Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IA-84-940, Notification of 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma,To Review & Inspect Installation of Test Equipment in 1/4 Scale Test Facility11 December 1984Notification of 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma,To Review & Inspect Installation of Test Equipment in 1/4 Scale Test Facility
IA-84-942, Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl19 November 1984Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl
IA-85-261, Documents That Appropriate Corrective Actions Taken by Dow Chemical Co in Response to 780113 Immediate Action Ltr,Per 780207 Enforcement Conference at Facility3 March 1978Documents That Appropriate Corrective Actions Taken by Dow Chemical Co in Response to 780113 Immediate Action Ltr,Per 780207 Enforcement Conference at Facility
IA-85-362, Submits Board Questions Re Identification of Alternate User for Site.Board Will Reschedule Conference Call or Establish New Procedure for Response to Questions21 February 1985Submits Board Questions Re Identification of Alternate User for Site.Board Will Reschedule Conference Call or Establish New Procedure for Response to Questions
IA-85-452, Forwards Region III 840611 Proposed Enforcement Guidance for QA Program Violations Based on Experiences at Braidwood & Fermi Plants,For Review & Comment.Response Requested by 840720.W/o Enforcement Guidance9 July 1984Forwards Region III 840611 Proposed Enforcement Guidance for QA Program Violations Based on Experiences at Braidwood & Fermi Plants,For Review & Comment.Response Requested by 840720.W/o Enforcement Guidance
IA-85-516, Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities31 December 1980Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for FacilitiesBoric Acid
Systematic Assessment of Licensee Performance
IA-85-562, Responds to 850129 Request to Review Pending OL Cases to Determine Impact by Impending Mandate in Ucs Vs NRC Re Exclusion of Results of Emergency Preparedness Exercises from Hearings.Seabrook & Shoreham Will Be Impacted20 February 1985Responds to 850129 Request to Review Pending OL Cases to Determine Impact by Impending Mandate in Ucs Vs NRC Re Exclusion of Results of Emergency Preparedness Exercises from Hearings.Seabrook & Shoreham Will Be Impacted
IA-85-563, Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning2 May 1985Forwards Listed Info Re Consideration of Earthquakes in Emergency PlanningSafe Shutdown Earthquake
Earthquake
IA-85-602, Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl26 April 1982Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl
IA-85-665, Discusses Seismic Design of Nuclear Power Plants,Including Const of Nuclear Plants in Seismically Active Zones25 February 1964Discusses Seismic Design of Nuclear Power Plants,Including Const of Nuclear Plants in Seismically Active ZonesEarthquake
IA-85-668, Partially Withheld Notice of Board Meeting 85-1012 April 1985Partially Withheld Notice of Board Meeting 85-10
IA-86-197, Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V22 August 1985Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V
IA-86-656, Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested8 March 1982Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested
IA-86-793, Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets22 September 1986Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets
IA-87-111, Submits Rept on Plant,As Discussed in ACRS 150th Meeting on 721012-14.Listed Items Can Be Resolved During Const & Facility Can Be Constructed W/Reasonable Assurance for Operation W/O Undue Risk to Public Safety19 October 1972Submits Rept on Plant,As Discussed in ACRS 150th Meeting on 721012-14.Listed Items Can Be Resolved During Const & Facility Can Be Constructed W/Reasonable Assurance for Operation W/O Undue Risk to Public SafetySafe Shutdown
IA-87-121, Discusses Inservice Test Programs Re Full Stroke Exercising of Normally Closed Swing or Tilting Disk Check Valves Per 10CFR50.55a & Section XI of ASME Code24 June 1982Discusses Inservice Test Programs Re Full Stroke Exercising of Normally Closed Swing or Tilting Disk Check Valves Per 10CFR50.55a & Section XI of ASME Code
IA-87-244, Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by Utils14 July 1983Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by UtilsInternal Flooding
Backfit
IA-87-413, Outlines Plan for Review & Evaluation of Issue Specfic Action Plan Results Rept Isap VII.a.6 (Rev 1), Exit Interviews24 February 1987Outlines Plan for Review & Evaluation of Issue Specfic Action Plan Results Rept Isap VII.a.6 (Rev 1), Exit InterviewsHigh Radiation Area
IA-87-449, Submits Daily Staff Notes for 870709.Licensee Presented Results of Investigations & Proposed Corrective Action Re 870626 Unplanned Heatup Event Resulting in Operating Mode Change from Cold to Hot Shutdown on 870707 in Chicago,Il10 July 1987Submits Daily Staff Notes for 870709.Licensee Presented Results of Investigations & Proposed Corrective Action Re 870626 Unplanned Heatup Event Resulting in Operating Mode Change from Cold to Hot Shutdown on 870707 in Chicago,Il
IA-87-535, Forwards Ofc of Inspector & Auditor Rept Documenting Investigation of Alleged Misconduct by Two NRC Employees. Investigation Did Not Identify Any Misconduct23 January 1986Forwards Ofc of Inspector & Auditor Rept Documenting Investigation of Alleged Misconduct by Two NRC Employees. Investigation Did Not Identify Any Misconduct
IA-87-778, Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines15 February 1984Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines
