Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
MNS-14-001, Submittal of Summary Report of Evaluations Performed at for Changes Occurring During the Period from January 1, 2013, to December 31, 20136 February 2014Submittal of Summary Report of Evaluations Performed at for Changes Occurring During the Period from January 1, 2013, to December 31, 2013Shutdown Margin
MNS-14-003, License Amendment Request for Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System28 January 2014License Amendment Request for Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) SystemStroke time
Anticipated operational occurrence
Hydrostatic
Surveillance Frequency Control Program
Fuel cladding
Grace period
MNS-14-009, Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding Update - Review of Available Physical Margin (APM) Assessments30 January 2014Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding Update - Review of Available Physical Margin (APM) AssessmentsFukushima Dai-Ichi
MNS-14-016, Emergency Plan, Revision 14-130 January 2014Emergency Plan, Revision 14-1Safe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
B.5.b
Tornado Generated Missile
Safeguards Contingency Plan
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
Operational leakage
MNS-14-017, Response to Request for Additional Information Regarding Response to NRC Bulletin 2012-0130 January 2014Response to Request for Additional Information Regarding Response to NRC Bulletin 2012-01Open Phase Condition
MNS-14-019, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)27 February 2014Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)Boric Acid
High winds
Tornado Missile
Internal Flooding
FLEX
B.5.b
Battery sizing
MNS-14-023, Duke Energy Carolinas, LLC, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)27 February 2014Duke Energy Carolinas, LLC, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)Boric Acid
High Radiation Area
Mission time
Tornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Locked High Radiation Area
FLEX
Seismically rugged
Spent Fuel Pool Instrumentation
Fire Protection Program
Grace period
MNS-14-025, Submittal of Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Re Recommendations 2.1, 2.3 & 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident12 March 2014Submittal of Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Re Recommendations 2.1, 2.3 & 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentFukushima Dai-Ichi
MNS-14-026, Risk-Informed Inservice Inspection Program Response to Request for Additional Information3 March 2014Risk-Informed Inservice Inspection Program Response to Request for Additional Information
MNS-14-029, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of The.20 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of The.Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
Seismic Walkdown Report
MNS-14-030, Annual Commitment Change Report19 March 2014Annual Commitment Change Report
MNS-14-036, Annual Radioactive Effluent Release Report29 April 2014Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
MNS-14-043, (Mns), Units 1 and 2, Response to Request for Additional Information Regarding License Amendment Request (LAR) for Proposed Changes to Technical Specification (TS) 3.3.2, in Support of Compliance with NRC Order EA-12-049.20 May 2014(Mns), Units 1 and 2, Response to Request for Additional Information Regarding License Amendment Request (LAR) for Proposed Changes to Technical Specification (TS) 3.3.2, in Support of Compliance with NRC Order EA-12-049.
MNS-14-045, Responses to Request for Additional Information Related to License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Dated October 28, 20133 June 2014Responses to Request for Additional Information Related to License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Dated October 28, 2013Battery sizing
Commercial Grade
MNS-14-046, Station Initial Exam 2014-301 General Correspondence28 May 2014Station Initial Exam 2014-301 General CorrespondenceJob Performance Measure
MNS-14-047, Emergency Plan, Revision 14-223 June 2014Emergency Plan, Revision 14-2Grab sample
B.5.b
Earthquake
Minimum staff
Siren
MNS-14-056, Response to Request for Additional Information Regarding License Amendment Request (LAR) for Proposed Changes to Technical Specification (TS) 3.3.2, in Support of Compliance with NRC Order EA-12-049 (TAC Nos. MF2741, 2742)22 July 2014Response to Request for Additional Information Regarding License Amendment Request (LAR) for Proposed Changes to Technical Specification (TS) 3.3.2, in Support of Compliance with NRC Order EA-12-049 (TAC Nos. MF2741, 2742)
MNS-14-066, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)27 August 2014Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Boric Acid
High winds
Tornado Missile
FLEX
Battery sizing
MNS-14-067, Third Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 August 2014Third Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
MNS-14-070, Duke Energy Request for NRC Grant Discretion from Enforcing the Shutdown Requirement of Technical Specifications (TS) 3.8.1 (AC Sources - Operating)25 August 2014Duke Energy Request for NRC Grant Discretion from Enforcing the Shutdown Requirement of Technical Specifications (TS) 3.8.1 (AC Sources - Operating)Safe Shutdown
High winds
Enforcement Discretion
Large early release frequency
Pandemic
Continuous fire watch
MNS-14-072, Emergency Plan, Revision 14-317 September 2014Emergency Plan, Revision 14-3Grab sample
B.5.b
Earthquake
Siren
MNS-14-086, Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051, Order to Modify Licenses With.18 November 2014Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051, Order to Modify Licenses With.FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
MNS-14-090, Response to August 28, 2014 NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program12 November 2014Response to August 28, 2014 NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection ProgramHot Short
Safe Shutdown
Probabilistic Risk Assessment
Fire impairment
Operator Manual Action
Multiple Spurious Operation
Thermoset
Time Critical Operator Action
Fire Protection Program
MNS-14-095, Response to August 28, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program12 December 2014Response to August 28, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection ProgramHot Short
Safe Shutdown
Mission time
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operator Manual Action
Thermoset
Foreign Material Exclusion
