Letter Sequence RAI |
---|
|
|
MONTHYEARML0232603672002-11-22022 November 2002 Withholding from Public Disclosure, Holtec Report HI-2022882, MB6627 & MB6628 Project stage: Other ML0302105612003-01-22022 January 2003 Ltr, Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing to Revise TSs to Include the Design of a New Cask.. Project stage: Other ML0320305162003-07-22022 July 2003 Request for Additional Information Regarding License Amendment Requests for Increasing Spent Fuel Storage Capacity Project stage: RAI ML0330800142003-11-0404 November 2003 Request for Additional Information Regarding License Amendment Requests for Increasing Spent Fuel Storage Capacity Project stage: RAI ML0332801672003-11-21021 November 2003 Holtec International Request for Withholding Information from Public Disclosure for St. Lucie, Units 1 & 2 Project stage: Withholding Request Acceptance ML0419200092004-07-0202 July 2004 EA, Addition of Cask Pit Area Fuel Storage Racks Project stage: Other ML0419604392004-07-0909 July 2004 Tech Spec Page for Amendment No. 135, Addition of Spent Fuel Pool Cask Pit Storage Racks Project stage: Other ML0419604382004-07-0909 July 2004 Tech Spec Page for Amendment No. 192, Addition of Spent Fuel Pool Cask Pit Storage Racks Project stage: Other 2003-11-04
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22325A0692022-11-18018 November 2022 RAI Set 4 ML22270A1482022-09-26026 September 2022 SLRA Second Round RAI Letter 2 - Class 1 Fatigue (Final) ML22217A0022022-08-0404 August 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 1) ML22217A0032022-08-0404 August 2022 SLRA Second Round RAI Letter 1) ML22193A0872022-07-11011 July 2022 Letter RAI Set 3 (Final) ML22133A0032022-05-12012 May 2022 SLRA Rai'S Set 1 ML22101A2322022-05-0202 May 2022 Summary of the Environmental Remote Audit Related to the Review of the Subsequent License Renewal Application Enclosure RCIs and RAIs ML22094A1672022-04-0101 April 2022 2022 St. Lucie POV Inspection Information Request ML22075A1212022-03-16016 March 2022 Stl Problem Identification and Resolution (Pi&R) Information Request Final Report ML21350A4262021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Licensing Amendment Request Concerning Technical Specification Conversion to NUREG-1432, Revision 5 ML21119A3142021-04-28028 April 2021 Requests for Additional Information Regarding License Amendment Requests to Apply Risk Informed Completion Times (RICT) for the 120-Volt AC (EPID L-2020-LLA-0283) (Email) ML21063A3192021-03-0404 March 2021 Request for Additional Information Regarding Relief Request RR 15 - Extension of RPV Welds from 10 to 20 Years ML20092G3442020-04-0101 April 2020 RAIs for LAR to Revise Technical Specifications 6.8.4.o, Reactor Coolant Pump Flywheel Inspection Program ML20094G2022020-03-30030 March 2020 Request for Additional Information Regarding License Amendment Request to Adopt EAL Schemes Pursuant to NEI 99-01 (L-2019-LLA-0210) ML19225D3152019-08-13013 August 2019 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Bypass Devices (L-2019-LLA-0106) ML19218A2742019-08-0606 August 2019 Notification of Inspection and Request for Information ML19193A1982019-07-12012 July 2019 Emailed St. Lucie Heat Sink RFI ML19192A1372019-07-11011 July 2019 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Unit No. 2, Fall 2018 Refueling Outage Steam Generator Tube Inspection Report ML19192A1352019-06-25025 June 2019 NRR E-mail Capture - Draft Request for Additional Information - St. Lucie Plant, Unit No. 2, Fall 2018 Refueling Outage Steam Generator Tube Inspection Report ML19151A8312019-05-31031 May 2019 NRR E-mail Capture - St. Lucie Plant, Unit Nos. 1 and 2, Request for Additional Information Regarding Emergency Diesel Generator Surveillance Requirement Amendment Request ML19151A5092019-05-21021 May 2019 NRR E-mail Capture - Draft Request for Additional Information - St. Lucie Plant, Unit Nos. 1 and 2 Emergency Diesel Generator Surveillance Requirement Amendment Request ML19109A1392019-04-18018 April 2019 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding the License Amendment Request Pertaining to the Iodine Removal System ML19053A2242019-02-0101 February 2019 NRR E-mail Capture - St. Lucie Plant Unit No. 1 - Draft Request for Additional Information Related to Relief Request 6 Regarding the Refueling Water Tank Bottom Liner L-2018-018, St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181)2018-10-22022 October 2018 St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) ML18296A2052018-10-22022 October 2018 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) ML18197A4112018-08-0101 August 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Reduce the Number of Control Element Assemblies