ML19241B14030 June 1979Analysis of Populations of Boring & Fouling Organisms in Vicinity of Oyster Creek Nuclear Generating Station, Quarterly rept,Sept-Nov 1978
ML19256F76131 July 1978Analysis of Population of Boring & Fouling Organisms in Vicinity of Oyster Creek Nuclear Generating Station, Quarterly Rept,Dec 1977-Feb 1978
ML19284A41531 January 1979NUREG/CR-0380 - Analysis of Populations of Boring & Fouling Organisms in the Vicinity of the Oyster Creek Nuclear Generating Station, Seventh Quarterly Report March 1, 1978 - May 31,1978
ML19321B29231 July 1980Analysis of Populations of Boring & Fouling Organisms in Vicinity of Oyster Creek Nuclear Generating Station, Quarterly Rept June-Aug 1979
ML19340F17531 May 1980Tornado & Straight Wind Hazard Probability for Oyster Creek Nuclear Power Reactor Site,Nj.
ML19343C36928 February 1981Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating StationVeliger
ML19344D91321 July 1980Primary Coolant Sys Pressure Isolation Valves,Oyster Creek Unit 1, Technical Evaluation Rept
ML19345B19431 October 1980Ecological Studies of WOOD-BORING Bivalves in the Vicinity of Oyster Creek Nuclear Generating Station
ML19347F88930 April 1981Seismic Review of the Oyster Creek Nuclear Power Plant as Part of the Systematic Evaluation ProgramSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Earthquake
Backfit
ML19348A05431 August 1981Degraded Grid Protection for Class IE Power Sys,Oyster Creek Nuclear Power Station,Unit 1.
ML19351F44031 December 1980Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Progress Report,March-May 1980
ML20003F54620 April 1981Nonproprietary Version of Equipment Environ Qualification, Oyster Creek Plant, Final Technical Evaluation ReptSafe Shutdown
Boric Acid
ML20008F76630 April 1981Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating StationVeliger
ML20009E06017 July 1981Changes Report Number to NUREG/CR-1939,Volume 1, Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station
ML20009F16530 June 1981Degraded Grid Protection for Class IE Power Sys,Oyster Creek Nuclear Station Unit 1, Technical Evaluation Rept
ML20010A01731 May 1981Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for Oyster Creek Nuclear Power Plant. Setpoint Requirements Have Been Met
ML20010B39110 June 1981Draft Technical Evaluation:Sep Topic VI-4, Electrical, Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation.Reactor Vessel Water Level
ML20010D80431 July 1981Preliminary Adequacy of Station Electric Distribution Sys Voltages,Oyster Creek Nuclear Power Station, Technical Evaluation Rept
ML20027A90631 August 1982Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Oyster Creek Nuclear Generating Station, Technical Evaluation ReptFuel cladding
Power change
ML20027D22631 July 1982Restart of Core Spray & Low Pressure Coolant Injection Sys, NUREG-0737,Item II.K.3.21,Oyster Creek Nuclear Generating Station.
ML20049H96918 February 1982Comparison of Plant & Model Radiological Effluent Tech Specs,Gpu Nuclear Corp, Draft Radiological Effluent Tech Spec Implementation
ML20049J18721 May 1981Containment Leakage Rate Testing, Technical Evaluation Rept
ML20052B58128 April 1982Design Codes,Design Criteria, & Loading Combinations (SEP III-7.B) Jersey Central Power & Light Co,Oyster Creek Nuclear Generating Station, Technical Evaluation Rept
ML20052D48531 March 1982Draft SEP Structural Review of Oyster Creek Nuclear Power Plant Drywell Containment Structure Under Combined Loads.Safe Shutdown Earthquake
Finite Element Analysis
Earthquake
ML20052H43630 April 1982Restart of Core Spray & Low Pressure Coolant Injection Sys, NUREG-0737,Item II.K.3.21,Oyster Creek Nuclear Generating Station.
