Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19249D907 | 18 September 1979 | Responds to 790801 Ltr Requesting Submittal of Proposed Water Chemistry Program to Replace Proposed Tech Specs on Secondary Water Chemistry.Answer to Request Will Be Provided During Review of Facility FSAR & OL Application | |
ML19249E430 | 12 July 1979 | Ack Receipt of IE Insp Repts 50-413/79-10 & 50-414/79-10 on 790612-14.No Proprietary Info | |
ML19249E547 | 4 September 1979 | Ack Receipt of IE Insp Repts 50-413/79-16 & 50-414/79-16. No Proprietary Info | |
ML19253A895 | 20 August 1979 | Ack Receipt of IE Insp Repts 50-413/79-14 & 50-414/79-14 on 790724-27.No Proprietary Info | |
ML19253C350 | 16 November 1979 | Ack Receipt of IE Insp Repts 50-413/79-18 & 50-414/79-18 on 791002-03.No Proprietary Info | |
ML19254B348 | 6 August 1979 | Responds to NRC 790711 Ltr Re Violations Noted in IE Insp Repts 50-413/79-12 & 50-414/79-12.Corrective Actions:Qa Personnel Reinstructed in Proper Handling of Document Approval & QA Procedure P-1 Revised | |
ML19254D273 | 1 October 1979 | Responds to IE Bulletin 79-12, Short Period Scrams at BWR Facilities. Info Will Be Available by 791130 | |
ML19254D435 | 1 October 1979 | Responds to NRC 790924 Ltr Re Violations Noted in IE Insp Repts 50-413/79-12 & 50-414/79-12.Corrective Actions: Documentation Package from Six Specs Rechecked for Generic Problems | |
ML19254E803 | 18 October 1979 | Forwards Past Correspondence to Jp O'Reilly Re IE Bulletins 79-12,79-12A & 79-12B.W/o Encl | |
ML19254E996 | 10 September 1979 | Forwards Deficiency Rept Re Loss of Function of Control Grade Instrumentation | |
ML19256B817 | 31 August 1979 | Forwards Revised Response to Branch Technical Position, Auxiliary & Power Conversion Sys Branch,9.5-1,App a Re Fire Protection Review | |
ML19256F064 | 30 October 1979 | Responds to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. No Sys at Completion Stage,Therefore Reinsp Unnecessary | |
ML19256F349 | 13 December 1979 | Forwards Final Deficiency Rept Re Deficient Weld in Steam Generator Lower Lateral Support & Oversize Drawing of Reactor Bldg | |
ML19257A015 | 26 December 1979 | Forwards Significant Deficiency Rept IE-79-05-SDD-413/414 Re Unqualified Main Steam Power Operated Relief Valves | |
ML19257D664 | 21 December 1979 | Ack Receipt of IE Insp Repts 50-413/79-20 & 50-414/79-20.No Proprietary Info | |
ML19260A458 | 1 November 1979 | Responds to IE Bulletin 79-23, Emergency Diesel Generator Lube Oil Coolers. Design Review Conducted.No Connections Between High Kva & Low Kva Emergency Diesel Generators W/O Adequate Circulatory Current Limitations | |
ML19260D038 | 1 February 1980 | Forwards Deficiency Rept SD 413-414/80-01 | |
ML19261C816 | 12 March 1979 | Ack Receipt of IE Insp Repts 50-413/79-02 & 50-414/79-02 on 790206-09.No Proprietary Info | |
ML19261E118 | 18 May 1979 | Ack Receipt of IE Insp Repts 50-413/79-07 & 50-414/79-07 on 790423-26.No Proprietary Info | |
ML19262C467 | 31 December 1979 | Ack Receipt of IE Insp Repts 50-413/79-21 & 50-414/79-21 on 791113-16.No Proprietary Info | |
ML19263E377 | 20 April 1979 | Responds to IE Bulletin 79-03.Site Has Received 310 Ft of Pipe Mfg by Youngstown Welding & Engineering Co.Pipe Will Receive Field Hydrostatic Test | Hydrostatic Liquid penetrant |
ML19269D374 | 24 April 1979 | Responds to IE Bulletin 79-04.Design of Facility Has Been Reviewed.No Velan Valves in Use | |
ML19269H439 | 16 July 1980 | Forwards Final Rept Re Potential Problem in safety-related Overcurrent Relays.Problem Was Random in Nature & Not Generic | |
ML19270F950 | 15 March 1979 | Ack Receipt of IE Insp Repts 50-413/79-03 & 50-414/79-03.No Proprietary Info | |
ML19274E480 | 21 March 1979 | Forwards Environ Rept-OL Stage, Vols 1&2.Security Plan Forthcoming,Pending NRC Determination of Amend Acceptability | Affidavit |
