Issue date | Title | Topic | |
---|---|---|---|
L-2004-245, Proposed License Amendment Request for Additional Information Response Define the Depth of the Required Tube Inspections and Clarify the Plugging Criteria within the Tubesheet Region of the Original Steam Generators | 13 February 2006 | Proposed License Amendment Request for Additional Information Response Define the Depth of the Required Tube Inspections and Clarify the Plugging Criteria within the Tubesheet Region of the Original Steam Generators | Hydrostatic Operating Basis Earthquake |
L-2010-051, St. Lucie, Units 1 and 2, Response to Request for Additional Information - Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue | 11 March 2010 | St. Lucie, Units 1 and 2, Response to Request for Additional Information - Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue | Fitness for Duty Exemption Request Minimum staff |
L-2011-406, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment Request | 12 October 2011 | Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment Request | Anticipated operational occurrence Finite Element Analysis Turbine Missile |
L-2011-475, Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request | 31 October 2011 | Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request | |
L-2018-018, St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) | 22 October 2018 | St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) | |
ML020640534 | 5 March 2002 | Request for Additional Information Regarding the 10 CFR Part 50, Appendix R, K1 Exemption Clarification/Request | Safe Shutdown Exemption Request |
ML021010175 | 10 April 2002 | Request for Additional Information Regarding the Replacement of Reactor Coolant System Hot Leg Instrument Nozzle RC-126 | |
ML021340363 | 7 May 2002 | Request for Additional Information Related to the Staff'S Review of Severe Accident Mitigation Alternatives for St. Lucie, Units 1 & 2 (TAC Nos. MB3407and MB3411) | |
ML022030456 | 18 July 2002 | Request for Additional Information, Review of Sections 2.0, 3.0, 4.0, & Appendix B of Application for Renewed Operating Licenses | Boric Acid Fire Barrier Aging Management |
ML022110165 | 29 July 2002 | Request for Additional Information, Review of Sections 2.2, 2.3, & Appendix B of the Application for Renewed Operating Licenses for St. Lucie Units 1 & 2 | Safe Shutdown Aging Management Fire Protection Program |
ML022770013 | 4 October 2002 | Request for Additional Information, the 10 CFR Part 50, Appendix R, K1 Exemption Clarification/Request | Safe Shutdown Exemption Request |
ML023020616 | 29 October 2002 | Request for Additional Information, Relocation of the Spent Fuel Crane TS Requirements | |
ML023040608 | 31 October 2002 | Request for Additional Information Regarding Core Operating Limits Report | |
ML023170022 | 13 November 2002 | Summary of Conference Calls with Florida Power and Light Regarding Reactor Vessel Head Inspection Results | Boric Acid |
ML023260260 | 22 November 2002 | Request for Additional Information Regarding Bulletin 2002-01, 60-Day Response | Boric Acid VT-2 |
ML023510620 | 17 December 2002 | RAI, Risk Informed Inservice Inspection | |
ML030300194 | 30 January 2003 | Request for Additional Information Regarding Reduction in Minimum Reactor Coolant System Flow | |
ML030300573 | 30 January 2003 | RAI, Request for Relief for Reactor Pressure Vessel Closure Head Penetration Welds. | Nondestructive Examination |
ML030580605 | 26 February 2003 | Memo - Submission of Draft Request for Additional Information Regarding Risk Informed Inservice Inspection | |
ML030900073 | 31 March 2003 | Request for Additional Information Regarding the Proposed Spent Fuel Pool Soluble Boron Credit Amendment | |
ML030990668 | 9 April 2003 | RAI, Relief for Repair of Alloy 600 Small Bore Nozzles Without Flaw Removal | |
ML031110049 | 18 April 2003 | RAI, Relaxation from Inspection Requirements of Order EA-03-009 | |