ML18019A0712018-01-18018 January 2018 NRR E-mail Capture - Request for Additional Information - St. Lucie Inop AFW Steam Supply LAR (L-2017-LLA-0296) ML17331B1532017-11-27027 November 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie IST Relief Request #5 - PR-01 (L-2017-LLR-0113) ML17277A3692017-10-0404 October 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie Rict LAR - MF5372/MF5373 ML17152A1842017-06-0101 June 2017 Request for Additional Information - RPS Rate of Change and LCO Change LAR (CACs MF9119 9120) ML16356A1432016-12-20020 December 2016 Notification of Inspection and Request for Information ML16326A0092016-11-18018 November 2016 NRR E-mail Capture - Request for Additional Information Re. Nextera/Fpl LAR to Adopt TSTF-545 - CACs MF8203, MF8204, MF8208, and MF8209 ML16308A3232016-11-0303 November 2016 NRR E-mail Capture - Request for Additional Information - St. Lucie EDG Day Tank LAR - MF8006 ML16292A8212016-10-14014 October 2016 Emergency Preparedness Inspection and Request for Information ML17003A0452016-10-11011 October 2016 NRR E-mail Capture - (External_Sender) FW: St. Lucie Response to RAI on SL2-22 SG Tube Inspection Report (MF7604) ML16244A2602016-08-26026 August 2016 Notification of Inspection and Request for Information ML16155A3502016-06-0303 June 2016 Notification of Inspection and Request for Information ML16089A0052016-03-28028 March 2016 NRR E-mail Capture - Request for Additional Information - St. Lucie Srxb Mtc Surv - MF7269 & MF7270 ML16077A1062016-03-17017 March 2016 NRR E-mail Capture - Request for Additional Information - St Lucie Vacuum Gothic LAR - MF6980/MF6981 ML16068A2612016-03-0808 March 2016 NRR E-mail Capture - Request for Additional Information - St Lucie TSTF-422 - MF6683/MF6684 ML16068A0412016-03-0808 March 2016 NRR E-mail Capture - Request for Additional Information - St Lucie Unit 1 Relief Request No. 10 - MF6685 ML16013A2152016-01-13013 January 2016 NRR E-mail Capture - St. Lucie RAIs (Rvi Aging Management Plan) MF6777 and MF6778 ML15336A8882015-12-16016 December 2015 Request for Additional Information Regarding License Amendment Request for Changes to the Snubber Surveillance Requirements ML15308A6152015-11-23023 November 2015 Request for Additional Information on License Amendment Request for Changes to the Required Actions for Inoperability of Auxiliary Feedwater Pumps ML15233A0362015-09-0404 September 2015 Redacted Request for Additional Information Regarding Proposed License Amendment Request and Exemption Request to Allow the Transition to Areva Fuel 2023-08-31
[Table view] |
Text
July 22, 2003 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
SAINT LUCIE PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUESTS FOR INCREASING SPENT FUEL STORAGE CAPACITY (TAC NOS. MB6627 AND MB6628)
Dear Mr. Stall:
By letter dated October 23, 2002, Florida Power and Light Company submitted a request to revise the St. Lucie, Units 1 and 2, Technical Specifications to include the design of a new cask pit spent fuel storage rack for each unit in order to increase each units spent fuel storage capacity.
The U.S. Nuclear Regulatory Commission staff has reviewed your submittal and finds that a response to the enclosed request for additional information (RAI) is needed before we can complete the review. This request was discussed with your staff on July 16, 2003, and Mr. Ken Frehafer agreed that a response would be provided by August 31, 2003.
If you have any questions, please feel free to contact me at (301) 415-3974.
Sincerely,
/RA/
Brendan T. Moroney, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-335 and 50-389
Enclosure:
RAI cc w/encl: See next page
ML032030516 OFFICE PDII-2/Intern PDII-2/PM PDII-2/LA PDII-2/SC NAME MDudek BMoroney BClayton AHowe DATE 7/17/03 7/17/03 7/17/03 7/22/03 REQUEST FOR ADDITIONAL INFORMATION ADDITION OF SPENT FUEL POOL CASK AREA RACK AMENDMENT FLORIDA POWER AND LIGHT SAINT LUCIE PLANT, UNITS 1 AND 2 DOCKET NOS. 50-335 AND 50-389
- 1) Describe how the capability to remove fuel from the spent fuel pool (SFP) will be assured with licensed fuel storage in the new cask area fuel storage rack.
- 2) The submittal states that the proposed change in the design basis will be consistent with the Standard Review Plan (SRP), which requires a bulk spent fuel pool design temperature of 140EF to provide margin with a design basis of partial core offloads. The submittal assumes 150EF. Provide justification for the deviation.
- 3) The submittal proposes to change the design basis to be a partial core offload. It also proposes to reduce the core offload time after shutdown from 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> to 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />.