Large early release frequency
Hemyc
Cable Tray Ignition
License Renewal
Earthquake
Fire Protection Program
MNS-14-097, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review.17 December 2014Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review.Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
B.5.b
Fukushima Dai-Ichi
Earthquake
Power-Operated Valves
MNS-14-102, Emergency Response Data System Changes16 December 2014Emergency Response Data System ChangesPower Uprate
Measurement Uncertainty Recapture
MNS-14-103, Submittal of Emergency Plan, Revision 14-516 December 2014Submittal of Emergency Plan, Revision 14-5Safe Shutdown
Health Physics Network
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Slow transfer
Cyber Security
B.5.b
Tornado Generated Missile
Safeguards Contingency Plan
Earthquake
Pressure Boundary Leakage
Minimum staff
Power change
Siren
Operational leakage
MNS-15-002, Response to August 28, 2014, & October 27, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program26 January 2015Response to August 28, 2014, & October 27, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection ProgramProbabilistic Risk Assessment
Thermoset
Cable Tray Ignition
Fire Protection Program
MNS-15-004, Annual Commitment Change Report29 January 2015Annual Commitment Change Report
MNS-15-005, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)26 February 2015Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Boric Acid
High winds
Tornado Missile
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
MNS-15-006, Fourth Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Sfpi)(Order Number EA-12-051)26 February 2015Fourth Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Sfpi)(Order Number EA-12-051)Spent Fuel Pool Instrumentation
MNS-15-007, Lake Norman Maintenance Monitoring Program: 2013 Summary29 January 2015Lake Norman Maintenance Monitoring Program: 2013 Summary
MNS-15-008, Independent Spent Fuel Storage Installation (ISFSI)19 February 2015Independent Spent Fuel Storage Installation (ISFSI)
MNS-15-010, Inservice Inspection Report, End of Cycle 23 Refueling Outage12 February 2015Inservice Inspection Report, End of Cycle 23 Refueling OutageBoric Acid
Weld Overlay
Hydrostatic
VT-2
Thermal fatigue
MNS-15-013, Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement23 March 2015Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS RequirementSafe Shutdown
Shutdown Margin
Power Uprate
Measurement Uncertainty Recapture
MNS-15-016, Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and Experiments19 March 2015Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and ExperimentsShutdown Margin
Tornado Missile
FLEX
Measurement Uncertainty Recapture
MNS-15-018, License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors Dated November 20127 May 2015License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors Dated November 2012Safe Shutdown
High winds
Operating Basis Earthquake
Earthquake
MNS-15-022, Renewed Facility Operating License Nos. NPF-35 and NPF-52 Removal of Superseded Technical Specification (TS) Requirements23 June 2015Renewed Facility Operating License Nos. NPF-35 and NPF-52 Removal of Superseded Technical Specification (TS) RequirementsSafe Shutdown
Surveillance Frequency Control Program
MNS-15-025, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation9 July 2015License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation
MNS-15-031, Response to NRC Request for Additional Information Regarding Flood Hazard Reevaluation Report (FHRR)3 June 2015Response to NRC Request for Additional Information Regarding Flood Hazard Reevaluation Report (FHRR)Fukushima Dai-Ichi
MNS-15-052, Response to June 18, 2015, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program15 July 2015Response to June 18, 2015, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection ProgramHot Short
Safe Shutdown
Probabilistic Risk Assessment
Multiple Spurious Operation
Job Performance Measure
Fire Protection Program
MNS-15-053, Emergency Plan, Revision 15-221 July 2015Emergency Plan, Revision 15-2Grab sample
B.5.b
Earthquake
Siren
MNS-15-054, Withdrawal of License Amendment Request (LAR) for Technical Specification TS) 3.7.7 - Nuclear Service Water System (Nsws)29 July 2015Withdrawal of License Amendment Request (LAR) for Technical Specification TS) 3.7.7 - Nuclear Service Water System (Nsws)
MNS-15-060, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)26 August 2015Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Boric Acid
High winds
Tornado Missile
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
MNS-15-061, Fifth Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (SFPI) (Order Number EA-12-051)26 August 2015Fifth Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (SFPI) (Order Number EA-12-051)Spent Fuel Pool Instrumentation
MNS-15-062, Response to Request for Additional Information Regarding License Amendment Request (LAR) for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (Nsws) Degraded Condition11 August 2015Response to Request for Additional Information Regarding License Amendment Request (LAR) for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (Nsws) Degraded ConditionSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
MNS-15-066, Response to NRC June 18, 2015 and May 8, 2015 Requests for Additional Information Re License Amendment Request to Implement Risk-Informed Performance-Based Fire Protection Program20 August 2015Response to NRC June 18, 2015 and May 8, 2015 Requests for Additional Information Re License Amendment Request to Implement Risk-Informed Performance-Based Fire Protection ProgramSafe Shutdown
Probabilistic Risk Assessment
Incorporated by reference
Thermoset
Large early release frequency
Fire Protection Program
MNS-15-068, License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors.24 March 2016License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors.Surveillance Frequency Control Program
Operability Determination
Fuel cladding
MNS-15-069, Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating.28 August 2015Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating.Mission time
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Maintenance Rule Program
Fuel cladding
Grace period
MNS-15-070, Response to August 18, 2015, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program9 September 2015Response to August 18, 2015, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection ProgramSafe Shutdown
Probabilistic Risk Assessment
Fire Protection Program