Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000498/LER-2016-00122 March 2016Unit 1 Manual Reactor Trip due to Loss of Main Feedwater to C Train Steam Generator When the Steam Generator Feedwater Regulating Valve Failed Closed
LER 16-001-00 for South Texas Project, Unit 1, Regarding Manual Reactor Trip due to Loss of Main Feedwater to C Train Steam Generator When the Steam Generator Feedwater Regulating Valve Failed Closed
Probabilistic Risk Assessment
05000498/LER-2016-00229 June 2016Unit 1 Automatic Reactor Trip and Auxiliary Feedwater System Actuation Following Turbine Trip due to Generator Lockout
LER 16-002-00 for South Texas Project, Unit 1, Regarding Automatic Reactor Trip and Auxiliary Feedwater System Actuation Following Turbine Trip Due to Generator Lockout
05000498/LER-2017-00111 May 2017Unit 1 failure of a timing relay during a Technical Specification surveillance
LER 17-001-00 for South Texas, Unit 1, Regarding Failure of a Timing Relay During a Technical Specification Surveillance
05000498/LER-2017-00222 January 2018Unit 1 Condition Prohibited by Technical Specifications Due to Inoperable Control Room Envelope Makeup Filtration System Heating Coil
LER 17-002-00 for South Texas Project, Unit 1, Regarding Condition Prohibited by Technical Specifications Due to Inoperable Control Room Envelope Makeup Filtration System Heating Coil
Large early release frequency
IR 05000004/19990449 November 2011IR 05000498-11-004 & 05000499-44-004, on 07/01/2011 - 09/30/2011, South Texas Project Electric Generating Station, Units 1 and 2, Integrated Resident and Regional Report; Operability Evaluations; Identification and Resolution of ProblemsHigh winds
Reactor Vessel Water Level
Condition Adverse to Quality
Tornado-Generated Missile
Significance Determination Process
Large early release frequency
Operability Determination
Through Wall Leak
Fire Protection Program
Operability Assessment
Unidentified leakage
Siren
IR 05000397/20125025 April 2013Final Significance Determination of White Findings and Notice of Violation, NRC Inspection Report 05000397-12-502 ErrataSignificance Determination Process
Preliminary White Finding
IR 05000498/200100414 January 2002IR 05000498/2001-004, IR 05000499/2001-004, STP Nuclear Operating Company, South Texas Project Units 1 & 2, Inspection on 11/05-12/07/2001 Re Safety System Design, Performance Capability, Evaluation of Changes, Tests, or Experiments. ViolatLoop seal
Mission time
Stroke time
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Fire Protection Program
Operability Assessment
IR 05000498/20020014 March 2002Annual Assessment - South Texas Project Electric Generating Station (Report 50-498, 499/02-01)
IR 05000498/200200211 July 2002IR 05000498-02-002; IR 05000499-02-002; on 3/24/2002 - 6/22/2002; South Texas Project Electric Generating Station; Units 1 & 2. Integrated Resident and Regional Report. No Violations NotedFire Barrier
Temporary Modification
Operability Determination
Safeguards Contingency Plan
Power change
Power Uprate
IR 05000498/200200323 July 2002IR 05000498-02-003; IR 05000499-02-003, 05/20-24/2002; STP Nuclear Operating Company; South Texas Project Electric Generating Station; Units 1& 2; Triennial Fire Protection InspectionHot Short
Safe Shutdown
Fire Barrier
Emergency Lighting
Fire Protection Program
IR 05000498/200200418 October 2002IR 05000498-02-004; IR 05000499-02-004; on 6/23/2002 - 9/21/2002; STP Nuclear Operating Company; South Texas Project Electric Generating Station; Units 1 & 2. Integrated Resident and Regional Report; Event Followup, Surveillance TestingFire Barrier
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
Siren
IR 05000498/200200527 January 2003IR 05000498-02-005; IR 05000499-02-005; on 09/23/2002 - 12/28/2002, South Texas Project Electric Generating Station; Units 1 & 2, Integrated Resident and Regional Report; Operability Evaluation, Problem Identification and ResolutionBoric Acid
High Radiation Area
Fire Barrier
Time to boil
Weld Overlay
Nondestructive Examination
VT-2
Locked High Radiation Area
Significance Determination Process
Operability Determination
Maintenance Rule Program
Deep Dose Equivalent
Operability Assessment
Overexposure
IR 05000498/200200618 April 2003IR 05000498-02-006; IR 05000499-02-006, on 12/29/2002 - 03/22/2003, STP Nuclear Operating Company; South Texas Project Electric Generating Station; Units 1 & 2. Integrated Resident & Regional Rpt; Event Followup, Outage Activities, Pi&R, MiReactor Vessel Water Level
Mission time
Fire Barrier
Probabilistic Risk Assessment
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
IR 05000498/200200710 July 2002IR 05000498-02-007; IR 05000499-02-007; on 03/17-06/15/2002; South Texas Project Nuclear Operating Company; South Texas Project Electric Generating Station, Unit 2. Integrated Resident & Regional Report of Steam Generator Replacement Activi
IR 05000498/200200811 October 2002IR 05000498-02-008; IR 05000499-02-008; on 06/16-09/21/2002; South Texas Project Nuclear Operating Company; South Texas Project Electric Generating Station, Unit 2. Integrated Resident & Regional Report of Steam Generator Replacement Activi