A review of SRP Section 9.1.3.III.1.h indicates that spent fuel pool heat loads associated with both partial and full-core offloads are calculated based on 150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> decay. At the reduced offload time the current licensing basis can be maintained for the partial-core offload, but may not be maintained in the case of a planned full-core offload. While not routine, full-core offloads are periodically necessary and are performed during planned outages. The current licensing basis for Unit 2 as stated in Updated Final Safety Analysis Report (UFSAR) Section 9.1.3.1, requires outage-specific calculations to demonstrate that the spent fuel pool bulk water temperature will not exceed the St. Lucie Design-Basis temperature of 150EF with one Spent Fuel Cooling System pump and one heat exchanger in operation for refueling evolutions that propose to utilize a full-core offload (UFSAR Section 9.1.3.1). Please explain how the design basis related to bulk pool temperature will be maintained for refueling evolutions that propose to utilize a full-core offload for Unit 1.
- 4) Explain if using a 90-day operation time is more conservative than the 36-day operation time used in the SRP, Scenario 3. If it is not conservative, provide the maximum bulk SFP temperature for an emergency full-core offload having 36 days operation time since the previous refueling outage for each unit.
- 5) Provide the flow rates for the SFP make-up sources.
- 6) The submittal states in several areas that certain crane features are in accordance with NUREG-0612 , "Control of Heavy Loads at Nuclear Power Plants." It also states several changes will be made, including increased crane capacity and replacement or upgrade to single failure proof cranes. Identify any upgrades or replacements necessary for this license amendment.
Enclosure
- 7) The submittal identified crane features that follow the approach of NUREG-0612.
Please explain any deviations from the NUREG-0612 guidance.
- 8) The submittal states that safe-load paths will be established for loads, specifically the spent fuel racks in and out of the cask pits. Explain the guidelines for establishing safe-load paths. In particular, address if the load could travel over spent fuel, any safety-related equipment, or any part of the spent fuel pool (e.g., weir wall).
- 9. The proposed amendment described the methodology used to calculate the maximum effective multiplication factor (keff). The staff has outlined two acceptable methodologies to perform spent fuel pool criticality analyses in a letter entitled "Guidance on the Regulatory Requirements for Criticality Analysis of Fuel Storage at Light-Water Reactor Power Plants," from L. Kopp to T. Collins dated August 19, 1998.
The two methodologies are (1) a worst-case combination with mechanical and material conditions set to maximize keff, or (2) a sensitivity study of the reactivity effects of the tolerance variations. The proposed amendment is unclear on which methodology was used. Identify which methodology was employed to calculate the maximum keff.
- 10. The submittal indicates that maximum effective multiplication factors were calculated by statistically combining all of the tolerances and uncertainties for each of the St. Lucie cask pits with the new racks present and loaded. However, the submittal does not contain the equations used to calculate these values. Please provide the equations used to perform the keff calculations and a detailed quantitative example demonstrating how each of the tolerances and uncertainties were accounted for in the calculation. The response should include a detailed description of the statistical methods employed and the values used in the calculation of any statistical uncertainties.
- 11. The submittal identifies the worst possible moderation condition as a spent fuel pool temperature of 50°F (10°C) due to a negative moderator temperature coefficient. The maximum density of water occurs at 39.2°F (4°C). Provide justification for selection of a higher temperature (i.e., lower density) as the worst possible moderation condition.
- 12. Section 4.2.4.3 of the supporting Holtec report provided a table identifying the principal core operating parameters used to analyze the burn-up calculations for the St. Lucie, Unit 2, spent fuel assemblies. The submittal did not identify how these values represented the most limiting conditions (resulting in the highest residual reactivity) of the spent fuel to be stored in the cask pit racks. Please provide a detailed justification for each of the values provided, demonstrating how they result in the most limiting reactivity conditions of the spent fuel.
- 13. The submittal described a limitation of the Monte Carlo N-Particle Transport Code (MCNP) calculations that prevented modeling some fission product nuclides in the criticality analyses, and described a process to calculate an equivalent amount of boron that provides nearly the same reactivity in MCNP as the CASMO4 results. The submittal stated that this process would compensate for the inability to model these nuclides. Please provide detailed technical information demonstrating that this alternate methodology is conservative or provides bounded results.
- 14. The submittal identified the most limiting postulated accident condition as the misplacement of a fresh fuel assembly into a location intended for storage of a spent fuel assembly. The description of the analysis only includes a discussion of the maximum effective multiplication factor obtained. Please provide a detailed description of the following: (1) the assumptions used in the analysis, (2) how each assumption represents the most bounding or limiting condition, (3) the biases and uncertainties included in the analysis, (4) how each bias or uncertainty was accounted for, (5) how the data was evaluated, and (6) how this analysis varies from the currently licensed worst-case misplacement accident in the spent fuel pool.
