Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000309/1984011 | 31 July 1985 | Safety Evaluation Supporting Util Resolution of Insp Issues from Insp Rept 50-309/84-11.Items Closed,Pending Region I Confirmation | Fire Barrier Exemption Request |
ML18041A135 | 1 July 1986 | LER 86-004-00:on 860601,heater Drain Tank Level Control Channel Failed & Both Heater Drain Pumps Tripped.Caused by Severe Lightning Storm.Heater Drain Tank Level Control Channel Power Supply replaced.W/860701 Ltr | Unanalyzed Condition Boric Acid Shutdown Margin Half scram Fire Barrier Temporary Modification Scram Discharge Volume Overtravel Grace period Backfit |
ML18041A187 | 10 February 1989 | LER 89-002-00:on 890111,reactor Protection Sys Automatically Actuated.Caused by Voltage Fluctuation on Vital Bus Which Induced False High Startup Rate Scram Signal.Conditional Precautions Added to Operating procedures.W/890210 Ltr | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Fire Barrier Operating Basis Earthquake Scram Discharge Volume Grace period |
ML18065B011 | 18 October 1996 | Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology | |
ML18066A277 | 13 August 1998 | Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency | |
ML20054H889 | 16 June 1982 | Safety Evaluation Re Proposed Facility Mods to Increase Capacity of Spent Fuel Storage Pool.Mods Acceptable Subj to Resolution of Open Items | |
ML20054L896 | 10 June 1982 | Monthly Operating Rept for May 1982 | |
ML20055A806 | 8 June 1982 | Inservice Insp Rept During June 1981.Describes Insp of Tubes on Steam Generator 2.Steam Generator 2 Determined Operable in Accordance W/Tech Spec 4.4.10.1 on 810623 | |
ML20055C291 | 20 February 1990 | Safety Evaluation Accepting Util Assessment of Asymmetric LOCA Loads Problem | |
ML20055C860 | 18 June 1990 | Safety Evaluation Supporting Amend 132 to License DPR-3 | |
ML20055E159 | 31 July 1990 | Reactor Pressure Vessel Evaluation Rept | |
ML20055F675 | 30 June 1990 | Monthly Operating Rept for June 1990 for Yankee Atomic Power Station | |
ML20055G680 | 31 July 1990 | Yankee Plant Small Break LOCA Analysis | |
ML20055G701 | 31 July 1990 | Yankee Nuclear Power Station Core 21 Performance Analysis | |
ML20055G705 | 19 July 1990 | Rev 0 to Yankee Cycle 21 Core Operating Limits Rept | |
ML20055J322 | 25 July 1990 | Decommissioning Funding Assurance Rept & Certification | |
ML20056A196 | 1 August 1990 | Special Rept:Two Fire Pumps Inoperable at Same Time.Caused by Necessity to Accomplish Surveillance to Verify Capability to Start Pump on Emergency Diesel Generator 3 & Planned 18-month Insp of Diesel Per Tech Specs | |
ML20056B012 | 31 July 1990 | Emergency Response & Evaluation 1990 Final Full-Participation Exercise Parts I & II | |
ML20056E677 | 20 August 1993 | Initial Part 21 Rept Re GE AK-25 Circuit Breakers w/RMS-9 Overcurrent Trip Devices.On 930731,three Spurious Trips of Subj Breakers Experienced While in Refueling Shutdown.Addl Info Re Issue Will Be Provided within 30 Days | |
ML20056F783 | 23 August 1993 | Safety Evaluation Supporting Amend 142 to License DPR-36 | |
ML20056F830 | 12 August 1993 | Rev of Maine Yankee Cycle 14 Colr | |
ML20056F834 | 30 April 1993 | Cycle 14 Core Performance Analysis | |
ML20056H174 | 10 June 1993 | Preliminary Assessment of Potential Human Exposures to Routine Tritium Emissions from Yankee Atomic Electric Co Nuclear Power Facility Located Near Rowe,Ma | |
ML20057F846 | 30 September 1993 | Monthly Operating Rept for Sept 1993 for Maine Yankee Atomic Power Station | |
ML20058B968 | 31 October 1993 | Monthly Operating Rept for Oct 1993 for Maine Yankee Atomic Power Station | |
ML20058B983 | 31 August 1993 | Revised Operating Data for Aug 1993 for Maine Yankee Atomic Power Station | |
ML20058C406 | 22 October 1990 | Safety Evaluation Supporting Amend 137 to License DPR-3 | |
ML20058E264 | 5 November 1993 | Safety Evaluation Supporting Amend 143 to License DPR-36 | |
ML20058F220 | 2 November 1990 | Safety Evaluation Accepting Util Response to Generic Ltr 83-28 Re post-trip Review - Data & Info Capability | |
ML20058G147 | 31 October 1990 | Vol 2 to Star Methodology Application for PWRs Control Rod Ejection Main Steam Line Break | |
ML20058H284 | 3 November 1990 | Special Rept:On 901101,control Rod 24 Found Disconnected from Drive Shaft.Drive Shaft Latching Will Be Initiated | |
ML20058J038 | 8 March 1993 | RPS Setpoint Methodology Using Statistical Combination of Uncertainties, Vol 3 | |
ML20058L032 | 2 August 1990 | Safety Evaluation Supporting Amend 133 to License DPR-3 | |
ML20058L665 | 2 August 1990 | Safety Evaluation Supporting Amend 134 to License DPR-3 | |
ML20058N477 | 20 December 1993 | Rev 0.0 to Yankee Nuclear Power Station Decommissioning Plan | |
ML20058N658 | 13 August 1990 | Special Rept Re Diesel Fire Pump & Tank Inoperable for Greater than Seven Days for Draining,Cleaning & Insp.During Period Redundant Pumping Capacity Available Via Two Remaining Electric Driven Fire Pumps | |
ML20058P377 | 31 July 1990 | Monthly Operating Rept for Jul 1990 for Maine Yankee Atomic Power Station | |
ML20058P381 | 30 June 1990 | Revised Monthly Operating Rept for June 1990 | |
ML20058P784 | 14 August 1990 | Part 21 Rept Re Misapplication of Fluorolube FS-5 Oil in Main Steam Line Pressure Gauges.All Four Indicators Replaced W/Spare Gauges Which Utilize High Temp Silicone Oil | |
ML20059B986 | 13 August 1990 | Partially Withheld Topical Rept Evaluation of Cen 387-P, Pressurizer Surge Line Flow Stratification Evaluation. Rept Found Inadequate to Justify Continued Operation for 40-yr Plant Life | |
ML20059C501 | 29 October 1993 | Special Rept:On 931019,meteorological Instrumentation Channel for Delta T Declared Inoperable.Caused by Ceased Aspirator Motor Located at Top of Tower.Motor Replaced |