ML19274G004 | 1 August 1979 | Ack Receipt of IE Insp Repts 50-413/79-13 & 50-414/79-13 on 790627-29.No Proprietary Info | |
ML19275A672 | 27 September 1979 | Ack Receipt of IE Insp Repts 50-413/79-15 & 50-414/79-15. No Proprietary Info | |
ML19275A685 | 28 September 1979 | Ack Receipt of IE Insp Repts 50-413/79-17 & 50-414/79-17.No Proprietary Info | |
ML19276E976 | 21 March 1979 | Forwards Electrical Schematics, Vols 1-5 | Affidavit |
ML19276F751 | 27 March 1979 | Ack Receipt of IE Insp Repts 50-413/79-04 & 50-414/79-04 on 790227-0302.No Proprietary Info | |
ML19276G922 | 14 August 1979 | Forwards Final Deficiency Rept Re safety-related Valve/Operator Natural Frequency Analysis | |
ML19283B642 | 21 January 1979 | FOIA Request for Documents Re NRC Reevaluation of Rasmussen Rept | |
ML19284A684 | 28 February 1979 | Ack Receipt of IE Insp Repts 50-413/79-01 & 50-414/79-01 on 790108-09.No Proprietary Info | |
ML19290G615 | 7 November 1980 | Responds to NRC 801008 Ltr Re Violation Noted in IE Insp Repts 50-413/80-24 & 50-414/80-24.Corrective Actions: Measures Established to Ensure Equipment Removed from Warehouse Is Maintained at Designated Storage Levels | |
ML19291C271 | 16 January 1980 | Forwards Deficiency Rept 79-07 Re Refueling Water Storage Tank Capacity | |
ML19296D622 | 7 March 1980 | Forwards Significant Deficiency Rept Re Diesel Generator Heat Exchanger Incorrect Segmental Baffling | |
ML19305B944 | 11 February 1980 | Responds to NRC 80118 Ltr Re Violations Noted in IE Insp Repts 50-413/79-23 & 50-414/79-23.Corrective Actions: Procedures to Provide Instruction for Matl Handling & Protection Have Been Implemented | |
ML19305D897 | 1 April 1980 | Ack Receipt of IE Insp Repts 50-413/80-02 & 50-414/80-02 on 800212-14.No Proprietary Info | |
ML19308C612 | 31 December 1979 | Ack Receipt of IE Insp Repts 50-413/79-22 & 50-414/79-22 on 791119-21.No Proprietary Info | |
ML19308C651 | 7 January 1980 | Forwards Revision 1 of Util Response to IE Bulletin 79-02, Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Util Will Account for Base Plate Flexibility in Expansion Anchor Bolt Load Calculations | Finite Element Analysis |
ML19309G045 | 23 April 1980 | Forwards Deficiency Rept Re Control Rod Guide Tube Support Pin Cracking | |
ML19312B977 | 2 April 1974 | Forwards Proposed Organization Chart of QA Program Effective May 1974.Notification of Change Per Supplemental Decision of Appeal Board on 730906 | |
ML19312C626 | 26 April 1974 | Responds to AEC Request for Antitrust Advice.Advice in 710802,0929 & 730501 Ltrs Withdrawn.Antitrust Hearings Unnecessary & Should Be Terminated.Applicant 740426 Ltr & Statement of Commitments Encl | |
ML19312D138 | 22 February 1980 | Ack Receipt of IE Insp Repts 50-413/80-01 & 50-414/80-01, on 800123-25.No Proprietary Info | |
ML19312D210 | 14 March 1980 | Advises That Rept Re 800214 Containment Equipment Hatch Const Deficiency Will Be Forwarded by 800404 | |
ML19312D274 | 4 February 1980 | Responds to IE Bulletin 79-28.Review Revealed That 64 Namco Model EA180 Limit Switches Used in safety-related Equipment May Be of Production Lot Specified in Bulletin. Corrective Actions Will Be Completed by 800701 | |
ML19312D507 | 29 February 1980 | Forwards Significant Deficiency Rept 413-414/80-02 Re Three Relays & Trip Devices Not Meeting Relay time-current Characteristic Specs for Application | |
ML19312E575 | 1 April 1980 | Forwards Significant Deficiency Repts 413/80-04 & 414/80-04 Re Improper Radiography of Containment Vessel Equipment Hatch | |
ML19317E224 | 21 May 1975 | Forwards 750417 Correspondence from Congressman Jr Mann Re Constituent Inquiry | |
ML19318A863 | 9 June 1980 | Responds to IE Bulletin 80-05, Vacuum Conditions Resulting in Damage to Chemical Vol Control Sys Holdup Tanks. Lists Low Pressure & Holdup Tanks Which Are Normally Valved to Contain Primary Sys Water |