IA-87-830, Forwards Assessment of Radiologicals Controls Program at Facility for Period from 860501-1031.W/o Encl19 November 1986Forwards Assessment of Radiologicals Controls Program at Facility for Period from 860501-1031.W/o EnclSystematic Assessment of Licensee Performance
IA-88-129, Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR21 March 1988Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR
IA-88-165, Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl9 March 1988Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted MatlStroke time
IA-88-356, Forwards SER Supporting Util 870311 & 0407 Requests for Proposed Mods to MSIV Actuation Control Sys.Mods Comply W/ 10CFR50.55a(h) & GDC 21.SALP Input Also Encl4 May 1987Forwards SER Supporting Util 870311 & 0407 Requests for Proposed Mods to MSIV Actuation Control Sys.Mods Comply W/ 10CFR50.55a(h) & GDC 21.SALP Input Also Encl
IA-88-497, Forwards Safety Evaluation Accepting Proposed Reracking of Spent Fuel Storage Pools from Criticality Standpoint.Fuel Enrichment May Be in Conflict W/Table 54 of 10CFR51 & Data Used by Util to Assess Environ Effects.Salp Input Also Encl24 June 1988Forwards Safety Evaluation Accepting Proposed Reracking of Spent Fuel Storage Pools from Criticality Standpoint.Fuel Enrichment May Be in Conflict W/Table 54 of 10CFR51 & Data Used by Util to Assess Environ Effects.Salp Input Also Encl
IA-89-226, Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 251416 September 1987Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514
IR 05000117/200401525 July 1985Updates Operating Experience for Plant for 850415-0715. Review Updates Encl 850129 & 0426 Reviews for 841026-850117 & 850117-0415,respectively
IR 05000275/198400721 June 1984Forwards Special Insp Rept 50-275/84-07 Re Performance of Plant Operating Crews,Conducted by Region V,Lll & Eg&G Idaho,Inc.Performance Above Average Compared to Similar Licensed Facilities
IR 05000275/198503630 December 1985Requests NRR Assume Lead Responsibility for Evaluation & Resolution of Unresolved Item 50-275/85-36-04 Re Fire DampersSafe Shutdown
Fire Barrier
Emergency Lighting
Continuous fire watch
Fire Watch
Hourly Fire Watch
IR 05000277/198501122 July 1985Board Notification 85-070:forwards Enforcement Action Notification Resulting from Insp Repts 50-277/85-11 & 50-352/85-12 Re Radiation Protection at Peach Bottom & Security at Limerick
IR 05000324/198600728 July 1986Forwards Insp Repts 50-325/86-06,50-324/86-07,50-400/86-43, 50-325/86-18,50-324/86-19 & One Internal Document Re Results of Technical Review Re Region II Actions on Miriello Cases.W/O Encl
IR 05000397/19870061 July 1987Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept
IR 05000400/198504814 July 1986Notifies of Ofc of Investigations Discontinuance of Inquiry Q2-85-021 & Related Area of Interest as to Matter Contained in Insp Rept 50-400/85-48.Insp Rept & Notice of Violation May Be Released
IR 05000410/19830062 December 1983Discusses 830422 Anonymous Allegation Re Deficiencies in Emergency Diesel Generator Sys,Radiation Containment Sys & Qualifications of Contract Personnel (Allegation Rept Q-1-83-012,based on Insp Rept 50-410/83-06)
IR 05000445/19780209 February 1979Corrects Notice of Deviation Re Insp Rept 50-445/78-20,per Util 790209 Response
IR 05000454/198303827 January 1984Identifies Addl Insp Repts 50-454/83-38 & 50-455/83-28 Re Reinsp Program,Per 840120 Memo
IR 05000482/198301326 July 1983Informs That Allegation 4-83-A-17 Re Improper Use of white-out Unsubstantiated.Forwards Insp Rept 50-482/83-13. Engineering Section Insp to Be Conducted.W/O Encl
IR 05000482/198302826 October 1983Informs That Allegation 4-83-A-17 Inspected by R Hall on 830919-22 & Findings Reported in Encl 50-482/83-28.W/o Insp Rept.Related Info EnclAffidavit
IR 05000482/198400122 February 1984Informs That Remaining Item on Allegation 4-83-A-25 Completed.W/O Insp Rept 50-482/84-01
IR 05000482/198405111 December 1984Forwards Special Const Verification Insp Rept 50-482/84-51 of Voluntary Const self-assessment on 841023-1102,per 840924 Request,For Transmittal to Applicant.Transmittal Ltr, Potential Enforcement Actions & Unresolved Items Also Encl
IR 05000528/198501225 September 1985Forwards 850806 & 0730 Ltrs & Insp Rept 50-528/85-12 Per ACRS 811215 Request for Info Re Startup Experience on Unit 1 Prior to Loading on Unit 2.Unit 2 Fuel Load Scheduled for Nov.Initial Criticality Expected by Jan 1986
IR 05000529/198504427 November 1985Comments on Comparison of as-built Plant W/Facility Tech Specs.Details of Review to Be Reflected in Insp Rept 50-529/85-44 & IE Insp Procedure 71301, Tech Spec Review, Dtd 850322.Proposed Tech Specs Clear & Enforceable
ML0823201704 October 1985Responds to 850828 Concerns That Procedures in Draft Manual Chapter 0514 Not Followed in Addressing Util 850604 Backfit Claim.Nrr Completed Actions within Stipulated 3-wk Time Frame.Ie Concurrence Delayed NRC ResponseBackfit
ML0823808437 November 1985Discusses Util 850531 Response to NRC Request for Addl Info Re Item 2.2.2 of Generic Ltr 83-28 Contending That Request Violated plant-specific Backfit Manual.Appeal Not Planned. Item ClosedBackfit
ML08289091318 March 1985Forwards Monthly Status Rept on plant-specific Backfitting Activities Current Through 850308.Nine of 15 SER Open Items Resolved Prior to Appeal Meetings.Ser Scheduled for Completion on 850329
ML18046B2894 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML18046B29010 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML20054E92310 June 1982Board Notification:Notifying of Drywell to Wetwell Vacuum Breakers Which Can Be Subj to air-clearing Load Resulting from Pool Swell Following Postulated Loca.Components Can Be Overstressed by Impact Load
ML20054G58215 June 1982Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components