 Issue dateTitleTopic
ML19274D33031 October 1978Rept of Plant Start-up Following Third Refueling Outage Sept-Oct 1978. Assures That Unit 2 Refueling Outage Caused No Conditions or Sys Characteristics to Diminish Safe OperationShutdown Margin
Liquid penetrant
ML19332C82017 November 1989Rept of Plant Startup Following Seventh Refueling Outage, 870315-891010. W/891117 LtrShutdown Margin
ML19344D2635 March 1980Rept of Startup Following Third Refueling Outage,Sept 1979.Shutdown Margin
ML19345A82431 March 1980Rept of Plant Startup Following Fourth Refueling Outage, Mar 1980.Shutdown Margin
ML20027C32428 February 1982Rept of Plant Startup Following Fifth Refueling Outage, 820219Shutdown Margin
Post Accident Monitoring
Scram Discharge Volume
ML20039B6806 September 1981Primary Reactor Containment Integrated Leakage Rate Test Rept.
ML20041C8077 March 1981Rept of Plant Startup Following Fourth Refueling Outage, 810307.Shutdown Margin
Scram Discharge Volume
ML20062K24828 July 1980Primary Reactor Containment Integrated Leak Rate Test
ML20063J91910 February 1994Cycle 10 Startup ReptShutdown Margin
High Radiation Area
Stroke time
MELLLA
ML20072N74922 July 1975Noise Level Measurements Surveillance Test Results
ML20072N75530 April 1975Noise Level Measurements Surveillance Test Results
ML20072N76125 July 1974Noise Level Instruments Surveillance Test Results
ML20072N77024 February 1974Noise Level Measurements Surveillance Test Results
ML20072N77829 October 1974Noise Level Measurements Surveillance Test Results
ML20078S95016 December 1994PBAPS Cycle 11 Startup Rept for Unit 2Shutdown Margin
Grab sample
Stroke time
MELLLA
ML20079C95129 March 1991Reactor Containment Bldg Integrated Leak Rate Test ReptReactor Vessel Water Level
Packing leak
Temporary Modification
ML20080F98014 February 1983Rept of Plant Startup Following Fifth Refueling Outage, Feb 1983Shutdown Margin
ML20081B9874 April 1977Reactor Containment Bldg:Integrated Leakage Rate Test ReptReactor Vessel Water Level
ML20082B93917 July 1991Rept of Plant Start-Up Following Eighth Refueling Outage on 910112-0412.W/undated LtrShutdown Margin
ML20082G12323 August 1983Reactor Containment Bldg Integrated Leakage Rate Test Rept, Conducted During Aug 1983Scram Discharge Volume
ML20082N33831 December 1983HVAC Damper Program Penetration Seal Test Results & Exemption RequestsSafe Shutdown
Exemption Request
ML20084R2884 November 1983Fire Endurance & Hose Stream Tests on Wall Penetration Fire Stops Design WP694
ML20084R29216 February 1984Fire Endurance & Hose Stream Tests on Wall Penetration Fire Stops Design Wp 713
ML20084R30014 March 1984Fire Endurance & Hose Stream Tests on Floor Penetration Fire Stops Design Fc 350
ML20090L81324 December 1991Reactor Containment Bldg Integrated Leak Rate Test Rept
ML20092D70720 June 1984Ultrasonic Indications in Jet Pump Instrumentation Penetrations of Peach Bottom Atomic Power Station,Unit 3
ML20096B43131 December 1995Cycle 11 Startup ReptShutdown Margin
Grab sample
Stroke time
ML20101S94031 December 1991PBAPS Unit 2 Vessel Surveillance Matls Testing & Fracture Toughness Analysis
ML20126J82520 May 1985Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 24,Unit 2,3,Turbine Bldg El 116 Ft Common Equipment Area (Beneath Switchgear Rooms),Fire Area 78B
ML20126J84030 May 1985Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 51,Unit 2,3,Turbine Bldg El 135 Ft Corridor to Switchgear Rooms,Fire Area 78A
ML20126J85824 May 1985Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 91,Unit 2,3,Turbine Bldg El 118 Ft Radiation Chemistry Lab,Fire Area 78C
ML20126J88624 May 1985Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 92,Unit 2,3,Turbine Bldg El 116 Ft Conventional Chemistry Lab,Fire Area 78D
ML20126J90924 May 1985Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 93,Unit 2,3,Turbine Bldg El 116 Ft Health Physics Util Room,Fire Area 82
ML20126J92624 May 1985Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 94,Unit 2,3,Turbine Bldg El 116 Ft Counting Room,Fire Area 78E
ML20126J95224 May 1985Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 95,Unit 2,3,Turbine Bldg El 116 Ft Clean Clothes Room,Fire Area 114
ML20126J97624 May 1985Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 96,Unit 2,3,Turbine Bldg El 116 Ft Toilet Area,Fire Area 115
ML20126J99024 May 1985Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 97,Unit 2,3,Turbine Bldg El 116 Ft Janitor Room,Fire Area 116
ML20134A67524 January 1997Cycle 12 Startup Rept Unit 2Shutdown Margin
Stroke time
Minimum Critical Power Ratio
ML20135D54311 June 1985Reactor Containment Bldg Integrated Leakage Rate Test ReptReactor Vessel Water Level
Packing leak
ML20138Q97728 October 1985Rept of Plant Startup Following Sixth Refueling Outage, 840428-850713Shutdown Margin
Hydrostatic
Overtravel
ML20154C7106 May 1988Vessel Surveillance Matls Testing & Fracture Toughness Analysis
ML20155G19331 October 1988Rept on Restart Review Panel Assessment of Readiness for RestartSafe Shutdown
Fitness for Duty
High Radiation Area
Hydrostatic
Probabilistic Risk Assessment
Anchor Darling
Temporary Modification
Fire Watch
Scaffolding
Grace period
ML20155J84527 May 1988App R Multiple High Impedance Cable Fault Flame Test Rept
ML20202E62531 December 1998PBAPS Unit 2 Cycle 13 Startup Rept. withShutdown Margin
High Radiation Area
Stroke time
Coast down
ML20202H41431 January 1998Cycle 12 Startup Rept Unit 3Shutdown Margin
High Radiation Area
Stroke time
Minimum Critical Power Ratio
ML20238D86528 February 1985Hydrogen Water Chemistry Mini Test Final Rept. W/Two Oversize Drawings.Related Info Encl
ML20244C25731 January 1989Reactor Containment Bldg Integrated Leak Rate TestReactor Vessel Water Level
Scram Discharge Volume