- 15. A 5 percent uncertainty in fuel density was assumed when performing the Unit 1 cask pit criticality analysis; however, only 1 percent uncertainty was assumed in the Unit 2 analysis. The reduced uncertainty will result in lower residual reactivities in the spent fuel. Please provide a detailed justification for the values assumed in each of the analyses and the basis for the differences.
- 16. The references ([1], [2],...) located within the licensees submittal Sections 4.1 and 4.2 do not correlate to the references listed in section 4.3. Provide a revised list of references to correctly identify the appropriate documents.
- 17. The current St. Lucie, Unit 2, spent fuel racks have a nominal 8.96-inch center-to-center distance between the fuel assemblies; however, the proposed amendment calls for a nominal 8.80-inch center-to-center distance between fuel assemblies placed in the cask pit storage rack. Please describe the basis for the reduced spacing and discuss how the change was accounted for in the reactivity calculations.
- 18. Section 3.2 of the amendment request states, "...the Unit 1 rack cells employ Boral neutron absorber panels mounted on the outside faces of stainless steel boxes...
(except cells on the rack periphery which contain no Boral panel on the outer face)...."
The licensees criticality analysis assumed an infinite array of storage cells. This array assumed the presence of two Boral panels between adjacent assemblies. The lack of a Boral panel on the outside periphery of the rack may result in greater neutron coupling between the cask pit racks and adjacent spent fuel pool racks. Please provide a detailed description, explaining why greater neutron coupling will not occur with racks adjacent to the cask pit racks, or submit a criticality analysis to evaluate this condition.
Additionally, please perform the same evaluation and provide the same requested information for the Unit 2 spent fuel pool.
- 19. The criticality analysis assumed a minimum Boral density as an uncertainty of the analysis. Please provide a detailed description of the surveillance program that will be used to monitor the installed Boral panels to verify they will continue to meet this limit in the future. Additionally, demonstrate that the surveillance program schedule will be sufficient to identify the depletion of the Boral panels before the boron density decreases below the value assumed in the criticality analysis.
- 20. The application indicates that materials containing boron will be part of the design of the spent fuel storage racks that will be installed in the cask area. The application does not address the potential increase in tritium that might be produced by neutron capture of boron-10 and released in liquid effluent pathways from the plant. Identify how much
additional tritium is expected to be produced and released. Describe the significance of any estimated increase.
- 21. The additional stored spent fuel will increase the amount of heat being removed from the water in the spent fuel pool and cask area. Specify how much additional heat will be released to the cooling canal. Explain the significance of any estimated increase.
- 22. According to Section 9.6 of the application, all spent fuel and spent fuel storage racks will be removed from the cask pit before a cask is brought into the pit. State whether this restriction is formalized in an administrative control. If so, describe how will this restriction be formalized.
- 23. Section 3.7, "Radiological Considerations," indicates that the radiological consequences of a fuel-handling accidents are discussed in the Unit 1 and 2 UFSAR fuel-handling accident analyses. In Table 15.4.1-7 of the Unit 1 UFSAR, the control room thyroid dose resulting from the fuel-handling accident is different from the dose stated in the analyses supporting the requests for amendment dated October 30, 2000 (Amendment 172), and May 23, 2002 (Amendment 184). Please clarify.
Mr. J. A. Stall ST. LUCIE PLANT Florida Power and Light Company cc:
Senior Resident Inspector Mr. R. E. Rose St. Lucie Plant Plant General Manager U.S. Nuclear Regulatory St. Lucie Nuclear Plant Commission 6351 South Ocean Drive P.O. Box 6090 Jensen Beach, Florida 34957 Jensen Beach, Florida 34957 Mr. Terry Patterson Craig Fugate, Director Licensing Manager Division of Emergency St. Lucie Nuclear Plant Preparedness 6351 South Ocean Drive Department of Community Affairs Jensen Beach, Florida 34957 2740 Centerview Drive Tallahassee, Florida 32399-2100 Vice President, Nuclear Operations Support M. S. Ross, Attorney Florida Power & Light Company Florida Power & Light Company P.O. Box 14000 P.O. Box 14000 Juno Beach, FL 33408-0420 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Mr. Douglas Anderson Vice President - Nuclear County Administrator Engineering St. Lucie County Florida Power & Light Company 2300 Virginia Avenue P.O. Box 14000 Fort Pierce, Florida 34982 Juno Beach, FL 33408-0420 Mr. William A. Passetti, Chief Mr. J. Kammel Department of Health Radiological Emergency Bureau of Radiation Control Planning Administrator 2020 Capital Circle, SE, Bin #C21 Department of Public Safety Tallahassee, Florida 32399-1741 6000 SE. Tower Drive Stuart, Florida 34997 Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957