Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000269/LER-1983-008, Forwards LER 83-008/01T-0.Detailed Event Analysis Encl | 29 March 1983 | Forwards LER 83-008/01T-0.Detailed Event Analysis Encl | |
05000269/LER-1983-010, Forwards LER 83-010/01T-0.Detailed Event Analysis Encl | 15 April 1983 | Forwards LER 83-010/01T-0.Detailed Event Analysis Encl | |
05000269/LER-1984-007, Advises of Reliability of Auxiliary Oil Pumps Per LER 84-007-00.No Insp of Unit 2 Pump During Outage Warranted. Util Deleting Commitment | 30 April 1985 | Advises of Reliability of Auxiliary Oil Pumps Per LER 84-007-00.No Insp of Unit 2 Pump During Outage Warranted. Util Deleting Commitment | |
05000269/LER-1986-011, Advises That LER 86-011 Re Loss of Condenser Cooling Water Gravity Flow Will Be Submitted by 861201 | 5 November 1986 | Advises That LER 86-011 Re Loss of Condenser Cooling Water Gravity Flow Will Be Submitted by 861201 | |
05000269/LER-1986-012, Notifies That LER 86-012 Re Inoperability of Standby Shutdown Facility Due to Be Submitted by 861114 Will Be Provided by 870120 | 14 November 1986 | Notifies That LER 86-012 Re Inoperability of Standby Shutdown Facility Due to Be Submitted by 861114 Will Be Provided by 870120 | |
05000269/LER-1987-002, Informs That LER 87-002 Re App R Review Concerning Valve Operability Will Be Submitted by 870316.LER Due on 870302 | 2 March 1987 | Informs That LER 87-002 Re App R Review Concerning Valve Operability Will Be Submitted by 870316.LER Due on 870302 | |
05000269/LER-1987-008, Advises That LER-87-008 Re Breach of Containment Integrity Resulting in Tech Spec Violation Due by 871111 Will Be Submitted by 871125.Rept in Preparation | 11 November 1987 | Advises That LER-87-008 Re Breach of Containment Integrity Resulting in Tech Spec Violation Due by 871111 Will Be Submitted by 871125.Rept in Preparation | |
05000269/LER-1996-008, Forwards Suppl to LER 96-008 Concerning Missed Valve Surveillance Which Resulted in Borated Water Storage Tank Technical Inoperability | 31 October 1996 | Forwards Suppl to LER 96-008 Concerning Missed Valve Surveillance Which Resulted in Borated Water Storage Tank Technical Inoperability | |
05000269/LER-1997-003, Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective Action | 12 November 1997 | Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective Action | |
05000269/LER-1998-002, Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit Shutdown | 30 April 1998 | Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit Shutdown | |
05000269/LER-1998-012, Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date | 3 December 1998 | Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date | |
05000269/LER-1998-013, Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 981202 | 2 November 1998 | Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 981202 | |
05000270/LER-1979-009, Forwards LER 79-009/01T-0 | 21 December 1979 | Forwards LER 79-009/01T-0 | |
05000270/LER-1981-019, Forwards LER 81-019/01T-0.Detailed Event Analysis Encl | 8 December 1981 | Forwards LER 81-019/01T-0.Detailed Event Analysis Encl | Fire Watch |
05000270/LER-1982-009, Forwards LER 82-009/03L-0.Detailed Event Analysis Encl | 30 July 1982 | Forwards LER 82-009/03L-0.Detailed Event Analysis Encl | |
05000270/LER-1982-010, Forwards LER 82-010/01T-0.Detailed Event Analysis Encl | 13 August 1982 | Forwards LER 82-010/01T-0.Detailed Event Analysis Encl | |
