,Changing Size of Site Safety Audit & Engineering Review Organization Technical Personnel to eight.Marked-up FSAR Pages Showing Proposed Change Encl18 May 1989Requests Concurrence W/Proposed Change to Operations QA Program,Changing Size of Site Safety Audit & Engineering Review Organization Technical Personnel to eight.Marked-up FSAR Pages Showing Proposed Change Encl
ELV-00531, Advises That Date for Submittal of Reactor Vessel Level Instrumentation Sys Implementation Rept Postponed.Completed Implementation Rept Will Be Submitted by 89061518 May 1989Advises That Date for Submittal of Reactor Vessel Level Instrumentation Sys Implementation Rept Postponed.Completed Implementation Rept Will Be Submitted by 890615
ELV-00594, Provides Addl Info Re Proposed Changes to QA Program,Per NRC Request.Program of Audits Required by Tech Specs & FSAR Not Being Changed by Reduction in Personnel8 June 1989Provides Addl Info Re Proposed Changes to QA Program,Per NRC Request.Program of Audits Required by Tech Specs & FSAR Not Being Changed by Reduction in Personnel
ELV-00599, Forwards Implementation Rept on Reactor Vessel Level Instrumentation Sys,Per NUREG-0737,Item II.F.2 & Sser 18 June 1989Forwards Implementation Rept on Reactor Vessel Level Instrumentation Sys,Per NUREG-0737,Item II.F.2 & Sser 1
ELV-00609, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-424/89-13 on 890327-31.Corrective Actions:Rev to Procedure 00101-C, Drawing Control Completed to Include Distribution of Advanced Copies of as-built Notices14 June 1989Responds to NRC Ltr Re Violations Noted in Insp Rept 50-424/89-13 on 890327-31.Corrective Actions:Rev to Procedure 00101-C, Drawing Control Completed to Include Distribution of Advanced Copies of as-built Notices
ELV-00610, Requests Amend to Util 880826 Exemption Request to Allow GMR-I Canisters to Be Stored in Class C Storage Environ. Exemption Should Be Granted by 90011528 September 1989Requests Amend to Util 880826 Exemption Request to Allow GMR-I Canisters to Be Stored in Class C Storage Environ. Exemption Should Be Granted by 900115Exemption Request
ELV-00615, Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Util Determined That No Tube Plugs Identified as Susceptible to Primary Water Stress Corrosion Cracking Installed in Steam Generators16 June 1989Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Util Determined That No Tube Plugs Identified as Susceptible to Primary Water Stress Corrosion Cracking Installed in Steam Generators
ELV-00634, Responds to Generic Ltr 89-08 Re Erosion/Corrosion Induced Pipe Wall Thinning.Erosion/Corrosion Monitoring Program Implemented for Unit 1 & Will Be Developed for Unit 2.Insps for Unit 2 Will Be Performed During First Refueling Outage11 July 1989Responds to Generic Ltr 89-08 Re Erosion/Corrosion Induced Pipe Wall Thinning.Erosion/Corrosion Monitoring Program Implemented for Unit 1 & Will Be Developed for Unit 2.Insps for Unit 2 Will Be Performed During First Refueling Outage
ELV-00650, Discusses Proposed Mods to Settlement Monitoring Program. Program Includes Specific Provisions for Reading of Settlement Markers & for Engineering Evaluation of Settlement data.W/45 Oversize Drawings23 June 1989Discusses Proposed Mods to Settlement Monitoring Program. Program Includes Specific Provisions for Reading of Settlement Markers & for Engineering Evaluation of Settlement data.W/45 Oversize Drawings
ELV-00659, Responds to Generic Ltr 89-06, SPDS & NUREG-1342 Re Industry Implementation of Spds.Util Commits to Maintain SPDS Supporting Documentation for 3 Yrs,Including Completed Checklist & Photographs of SPDS Implementation5 July 1989Responds to Generic Ltr 89-06, SPDS & NUREG-1342 Re Industry Implementation of Spds.Util Commits to Maintain SPDS Supporting Documentation for 3 Yrs,Including Completed Checklist & Photographs of SPDS Implementation
ELV-00665, Forwards Response to Violations Noted in Insp Rept 50-434/88-53.Response Withheld (Ref 10CFR2.790)29 June 1989Forwards Response to Violations Noted in Insp Rept 50-434/88-53.Response Withheld (Ref 10CFR2.790)
ELV-00696, Submits Supplemental Info Re Rev to Tech Spec 5.3.1.Rev Necessary in Order That Higher Enrichment Fuel May Be Used for Plant,Starting W/Cycle 317 July 1989Submits Supplemental Info Re Rev to Tech Spec 5.3.1.Rev Necessary in Order That Higher Enrichment Fuel May Be Used for Plant,Starting W/Cycle 3