Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-2004-245, Proposed License Amendment Request for Additional Information Response Define the Depth of the Required Tube Inspections and Clarify the Plugging Criteria within the Tubesheet Region of the Original Steam Generators13 February 2006Proposed License Amendment Request for Additional Information Response Define the Depth of the Required Tube Inspections and Clarify the Plugging Criteria within the Tubesheet Region of the Original Steam GeneratorsHydrostatic
Operating Basis Earthquake
L-2010-051, St. Lucie, Units 1 and 2, Response to Request for Additional Information - Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue11 March 2010St. Lucie, Units 1 and 2, Response to Request for Additional Information - Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing FatigueFitness for Duty
Exemption Request
Minimum staff
L-2011-406, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment Request12 October 2011Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment RequestAnticipated operational occurrence
Finite Element Analysis
Turbine Missile
L-2011-475, Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request31 October 2011Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request
L-2018-018, St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181)22 October 2018St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181)
ML0206405345 March 2002Request for Additional Information Regarding the 10 CFR Part 50, Appendix R, K1 Exemption Clarification/RequestSafe Shutdown
Exemption Request
ML02101017510 April 2002Request for Additional Information Regarding the Replacement of Reactor Coolant System Hot Leg Instrument Nozzle RC-126
ML0213403637 May 2002Request for Additional Information Related to the Staff'S Review of Severe Accident Mitigation Alternatives for St. Lucie, Units 1 & 2 (TAC Nos. MB3407and MB3411)
ML02203045618 July 2002Request for Additional Information, Review of Sections 2.0, 3.0, 4.0, & Appendix B of Application for Renewed Operating LicensesBoric Acid
Fire Barrier
Aging Management
ML02211016529 July 2002Request for Additional Information, Review of Sections 2.2, 2.3, & Appendix B of the Application for Renewed Operating Licenses for St. Lucie Units 1 & 2Safe Shutdown
Aging Management
Fire Protection Program
ML0227700134 October 2002Request for Additional Information, the 10 CFR Part 50, Appendix R, K1 Exemption Clarification/RequestSafe Shutdown
Exemption Request
ML02302061629 October 2002Request for Additional Information, Relocation of the Spent Fuel Crane TS Requirements
ML02304060831 October 2002Request for Additional Information Regarding Core Operating Limits Report
ML02317002213 November 2002Summary of Conference Calls with Florida Power and Light Regarding Reactor Vessel Head Inspection ResultsBoric Acid
ML02326026022 November 2002Request for Additional Information Regarding Bulletin 2002-01, 60-Day ResponseBoric Acid
VT-2
ML02351062017 December 2002RAI, Risk Informed Inservice Inspection
ML03030019430 January 2003Request for Additional Information Regarding Reduction in Minimum Reactor Coolant System Flow
ML03030057330 January 2003RAI, Request for Relief for Reactor Pressure Vessel Closure Head Penetration Welds.Nondestructive Examination
ML03058060526 February 2003Memo - Submission of Draft Request for Additional Information Regarding Risk Informed Inservice Inspection
ML03090007331 March 2003Request for Additional Information Regarding the Proposed Spent Fuel Pool Soluble Boron Credit Amendment
ML0309906689 April 2003RAI, Relief for Repair of Alloy 600 Small Bore Nozzles Without Flaw Removal
ML03111004918 April 2003RAI, Relaxation from Inspection Requirements of Order EA-03-009
ML0312702877 May 2003Submission of Draft Request for Additional Information and Summary of a Conference Call Regarding Steam Generator Tubesheet AmendmentNondestructive Examination
ML03203051622 July 2003Request for Additional Information Regarding License Amendment Requests for Increasing Spent Fuel Storage CapacityControl of Heavy Loads
ML0321300021 August 2003Request for Additional Information Regarding the Resolution of Generic Letter 69-06 Waterhammer Issues
ML03233000621 August 2003Second Request for Additional Information Regarding the Proposed Spent Fuel Pool Soluble Boron Credit Amendment
ML03273091829 September 2003Notification of St. Lucie Nuclear Plant - Safety System Design and Performance Capability Inspection - NRC Inspection Report 05000335/2003009 and 05000389/2003009Probabilistic Risk Assessment
Temporary Modification
Job Performance Measure
Maintenance Rule Program
ML0330800144 November 2003Request for Additional Information Regarding License Amendment Requests for Increasing Spent Fuel Storage Capacity
ML0331000046 November 2003Saint Lucie Plant, Unit 1 - Request for Additional Information Regarding Relief Request No. 19Large early release frequency
ML03358000223 December 2003St. Lucie Plant, Unit 1 - Second Request for Additional Information Regarding Relief Request No. 19
ML0405604541 March 2004RAI, Alternative Visual Examination of Inaccessible Insulated Components During System Pressure Tests
ML04076086018 March 2004Request for Additional Information, Relief Request No. 22Nondestructive Examination
ML0409902758 April 2004First Revised Order EA-03-009 Relaxation Requests RAI
ML04111091120 April 2004Request for Additional Information, Steam Generator Inspection Reports, Spring 2003
ML04182024224 June 20046/24/04, St. Lucie, Units 1 & 2 - Request for Additional Information Regarding Control Room Ventilation System and Miscellaneous Minor Technical Specification ChangesRecently irradiated fuel
ML0419603929 July 2004Request for Additional Information, Revising the Licensing Bases to Utilize the Alternate Source TermOffsite Dose Calculation Manual
ML04203044028 June 2004RAI, Security Plan Sections 1-9
ML04219046623 July 2004RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan
ML0422401966 August 2004RAI, Risk Informed Inservice Inspection Relief Request Third 10-year Inservice Inspection Program Relief Request No. 2Large early release frequency
Dissimilar Metal Weld
ML04229054016 August 2004RAI, Relaxation and Enforcement Discretion from the Fitness-For-Duty Order for Nuclear Force PersonnelEnforcement Discretion
ML04286041212 October 2004RAI Regarding Requests for Relaxation from Inspection Requirements of Order EA-03-009Nondestructive Examination
ML05081057921 March 2005RAI, ECCS and CSS Recirculation Functions Compliancy (TAC No. Mb 9605, MB9606)
ML0515201832 June 2005Request for Additional Information, Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.
ML05189027812 July 2005RAI MC6764, SL1-19 Steam Generator Tube Inservice Inspection Special Report
ML05221006512 August 2005RAI, SG Repair Using Westinghouse Alloy 800 Leak Limiting Sleeves
ML05221036811 August 2005RAI, Relief Request No. 26 on Alloy 600 Nozzle Repair/ Replacement Programs (Tac No. MC6944)
ML05272010130 September 2005Second Request for Additional Information Regarding Relief Request No. 26 - Repair of Alloy 600 Small Bore Nozzles Without Flaw Removal
ML05320012923 November 2005RAI, Second RAI to Define the Depth of Required Tube Inspections and Clarify the Plugging Criteria within the Tubesheet Region of the Original Steam Generators
ML0603205926 February 2006Request for Additional Information Proposed Amendment for Reduced Reactor Coolant System FlowBoric Acid
Loop seal
ML0603703968 February 2006RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water ReactorsMission time
Coatings
Scaffolding