05000270/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Encl | 15 October 1982 | Forwards LER 82-012/03L-0.Detailed Event Analysis Encl | |
05000270/LER-1982-013, Forwards LER 82-013/03L-0.Detailed Event Analysis Encl | 4 November 1982 | Forwards LER 82-013/03L-0.Detailed Event Analysis Encl | |
05000270/LER-1983-004, Forwards LER 83-004/01T-0.Detailed Event Analysis Encl | 23 March 1983 | Forwards LER 83-004/01T-0.Detailed Event Analysis Encl | |
05000270/LER-1983-006, Forwards LER 83-006/03L-0.Detailed Event Analysis Encl | 29 April 1983 | Forwards LER 83-006/03L-0.Detailed Event Analysis Encl | Earthquake |
05000270/LER-1985-004, Informs That LER 85-04 Expected by 850531 | 21 May 1985 | Informs That LER 85-04 Expected by 850531 | |
05000270/LER-1986-003, Advises That LER 86-003-00 Submittal Delayed Until 860804 | 2 July 1986 | Advises That LER 86-003-00 Submittal Delayed Until 860804 | |
05000287/LER-1981-005, Forwards LER 81-005/03L-0.Detailed Event Analysis Encl | 22 April 1981 | Forwards LER 81-005/03L-0.Detailed Event Analysis Encl | |
05000287/LER-1982-006, Forwards Updated LER 82-006/01X-2.Detailed Event Analysis Encl | 27 August 1982 | Forwards Updated LER 82-006/01X-2.Detailed Event Analysis Encl | Safe Shutdown |
05000287/LER-1982-007, Forwards LER 82-007/01T-0.Detailed Event Analysis Encl | 23 July 1982 | Forwards LER 82-007/01T-0.Detailed Event Analysis Encl | |
05000287/LER-1982-008, Forwards LER 82-008/01T-0.Detailed Event Analysis Encl | 2 July 1982 | Forwards LER 82-008/01T-0.Detailed Event Analysis Encl | |
05000287/LER-1982-010, Forwards LER 82-010/01T-0.Detailed Event Analysis Encl | 18 October 1982 | Forwards LER 82-010/01T-0.Detailed Event Analysis Encl | Missed surveillance |
05000287/LER-1982-012, Forwards LER 82-012/01T-0.Detailed Event Analysis Encl | 1 December 1982 | Forwards LER 82-012/01T-0.Detailed Event Analysis Encl | |
05000287/LER-1982-014, Forwards LER 82-014/01T-0.Detailed Event Analysis Encl | 5 January 1983 | Forwards LER 82-014/01T-0.Detailed Event Analysis Encl | |
05000287/LER-1982-015, Forwards LER 82-015/01T-0.Detailed Event Analysis Encl | 30 December 1982 | Forwards LER 82-015/01T-0.Detailed Event Analysis Encl | Time of Discovery |
05000287/LER-1983-001, Forwards LER 83-001/01T-0.Detailed Event Analysis Encl | 9 March 1983 | Forwards LER 83-001/01T-0.Detailed Event Analysis Encl | |
05000287/LER-1983-002, Forwards LER 83-002/01T-0.Detailed Event Analysis Encl | 25 March 1983 | Forwards LER 83-002/01T-0.Detailed Event Analysis Encl | |
05000287/LER-1983-005, Forwards LER 83-005/01T-0.Detailed Event Analysis Encl | 13 April 1983 | Forwards LER 83-005/01T-0.Detailed Event Analysis Encl | |
3F0191-07, Forwards BAW-2127, Final Submittal for NRC Bulletin 88-011, 'Pressurizer Surge Line Thermal Stratification.' Revised Operating Transients Will Accommodate Normal Variations in Operations & Ensure Margin in Total Fatigue Usage Factor | 31 January 1991 | Forwards BAW-2127, Final Submittal for NRC Bulletin 88-011, 'Pressurizer Surge Line Thermal Stratification.' Revised Operating Transients Will Accommodate Normal Variations in Operations & Ensure Margin in Total Fatigue Usage Factor | Operating Basis Earthquake |
