Monthly Operating Rept for May 1982
ML20054L896
Person / Time
Site: Yankee Rowe
Issue date: 06/10/1982
From: Doyle A
YANKEE ATOMIC ELECTRIC CO.
To:
Shared Package
ML20054L892 List:
References
NUDOCS 8207090043
Download: ML20054L896 (5)


Text

_

m r.

O i

h YANKEE ATOMIC NUCLEAR POWER STATION i

MONTHLY STATISTICAL REPORT 82-5 FOR TIIE MONTH OF MAY, 1982 i

l, l.

i 6

i e

)

4 a

j i

i 4 -

8207090043 820610

~~

PDR ADOCK 05000029 R

pon

- _. - - _. _. _ _ _ _ _ _ _ _ _, - _ _ _, ~. _. - _ - -.. ~. _,, _. ~ _ - _, -.. _ _.. _... _. _ _

4 OPERATING DATA REPORT DOCKET NO.

50-29 DATE 820610 COh!PLETED BY A ** Povie TELEPHONE (617) 872-8100 X239' OPERATING STATUS Notes Yankee Rowe

1. Unit Name:

May, 1982 Power level restricted by

2. Reporting Period:
3. Licensed Thermal Power (5!Wt):

6b.,

installation of baffle 185 plater in turbine.

4. Namep!ste Rating (Gross 51We):

175

5. Design Electrics! Rating (Net b!We):

180

6. 5!sximum Dependable Capacity (Gross MWe):

175

7. 51stimum Dependable Capacity (Net blWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
  • 50 MWe
9. Power Level To Which Restricted.If Any (Net alwe):

See notes

10. Ressons For Restrictions.If Any:

This 5fonth Yr to.Date Cumuistive 744.00 3,623.00

11. Hours in Reporting Period 744.00 1, e l nn 150.554.15
12. Number Of Hours Reactor Was Critical 0.00 n nn n_nn
13. Resetor Resene Shutdown Hours 744.00 3.623.0n 146.103.50
14. Hours Generator on-Line 0.00 0.00 0.00
15. Unit Reserve Shutdown Hours
16. GrossThermal Energy Genersted (SlWH) 444,807.00 2.149.650.00 78.654.583.52 115,227.00 556.714.40 23.896.418.10
17. Gross Electrical Energy Generated (>!WH) 107,157.42 517.446.21 22.360.539.84
18. Net Electrical Energy Generated (51WH) 100,00 100.00 77.35
19. Unit Service Factor 100.00 100.00 77.35
20. Ur.it Availability Facto, 82.30 81.61 69.68
21. Unit Capseity Factor (Using alDC Net) 82.30 81.61 69.68
22. Unit Capacity Factor (Using DER Net) 0.00 0.00 5.09
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Stonths (Type. Date.and Duration of Each1:

Core XVI refuelina/maintennnce achodiilna for thirteen weeks beginning September 11, 1982.

25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units in Test Status (Prior to Commereisi Operation):

Fore sst Achieved INITIA L CRITICALITY INITIA L ELECTRICITY CO3151ERCIAL OPERATION (0/77)

i o-AVERAGE DAILY UNIT POWER LEVEL 6

DOCKET NO. 50-29 UNIT Yankee Rowe 820610 DATE COMPLETED BY A.E. Doyle TELEPHONE (617) 872-8100 x2390 MONTH MAY. 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-NetI 144.2 3

145.0 37 2

145.I gg 144.1 3

145.2 39 144.1 4

144.9 20 144.0 5

144.8 21 143.9 6

145.0 144.0' 22 144 7 137.8 7

23 3

144.7 24 143.5 9

144.5 25 143.8 10 144 3 143.8 26 144,2 II 27 143.7 12 144.3 28 143.6 13 144.3 143.5 29 14 144.2 30 143.5 15 I44 4 143.5

~

31 16 144.3 INSTRUCTIONS On this format.!!st the sserage dstly unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megswatt.

(9/77)

DOCKET NO.

50-29 UNIT Yankee Rowe DATE 820610 COMPLETED BY A.E. Doyle TELEPHONE (617) 872-8100 X2390 REPORT MONTH MAY, 1982 SU'BtARY OF OPERATING EXPERIENCES 5/23 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> a load reduction was begun for turbine throttle and control valve exercise. At 0336 hours0.00389 days <br />0.0933 hours <br />5.555556e-4 weeks <br />1.27848e-4 months <br /> the valve exercise was satisfactorily completed and comenced load increase from 110 MWe.

At 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> the plant was at full load at 155 MWe.

a

s UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-29 UNIT NAME Yankee Rowe DATE st9n610 REPORT MONTil MAY. 1982 COMPI.ETED lay _ A.E. Doyle TEl.EPflONE (617) 872-8100 X2390 e

r.

  • 53 E

No.

Date 8.

"h _5 1'E3 U" 5" 5*.,

59.

Cause & Corrective

~

3 U

Sge Event g7 gg 3c,;,,,,

O.-$

lg is y Report

  • in u u

p,,,,,,g,c,,,,,c,

~

d l

None N/A N/A N/A N/A N/A N/A N/A N/A N/A l

l l

l l

1 2

3 F: Forted 1(cason:

4 Method:

Exhibit G Instructions S: Stheduled A.I:quipment Failure (Emplain) t Manual for Pseparation of Data B-Maintenance of Test 7 Manual Scram.

Entry Sheets for 1.icensee C Refueling 3 Automatic Scram.

Event flepent (LER) File (NURI:C-D-Itegul.iiory Restriction 4-Other (Emplain) 0161)

E Opesator Training & Ucense Examination F Adeniniusative 5

G Opesational luus (limplain) l'8/17)

Il Othes (limplain) 1:alubis ! SameSouece

~ ' ' ' '

' ' ' '