ML031270287 | 7 May 2003 | Submission of Draft Request for Additional Information and Summary of a Conference Call Regarding Steam Generator Tubesheet Amendment | Nondestructive Examination |
ML032030516 | 22 July 2003 | Request for Additional Information Regarding License Amendment Requests for Increasing Spent Fuel Storage Capacity | Control of Heavy Loads |
ML032130002 | 1 August 2003 | Request for Additional Information Regarding the Resolution of Generic Letter 69-06 Waterhammer Issues | |
ML032330006 | 21 August 2003 | Second Request for Additional Information Regarding the Proposed Spent Fuel Pool Soluble Boron Credit Amendment | |
ML032730918 | 29 September 2003 | Notification of St. Lucie Nuclear Plant - Safety System Design and Performance Capability Inspection - NRC Inspection Report 05000335/2003009 and 05000389/2003009 | Probabilistic Risk Assessment Temporary Modification Job Performance Measure Maintenance Rule Program |
ML033080014 | 4 November 2003 | Request for Additional Information Regarding License Amendment Requests for Increasing Spent Fuel Storage Capacity | |
ML033100004 | 6 November 2003 | Saint Lucie Plant, Unit 1 - Request for Additional Information Regarding Relief Request No. 19 | Large early release frequency |
ML033580002 | 23 December 2003 | St. Lucie Plant, Unit 1 - Second Request for Additional Information Regarding Relief Request No. 19 | |
ML040560454 | 1 March 2004 | RAI, Alternative Visual Examination of Inaccessible Insulated Components During System Pressure Tests | |
ML040760860 | 18 March 2004 | Request for Additional Information, Relief Request No. 22 | Nondestructive Examination |
ML040990275 | 8 April 2004 | First Revised Order EA-03-009 Relaxation Requests RAI | |
ML041110911 | 20 April 2004 | Request for Additional Information, Steam Generator Inspection Reports, Spring 2003 | |
ML041820242 | 24 June 2004 | 6/24/04, St. Lucie, Units 1 & 2 - Request for Additional Information Regarding Control Room Ventilation System and Miscellaneous Minor Technical Specification Changes | Recently irradiated fuel |
ML041960392 | 9 July 2004 | Request for Additional Information, Revising the Licensing Bases to Utilize the Alternate Source Term | Offsite Dose Calculation Manual |
ML042030440 | 28 June 2004 | RAI, Security Plan Sections 1-9 | |
ML042190466 | 23 July 2004 | RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan | |
ML042240196 | 6 August 2004 | RAI, Risk Informed Inservice Inspection Relief Request Third 10-year Inservice Inspection Program Relief Request No. 2 | Large early release frequency Dissimilar Metal Weld |
ML042290540 | 16 August 2004 | RAI, Relaxation and Enforcement Discretion from the Fitness-For-Duty Order for Nuclear Force Personnel | Enforcement Discretion |
ML042860412 | 12 October 2004 | RAI Regarding Requests for Relaxation from Inspection Requirements of Order EA-03-009 | Nondestructive Examination |
ML050810579 | 21 March 2005 | RAI, ECCS and CSS Recirculation Functions Compliancy (TAC No. Mb 9605, MB9606) | |
ML051520183 | 2 June 2005 | Request for Additional Information, Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. | |
ML051890278 | 12 July 2005 | RAI MC6764, SL1-19 Steam Generator Tube Inservice Inspection Special Report | |
ML052210065 | 12 August 2005 | RAI, SG Repair Using Westinghouse Alloy 800 Leak Limiting Sleeves | |
ML052210368 | 11 August 2005 | RAI, Relief Request No. 26 on Alloy 600 Nozzle Repair/ Replacement Programs (Tac No. MC6944) | |
ML052720101 | 30 September 2005 | Second Request for Additional Information Regarding Relief Request No. 26 - Repair of Alloy 600 Small Bore Nozzles Without Flaw Removal | |
ML053200129 | 23 November 2005 | RAI, Second RAI to Define the Depth of Required Tube Inspections and Clarify the Plugging Criteria within the Tubesheet Region of the Original Steam Generators | |
ML060320592 | 6 February 2006 | Request for Additional Information Proposed Amendment for Reduced Reactor Coolant System Flow | Boric Acid Loop seal |
ML060370396 | 8 February 2006 | RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors | Mission time Coatings Scaffolding |