Request for Additional Information, Steam Generator Inspection Reports, Spring 2003
ML041110911
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/20/2004
From: Moroney B
NRC/NRR/DLPM/LPD2
To: Stall J
Florida Power & Light Co
Moroney B, NRR/DLPM, 415-3974
References
TAC MC1401
Download: ML041110911 (4)


Text

April 20, 2004 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

ST. LUCIE PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING THE ST. LUCIE UNIT 2 SPRING 2003 STEAM GENERATOR INSPECTION REPORTS (TAC NO. MC1401)

Dear Mr. Stall:

Following the St. Lucie Unit 2 spring 2003 steam generator (SG) inspection, Florida Power and Light Company (FPL, the licensee) submitted a 15-day SG tube plugging report, pursuant to Section 4.4.5.5.a of the Unit 2 Technical Specifications (TSs), by letter dated May 26, 2003. By letter dated July 21, 2003, FPL submitted, in accordance with Nuclear Energy Institute 97-06, a SG report regarding its condition monitoring and preliminary operational assessments. By letter dated November 21, 2003, the licensee submitted a 12-month SG tube inservice inspection special report, pursuant to Sections 4.4.5.5.b and 6.9.2 of the Unit 2 TSs.

The U. S. Nuclear Regulatory Commission staff has reviewed your submittals and finds that a response to the enclosed request for additional information is needed before we can complete the review. This request was discussed with your staff on March 11, 2004, and Mr. George Madden agreed that a response would be provided by May 28, 2004.

If you have any questions, please feel free to contact me at 301-415-3974.

Sincerely,

/RA/

Brendan T. Moroney, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-389

Enclosure:

As stated cc w/encl: See next page

ML041110911

  • Concurred by memo NRR-088 OFFICE PDII-2/PM PDII-2/NSPDP PDII-2/LA SPSB/SC PDII-2/SC NAME BMoroney LMiller BClayton SDennig*

WBurton DATE 4/19/04 4/19/04 4/19/04 2/27/04 4/19/02

Enclosure REQUEST FOR ADDITIONAL INFORMATION ST. LUCIE UNIT 2 REVIEW OF STEAM GENERATOR REPORTS RELATED TO SPRING 2003 STEAM GENERATOR INSPECTION 1.

Were cracks detected in any wear scars located in the U-bend region? If so, please describe the inspection findings in detail (e.g., tube identifier, flaw location, etc.). In addition, describe the corrective actions taken (e.g., inspection scope expansion, etc.)

and the basis for these corrective actions.

2.

Are wear scars located in other regions of the steam generators (e.g., tube support plates and eggcrates) inspected with a rotating probe to determine whether cracking is present at the same location? If not, how are cracks in wear scars differentiated from wear scars in these locations?

3.

Were any cracks detected in dings greater than 5 volts? If so, describe the inspection findings in detail (e.g., tube identifier, ding location, ding size, and method of flaw detection [bobbin and/or rotating probe]). In addition, describe the corrective actions taken (e.g., inspection scope expansion, etc.) and the basis for these corrective actions.

4.

Single axial indications were detected in steam generator 2B near the diagonal bars on the hot leg (DHB) (e.g., DHB + 2.09 and DHB + 1.63). Please discuss these indications in more detail, including, identifying whether they are located in the freespan, how they were detected (i.e., bobbin and/or rotating probe), the severity of these indications, whether axial flaws near a DHB has previously been identified at St. Lucie 2, other relevant details (if any) and whether an inspection scope expansion was necessary.

Mr. J. A. Stall ST. LUCIE PLANT Florida Power and Light Company cc:

Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, Florida 34957 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi, Senior Attorney Florida Power & Light Company 801 Pennsylvania Avenue, NW Suite 220 Washington, DC 20004 Mr. Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. William Jefferson, Jr.

Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000 Mr. G. L. Johnston Plant General Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Mr. Terry Patterson Licensing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 David Moore, Vice President Nuclear Operations Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. J. Kammel Radiological Emergency Planning Administrator Department of Public Safety 6000 SE. Tower Drive Stuart, Florida 34997