h YANKEE ATOMIC NUCLEAR POWER STATION i
MONTHLY STATISTICAL REPORT 82-5 FOR TIIE MONTH OF MAY, 1982 i
l, l.
i 6
i e
)
4 a
j i
i 4 -
8207090043 820610
~~
PDR ADOCK 05000029 R
pon
- _. - - _. _. _ _ _ _ _ _ _ _ _, - _ _ _, ~. _. - _ - -.. ~. _,, _. ~ _ - _, -.. _ _.. _... _. _ _
4 OPERATING DATA REPORT DOCKET NO.
50-29 DATE 820610 COh!PLETED BY A ** Povie TELEPHONE (617) 872-8100 X239' OPERATING STATUS Notes Yankee Rowe
- 1. Unit Name:
May, 1982 Power level restricted by
- 2. Reporting Period:
- 3. Licensed Thermal Power (5!Wt):
6b.,
installation of baffle 185 plater in turbine.
- 4. Namep!ste Rating (Gross 51We):
175
- 5. Design Electrics! Rating (Net b!We):
180
- 6. 5!sximum Dependable Capacity (Gross MWe):
175
- 7. 51stimum Dependable Capacity (Net blWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
- 50 MWe
- 9. Power Level To Which Restricted.If Any (Net alwe):
See notes
- 10. Ressons For Restrictions.If Any:
This 5fonth Yr to.Date Cumuistive 744.00 3,623.00
- 11. Hours in Reporting Period 744.00 1, e l nn 150.554.15
- 12. Number Of Hours Reactor Was Critical 0.00 n nn n_nn
- 13. Resetor Resene Shutdown Hours 744.00 3.623.0n 146.103.50
- 14. Hours Generator on-Line 0.00 0.00 0.00
- 15. Unit Reserve Shutdown Hours
- 16. GrossThermal Energy Genersted (SlWH) 444,807.00 2.149.650.00 78.654.583.52 115,227.00 556.714.40 23.896.418.10
- 17. Gross Electrical Energy Generated (>!WH) 107,157.42 517.446.21 22.360.539.84
- 18. Net Electrical Energy Generated (51WH) 100,00 100.00 77.35
- 19. Unit Service Factor 100.00 100.00 77.35
- 20. Ur.it Availability Facto, 82.30 81.61 69.68
- 21. Unit Capseity Factor (Using alDC Net) 82.30 81.61 69.68
- 22. Unit Capacity Factor (Using DER Net) 0.00 0.00 5.09
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Stonths (Type. Date.and Duration of Each1:
Core XVI refuelina/maintennnce achodiilna for thirteen weeks beginning September 11, 1982.
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commereisi Operation):
Fore sst Achieved INITIA L CRITICALITY INITIA L ELECTRICITY CO3151ERCIAL OPERATION (0/77)
i o-AVERAGE DAILY UNIT POWER LEVEL 6
DOCKET NO. 50-29 UNIT Yankee Rowe 820610 DATE COMPLETED BY A.E. Doyle TELEPHONE (617) 872-8100 x2390 MONTH MAY. 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-NetI 144.2 3
145.0 37 2
145.I gg 144.1 3
145.2 39 144.1 4
144.9 20 144.0 5
144.8 21 143.9 6
145.0 144.0' 22 144 7 137.8 7
23 3
144.7 24 143.5 9
144.5 25 143.8 10 144 3 143.8 26 144,2 II 27 143.7 12 144.3 28 143.6 13 144.3 143.5 29 14 144.2 30 143.5 15 I44 4 143.5
~
31 16 144.3 INSTRUCTIONS On this format.!!st the sserage dstly unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megswatt.
(9/77)
DOCKET NO.
50-29 UNIT Yankee Rowe DATE 820610 COMPLETED BY A.E. Doyle TELEPHONE (617) 872-8100 X2390 REPORT MONTH MAY, 1982 SU'BtARY OF OPERATING EXPERIENCES 5/23 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> a load reduction was begun for turbine throttle and control valve exercise. At 0336 hours0.00389 days <br />0.0933 hours <br />5.555556e-4 weeks <br />1.27848e-4 months <br /> the valve exercise was satisfactorily completed and comenced load increase from 110 MWe.
At 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> the plant was at full load at 155 MWe.
a
s UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-29 UNIT NAME Yankee Rowe DATE st9n610 REPORT MONTil MAY. 1982 COMPI.ETED lay _ A.E. Doyle TEl.EPflONE (617) 872-8100 X2390 e
r.
- 53 E
No.
Date 8.
"h _5 1'E3 U" 5" 5*.,
59.
Cause & Corrective
~
3 U
Sge Event g7 gg 3c,;,,,,
O.-$
lg is y Report
- in u u
p,,,,,,g,c,,,,,c,
~
d l
None N/A N/A N/A N/A N/A N/A N/A N/A N/A l
l l
l l
1 2
3 F: Forted 1(cason:
4 Method:
Exhibit G Instructions S: Stheduled A.I:quipment Failure (Emplain) t Manual for Pseparation of Data B-Maintenance of Test 7 Manual Scram.
Entry Sheets for 1.icensee C Refueling 3 Automatic Scram.
Event flepent (LER) File (NURI:C-D-Itegul.iiory Restriction 4-Other (Emplain) 0161)
E Opesator Training & Ucense Examination F Adeniniusative 5
G Opesational luus (limplain) l'8/17)
Il Othes (limplain) 1:alubis ! SameSouece
~ ' ' ' '
' ' ' '