IR 05000260/1978021 | 29 December 1978 | Addl Info on Reportable Occurrence 50-260/78-21.Subsequent Investigation Has Shown Sensor to Have High Ground Leakage Causing Low Signal Output.Isolation Amplifier Installed to Eliminate Leakage | |
IR 05000287/1992023 | 19 March 1993 | Responds to NRC 930210 Ltr Re Violations Noted in Insp Repts 50-287/92-23 & 50-388/92-23.C/As:surveillance Procedures Will Be Revised to Address Types of Fire Barrier Matl to Be Inspected to Provide Acceptance Criteria for Fire Barrier | Fire Barrier |
L-81-027, Forwards Public Version of Revision 1 to Crisis Mgt Plan. Revision Includes Pages of Radiological Emergency Plans & Implementing Procedures Identified as Containing Privacy or Proprietary Info Per NRC Generic Ltr 81-27 | 5 October 1981 | Forwards Public Version of Revision 1 to Crisis Mgt Plan. Revision Includes Pages of Radiological Emergency Plans & Implementing Procedures Identified as Containing Privacy or Proprietary Info Per NRC Generic Ltr 81-27 | |
LG-83-163, Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 | 18 February 1983 | Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 | |
ML15217A103 | 28 February 1990 | Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 for McGuire Nuclear Station Units 1 & 2 & Revised Process Control Programs & Offsite Dose Calculation Manuals | Offsite Dose Calculation Manual Process Control Program |
ML15217A105 | 26 March 1990 | Forwards Revised 1989 Annual Radiological Environ Operating Rept,Consisting of Revised Pages Summarizing Annual Liquid Dose Calculations | Annual Radiological Environmental Operating Report |
ML15219A050 | 25 April 1980 | Forwards Addl Comments to Gaston County Board of Commissioners' Position Opposing Spent Nuclear Fuel Shipment Through County & Two Proposed Alternate Routes.Author Does Not Oppose Shipment If Adequate Safeguards Are Provided | |
ML15219A074 | 23 August 1993 | Forwards Rev 0 to ISI Rept Unit 2 Oconee 1993 Refueling Outage 13. | Hydrostatic VT-2 Liquid penetrant Dissimilar Metal Weld |
ML15223A599 | 24 June 1980 | Forwards Proposed Tech Spec Revision in Response to NRC 800410 Ltr Discussing Term Operable as Applied to Tech Spec Requirements.No License Fees Provided Since Proposal Submitted in Response to NRC Request | Shutdown Margin |
ML15224A258 | 12 May 1993 | Forwards Public Version of Rev 93-02,vol a to Oconee Nuclear Site Emergency Plan & Rev 93-08,vol C to Oconee Nuclear Site Epip. W/930628 Release Memo | |
ML15224A260 | 1 March 1993 | Forwards Public Version of Rev 93-01 to Vol a & Rev 93-05 to Vol C to Emergency plan.W/930625 Release Memo | |
ML15224A262 | 13 January 1993 | Forwards Revs 92-04,92-12 & 92-13 to Vols A,B & C to Emergency Plan & Implementing procedures.W/930628 Release Memo | |
ML15224A265 | 30 June 1993 | Forwards Rev 9 to Corporate Process Control Program Manual. | Process Control Program |
ML15238A600 | 4 June 1982 | Forwards, Audit of Oconee Procedures & Training for Pressurized Thermal Shock. | |
ML15238A612 | 10 June 1982 | Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure HP/0/1009/10 Re Procedures for Quantifying Gaseous Releases Through Steam Relief Valves Under post-accident Conditions | |
ML15238A890 | 12 July 1983 | Forwards Proprietary Gadolinia-Bearing Lead Test Assemblies Design Rept. Info Includes Design,Testing & Analysis for Five Lead Test Assemblies w/12 gadolina-bearing Fuel Rods to Be Loaded in Cycle 8.Rept Withheld (Ref 10CFR2.790) |