Issue date | Title | Topic | |
---|---|---|---|
ML031980013 | 18 July 2003 | Misc Report ,Stars, 6/10-11/2003 Licensing Workshop Held in Overland Park, Kansas with Strategic Teaming and Resource Sharing-Integrated Regulatory Affairs Group for Licensees of Callaway, Comanche Peak, Diablo Canyon, Palo Verde, So Texas | |
ML053220461 | 14 June 2004 | Power Reactor Status Report for 6/14/04 | |
ML080700699 | 28 February 2008 | Evidence of Financial Protection | |
ML11196A005 | 4 August 2011 | Summary of Site Audit Related to the Review of the License Renewal Application for South Texas Project, Units 1 and 2 | License Renewal |
ML11217A016 | 27 July 2011 | Commitment Change Summary Report | Fire Watch |
ML11256A058 | 31 August 2011 | Documents to Support Review of the South Texas Project License Renewal Application, WR-5, Tceq Id No. 1610103/1610051 (Operation of Public Potable Water System) | |
ML113050623 | 26 October 2011 | Alion- Expected Impact of Chemical Effects on GSI-191 Risk Informed Evaluation for South Texas Project | Boric Acid Mission time Probabilistic Risk Assessment Coatings Scaffolding |
ML113060615 | 31 October 2011 | LOCA Frequencies for STP Nuclear Operating Company GSI-191 | Weld Overlay Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Dissimilar Metal Weld |
ML12234A604 | 21 August 2012 | Email - Documents for NRC Public Meeting on Corrosion Head Loss Experiments (Chle) Part 1 and 2 | Boric Acid Grab sample Probabilistic Risk Assessment Coatings Scaffolding |
ML13141A285 | 25 April 2013 | License Amendment Request, Proposed Revision to Technical Specification 5.0, Design Features | Offsite Dose Calculation Manual |
ML13323A186 | 12 November 2013 | Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 | Boric Acid High winds Reactor Vessel Water Level Ultimate heat sink Non-Destructive Examination Grab sample Probabilistic Risk Assessment Coatings Large early release frequency Control of Heavy Loads Fuel cladding |
ML13323A189 | 22 October 2013 | Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis | High winds Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency Fuel cladding |
ML13323A190 | 6 November 2013 | Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 | Grab sample Weld Overlay Hydrostatic Probabilistic Risk Assessment Coatings Large early release frequency Fuel cladding |
ML13323A191 | 6 November 2013 | Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 | Boric Acid Coatings |
ML14087A078 | 15 April 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0178 & MF0179) | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML14168A268 | 1 May 2014 | Texas Pollutant Discharge Elimination System Major Amendment with Renewal Application for a Major Facility Tpdes Permit No. WQ000190800 | Coatings |
ML14344A546 | 30 October 2014 | Attachment 1 to NOC-AE-14003190 - Alion REP-STP-8998-13, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application Executive Summary | Grab sample Coatings |
ML14357A136 | 22 January 2015 | Review of Analysis of Capsule Withdrawal Schedule from Reactor Vessel Radiation Surveillance Program | |
ML17019A003 | 11 July 2017 | Attachment 2 to Safety Evaluation - In-Vessel Thermal-Hydraulic Analysis, Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 | Mission time Probabilistic Risk Assessment Coatings Fuel cladding |
ML21182A241 | 30 June 2021 | Commitment Change Summary Report | |
ML23243B056 | 31 August 2023 | Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses | |
NOC-AE-02001277, Project Comprehensive Cultural Assessment | 17 April 2002 | Project Comprehensive Cultural Assessment | |
NOC-AE-03001509, Special Report Re Power-Operated Relief Valve Actuation to Mitigate Reactor Coolant System Pressure Transient | 25 April 2003 | Special Report Re Power-Operated Relief Valve Actuation to Mitigate Reactor Coolant System Pressure Transient | |
NOC-AE-03001532, Request for One-Time Approval of an Alternative Approach for Containment Tendon Surveillances | 15 May 2003 | Request for One-Time Approval of an Alternative Approach for Containment Tendon Surveillances | Finite Element Analysis |
NOC-AE-05001874, Transmittal of the 10CFR50.59 Summary Report | 28 April 2005 | Transmittal of the 10CFR50.59 Summary Report | |
NOC-AE-05001919, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A) | 8 September 2005 | Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A) | Mission time Coatings Nondestructive Examination VT-2 |