ML20053D21427 April 1982Control of Heavy Loads, Draft Technical Evaluation ReptSafe Shutdown
Nondestructive Examination
Control of Heavy Loads
ML20054E4188 June 1982Wind & Tornado Loadings (SEP III-2), Technical Evaluation ReptSafe Shutdown
ML20054L4969 June 1982Hydrological Considerations (SEP,II-3.A,B,B.1,3.C) Jcp&L, Oyster Creek Nuclear Power Plant, Revised Technical Evaluation ReptSafe Shutdown
Ultimate heat sink
Hydrostatic
Earthquake
ML20058B11730 June 1982Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Progress Report,September-November 1981
ML20062A48830 April 1982Safety Evaluation Rept,Pump & Valve Inservice Testing Program,Oyster Creek Nuclear Generating Station, Interim ReptStroke time
Scram Discharge Volume
Excess Flow Check Valve
Exemption Request
Power-Operated Valves
ML20063G77731 May 1982SEP Structural Review of Oyster Creek Nuclear Power Plant Drywell Containment Structure Under Combined LoadsSafe Shutdown Earthquake
Finite Element Analysis
Earthquake
ML20064K07830 June 1980Impure Water in Steam Generators & Isolation Generators, Informal Rept for Limited Distribution
ML20064L07127 January 1982Technical Evaluation Rept for BWR Scram Discharge Vol Long-Term Mods Oyster Creek Nuclear Generating StationShutdown Margin
Scram Discharge Volume
ML20065B85031 August 1982Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Progress Report,December 1981-Februaury 1982
ML20065U43531 October 1979Status of Evaluations & Mods of Diesel Generator Status Annunciator Sys at Various Us Nuclear Power Plants
ML20069G13430 November 1976Analysis of Populations of Boring & Fouling Organisms in Vicinity of Oyster Creek Nuclear Generating Station W/Discussion of Relevant Physical Parameters Over Period 760430-1130
ML20070J33130 November 1982Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Progress Report,March - May 1982Veliger
ML20070L73131 December 1982Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Docket No. 50-219.(General Public Utilities)
ML20071N26030 September 1982Inservice Insp Program, Technical Evaluation ReptHigh Radiation Area
Weld Overlay
Hydrostatic
Incorporated by reference
Dissimilar Metal Weld
ML20076C42327 January 1983ECCS Repts (F-47) TMI Action Plan Requirements,Jcp&L, Oyster Creek Nuclear Generating Station, Technical Evaluation Rept
ML20076J4036 April 1983RCS Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept
ML20079Q71210 June 1983Control of Heavy Loads (C-10),JCP&L Oyster Creek Nuclear Power Plant, Technical Evaluation ReptSafe Shutdown
Nondestructive Examination
Control of Heavy Loads
ML20080E26430 August 1983Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Oyster Creek Nuclear Generating Station, Technical Evaluation ReptSafe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
ML20082C08831 October 1983Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Final Report: September 1,1976 - December 31,1982Veliger
ML20083J32330 September 1983Technical Evaluation of Oyster Creek Plant Unique Analysis Repts
ML20092N65031 August 1983Technical Evaluation of Integrity of Oyster Creek Reactor Coolant Boundary Piping SysWeld Overlay
Operating Basis Earthquake
Nondestructive Examination
Pressure Boundary Leakage
Pressure boundary leak
Dissimilar Metal Weld
ML20093C7785 July 1984Evaluation of Spent Fuel Racks Structural Analysis,Oyster Creek Nuclear Generating Station, Technical Evaluation ReptSafe Shutdown Earthquake
Hydrostatic
Finite Element Analysis
Earthquake
ML20094L15520 July 1984Evaluation of Detailed Control Room Design Review Summary Rept for Oyster Creek Nuclear Generating Station, Final Technical Rept
ML20115A41711 January 1985Evaluation of Isolation Condenser Cracks at Oyster Creek Unit 1Hydrostatic
ML20126E9947 December 1982Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982