ML032330006

From kanterella
Jump to navigation Jump to search

Second Request for Additional Information Regarding the Proposed Spent Fuel Pool Soluble Boron Credit Amendment
ML032330006
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/21/2003
From: Moroney B
NRC/NRR/DLPM/LPD2
To: Stall J
Florida Power & Light Co
Moroney B, NRR/DLPM, 415-3974
References
TAC MB6864
Download: ML032330006 (5)


Text

August 21, 2003 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

SAINT LUCIE PLANT, UNIT 1 - SECOND REQUEST FOR ADDITIONAL INFORMATION REGARDING THE PROPOSED SPENT FUEL POOL SOLUBLE BORON CREDIT AMENDMENT (TAC NO. MB6864)

Dear Mr. Stall:

By letter dated November 25, 2002, Florida Power and Light Company (FPL) submitted a request to amend Facility Operating License DPR-67 for Saint Lucie Unit 1. The proposed amendment would eliminate the need to credit Boraflex' neutron absorbing material for reactivity control in the Unit 1 spent fuel pool and credit a combination of soluble boron and fuel position within the storage racks to maintain reactivity within the effective neutron multiplication factor limits of Title 10 of the Code of Federal Regulation, Section 50.68.

The U.S. Nuclear Regulatory Commission staff issued a request for additional information (RAI) on March 31, 2003, and FPL provided a response on May 14, 2003. The staff reviewed the May 14, 2003, response and identified the need for additional clarifying and supporting information. A response to the enclosed RAI is needed before we can complete the review.

This request was discussed with your staff on August 15, 2003, and Mr. Ken Frehafer agreed that a response would be provided by September 30, 2003.

If you have any questions, please feel free to contact me at (301) 415-3974.

Sincerely,

/RA/

Brendan T. Moroney, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-335

Enclosure:

RAI cc w/encl: See next page

ML032330006 OFFICE PDII-2/PM PDII-2/LA SRXB/SC PDII-2/SC NAME BMoroney BClayton JUhle BMozafari for AHowe DATE 8/19/2003 8/19/2003 8/19/2003 8/20/2003 REQUEST FOR ADDITIONAL INFORMATION SPENT FUEL POOL SOLUBLE BORON CREDIT AMENDMENT SAINT LUCIE PLANT, UNIT 1 DOCKET NO. 50-335

1. In the original amendment request, the licensee stated that it determined the bounding assembly by analyzing the two assembly types currently stored in the spent fuel pool (SFP) for both the upper-bound and lower-bound cladding thicknesses. Additionally, the licensee stated that it analyzed the various enrichments, cooling times, and burnups for both Region 1 and 2 racks. Since the licensees determination of the bounding assembly excluded consideration of most of the manufacturing tolerance reactivity effects, describe how it can be assured that the final calculated maximum effective multiplication factor (keff) bounds the other assembly type.
2. In its May 14, 2003, request for additional information response, the licensee provided additional information regarding its proposed use of control element assemblies (CEAs) for reactivity control in the SFP. The repeated use of CEAs for multiple cycles may result in bowing, cracking, depletion or other properties which would make them unsuitable for crediting in an SFP criticality analysis. Provide additional information to describe the verification process to be used to determine the acceptability of a CEA before it is placed in the SFP and used for reactivity control. Specifically, describe in greater detail the analysis of the depletion effects on the criticality analyses, the typical life-span of CEAs in the St. Lucie Unit 1 reactor, any previously identified abnormalities in CEAs following removal from the reactor, and any procedures that will be used to determine the acceptability of individual CEAs.
3. In its amendment request, the licensee proposed to credit CEAs for reactivity control in the SFP. Since CEAs are not an integral (nonremovable) part of a fuel assembly or storage rack, the licensee must provide additional information to support their use. The licensee cited an August 19, 1998, letter from L. Kopp (U. S. Nuclear Regulatory Commission (NRC)) to T. Collins (NRC), Guidance on the Regulatory Requirements for Criticality Analysis of Fuel Storage at Light-Water Reactor Power Plants, as part of the guidance it used in performing its criticality analyses. Additionally, Regulatory Guide (RG) 1.13, Spent Fuel Storage Facility Design Basis, provides guidance on the methodology for performing criticality analyses in the SFP. Both documents describe strict controls on the use of fixed and/or removable neutron absorbers. Provide additional information on how the proposed amendment will satisfy the guidance in Section 5.B.5 of the Kopp letter and Section 5.1 (a and c only) of RG 1.13. In responding to the guidance in Section 5.1 (a and c only) of RG 1.13, the licensee should apply these criteria to the removable CEAs proposed to be used in the St. Lucie Unit 1 SFP.
4. The licensee stated, in its original amendment request, that it analyzed the misplacement of a fresh fuel assembly in a cell intended to hold a low-reactivity assembly (Case 4, assembly with CEA). However, the licensee stated this was not the bounding misloading event. Provide the following information regarding loading and storage of fuel in the Case 4 configuration, which credits the presence of CEAs:

Enclosure

a. Provide detailed information describing the loading and unloading procedures for movement of fuel assemblies and CEAs into Case 4 storage patterns.

Specifically, the response should focus on the procedural controls that will be used to ensure the Case 4 pattern is not violated, even for brief periods of time, while fuel movement is occurring.

b. Submit the results of the misloading event analysis for Case 4, assembly without a CEA configuration. The licensee should provide the following: (1) a detailed description of the assumptions used in the analysis, (2) the basis for each assumption and why it results in conservative or bounding results, (3) the acceptance criteria the licensee evaluated the event against, including a justification for the criteria chosen, (4) a description of the methodology employed to perform the analysis, and (5) a detailed discussion of the results obtained, including a justification for why the results provide a conservative or bounding analysis.
c. The NRC staff has been unable to identify any precedents for crediting CEAs or other nonfixed neutron absorbers in an SFP criticality analysis. Provide additional information on any previous NRC-approved amendments related to this subject.
5. Since the licensees criticality analyses are based on worst-case tolerance limits that are dependent on quality control measures instead of statistical uncertainties that use actual sample data to develop limits, provide a detailed description of the quality control measures in place that ensure all of the limits used in criticality analyses will be met.

Mr. J. A. Stall ST. LUCIE PLANT Florida Power and Light Company cc:

Senior Resident Inspector Mr. R. E. Rose St. Lucie Plant Plant General Manager U.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant P.O. Box 6090 6351 South Ocean Drive Jensen Beach, Florida 34957 Jensen Beach, Florida 34957 Craig Fugate, Director Mr. T. Patterson Division of Emergency Preparedness Licensing Manager Department of Community Affairs St. Lucie Nuclear Plant 2740 Centerview Drive 6351 South Ocean Drive Tallahassee, Florida 32399-2100 Jensen Beach, Florida 34957 M. S. Ross, Attorney Vice President, Nuclear Operations Support Florida Power & Light Company Florida Power & Light Company P.O. Box 14000 P.O. Box 14000 Juno Beach, FL 33408-0420 Juno Beach, FL 33408-0420 Mr. Douglas Anderson Mr. Rajiv S. Kundalkar County Administrator Vice President - Nuclear Engineering St. Lucie County Florida Power & Light Company 2300 Virginia Avenue P.O. Box 14000 Fort Pierce, Florida 34982 Juno Beach, FL 33408-0420 Mr. William A. Passetti, Chief Mr. J. Kammel Department of Health Radiological Emergency Bureau of Radiation Control Planning Administrator 2020 Capital Circle, SE, Bin #C21 Department of Public Safety Tallahassee, Florida 32399-1741 6000 SE. Tower Drive Stuart, Florida 34997 Mr. William Jefferson, Jr.

Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957