NOC-AE-06001977, Submittal of Nuclear Insurance Protection | 9 February 2006 | Submittal of Nuclear Insurance Protection | Contraband Met Tower Earthquake |
NOC-AE-06002049, Commitment Change Summary Report | 21 August 2006 | Commitment Change Summary Report | |
NOC-AE-07002168, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) | 29 May 2007 | Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) | Weld Overlay |
NOC-AE-07002177, Proposed Alternative to ASME Section XI Requirements for Weld Overlay Hold-Time (RR-ENG-2-48) | 19 June 2007 | Proposed Alternative to ASME Section XI Requirements for Weld Overlay Hold-Time (RR-ENG-2-48) | Weld Overlay Liquid penetrant Dissimilar Metal Weld |
NOC-AE-07002231, Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46) | 7 November 2007 | Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46) | Reactor Vessel Water Level Nondestructive Examination Pressure Boundary Leakage |
NOC-AE-08002325, Commitment Change Summary Report | 11 August 2008 | Commitment Change Summary Report | |
NOC-AE-09002424, Submittal of Description and Summary of the 10CFR50.59 Evaluations of Changes, Tests and Experiments Report | 28 April 2009 | Submittal of Description and Summary of the 10CFR50.59 Evaluations of Changes, Tests and Experiments Report | Cyber Security Exemption Request |
NOC-AE-09002445, Submittal of Commitment Change Summary Report for July 31, 2008 Through July 30, 2009 | 30 July 2009 | Submittal of Commitment Change Summary Report for July 31, 2008 Through July 30, 2009 | |
NOC-AE-09002457, Nuclear Decommissioning Trust Fund Agreements (Updated) | 15 September 2009 | Nuclear Decommissioning Trust Fund Agreements (Updated) | |
NOC-AE-11002708, 10CFR50.59 Summary Report | 10 October 2011 | 10CFR50.59 Summary Report | |
NOC-AE-12002912, Submittal of 10 CFR 50.46 ECCS Evaluation Model Significant Change/Error Report | 17 October 2012 | Submittal of 10 CFR 50.46 ECCS Evaluation Model Significant Change/Error Report | |
NOC-AE-13003004, Revised Phase 1 Staffing Assessment Submitted in Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights | 3 June 2013 | Revised Phase 1 Staffing Assessment Submitted in Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights | Safe Shutdown High Radiation Area Condition Adverse to Quality FLEX Fukushima Dai-Ichi Job Performance Measure Severe Accident Management Guideline Earthquake |
NOC-AE-13003019, Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 2013 | 18 July 2013 | Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 2013 | |
NOC-AE-13003067, Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible | 27 February 2014 | Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible | Safe Shutdown Unanalyzed Condition Boric Acid Reactor Vessel Water Level Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake FLEX Fukushima Dai-Ichi Earthquake Scaffolding |
NOC-AE-14003101, Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application | 25 June 2014 | Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application | Boric Acid High winds Reactor Vessel Water Level Weld Overlay Probabilistic Risk Assessment Large early release frequency Exemption Request |
NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1 | 18 April 2014 | University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1 | High Radiation Area Coatings Scaffolding |
NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. | 31 March 2014 | Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
NOC-AE-14003178, Update Foreign Ownership, Control, or Influence (FOCI) | 17 September 2014 | Update Foreign Ownership, Control, or Influence (FOCI) | |
NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application | 30 October 2014 | Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application | Boric Acid Reactor Vessel Water Level Mission time Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operating Basis Earthquake |
NOC-AE-15003249, Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report | 9 June 2015 | Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report | |
NOC-AE-17003468, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes | 10 May 2017 | 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes | |
NOC-AE-21003816, Commitment Change Summary Report | 30 June 2021 | Commitment Change Summary Report |