IR 05000498/200200930 January 2003IR 05000498-02-009 & IR 05000499-02-009, on 09/22 - 12/21/2002, South Texas Project Nuclear Operating Company; South Texas Project Electric Generating Station, Unit 2, Integrated Report of Steam Generator Replacement ActivitiesSafe Shutdown
High Radiation Area
Nondestructive Examination
Temporary Modification
Excess Flow Check Valve
Overexposure
IR 05000498/20030014 March 2003Annual Assessment - South Texas Project Electric Generating Station (Report 50-498, 499/03-01)
IR 05000498/20030025 August 2003IR 05000498-03-002 and IR 05000499-03-002, on 3/23/02 - 06/21/03; South Texas Units 1 & 2. Integrated Resident & Regional Report; Event Followup, Other Activities, Maintenance, Implementation, Maintenance, Risk, ALARA Planning & ControlsSafe Shutdown
Reactor Vessel Water Level
High Radiation Area
Fire Barrier
Nondestructive Examination
Temporary Modification
VT-2
Locked High Radiation Area
Significance Determination Process
Operability Determination
Control of Heavy Loads
Deep Dose Equivalent
Liquid penetrant
Substantial potential for an overexposure
Power change
Operability Assessment
Siren
Overexposure
IR 05000498/200300314 October 2003IR 05000498-03-003, IR 05000499-03-003; on 06/22/03 - 09/20/03; South Texas Project Electric Generating Station; Units 1 & 2; Integrated Resident Report; Maintenance Effectiveness, Motor Operated Valve Unresolved Item ClosureHigh Radiation Area
Fire Barrier
Temporary Modification
Significance Determination Process
Operability Determination
Maintenance Rule Program
Operability Assessment
IR 05000498/200300426 January 2004IR 05000498-03-004, IR 05000499-03-004 on 09/21/03 - 12/31/03 for South Texas Projects, Units 1 & 2; Integrated Resident Report; Event Followup, Power Operated Relief Valve Unresolved Item ClosureBoric Acid
Fire Barrier
Stroke time
Internal Flooding
Enforcement Discretion
Temporary Modification
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
IR 05000498/200300524 April 2003IR 05000498-03-005 & IR 05000499-03-005, on 03/10-13/2003, South Texas Project. STP Nuclear Operating Company South Texas Project Electric Generating Station; Units 1 & 2; Ti 2515/148, Verification
IR 05000498/20030067 May 2003IR 05000498-03-006, IR 05000499-03-006, on 02/24 - 03/06/03, STP Nuclear Operating Company, South Texas Project Electric Generating Station; Units 1 & 2, Identification and Resolution of ProblemsFitness for Duty
High Radiation Area
Temporary Modification
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
IR 05000498/20030088 September 2003IR05000498-03-008; IR05000499-03-008; on 05/05-07/28/2003; South Texas Project Electric Generating Station; Units 1 and 2; Special Inspection Team ReportBoric Acid
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Significance Determination Process
Operability Determination
Liquid penetrant
Pressure Boundary Leakage
Pressure boundary leak
Unidentified leakage
IR 05000498/200301011 September 2003IR 05000498-03-010 & IR05000499-03-010, South Texas Project Electric Generating Station, August 18-22, 2003. Supplemental InspectionProbabilistic Risk Assessment
Downpower
IR 05000498/200400219 May 2004IR 05000498-04-002 & IR 05000499-04-002 on 01/01/04 - 04/07/04 for South Texas Project Electric Generating Station; Units 1 & 2; Personnel Performance, Operability Evaluations, Surveillance Testing, ALARA Planning and Controls, Pi&R, and OtUnanalyzed Condition
Fire Barrier
Stroke time
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Operability Determination
Earthquake
Maintenance Rule Program
Substantial potential for overexposure
Power change
Operability Assessment
Overexposure
IR 05000498/20040035 August 2004IR 05000498-04-003 and IR 05000499-04-003 on 04/08/04 - 06/26/04; South Texas Project Electric Generating Station: Units 1 & 2; Integrated Resident Report, Occupational Radiation Safety, Other ActivitiesSafe Shutdown
Boric Acid
Fitness for Duty
High Radiation Area
Fire Barrier
Stroke time
Coatings
Nondestructive Examination
Temporary Modification
VT-2
Locked High Radiation Area
Significance Determination Process
Operability Determination
Maintenance Rule Program
Liquid penetrant
Scaffolding
Substantial potential for overexposure
Operability Assessment
Overexposure
IR 05000498/200400426 October 2004IR 05000498-04-004, 05000499-04-004; 06/27/04 - 09/26/04; South Texas Project Electric Generating Station; Units 1 & 2; Integrated Resident Report, Event Followup, Occupational Radiation SafetyUnanalyzed Condition
High Radiation Area
Fire Barrier
Enforcement Discretion
Temporary Modification
Significance Determination Process
Operability Determination
Maintenance Rule Program
Substantial potential for overexposure
Siren
Overexposure
IR 05000498/200400527 January 2005IR 05000498-04-005, 05000499-04-005; 09/27/04 - 12/31/04; South Texas Project Electric Generating Station; Units 1 & 2; Integrated Resident Report, Maintenance EffectivenessFire Barrier
Temporary Modification
Significance Determination Process
Operability Determination
Maintenance Rule Program
Operability Assessment
IR 05000498/200400623 March 2004IR 05000498-04-006; 05000-499-04-006, on 01/31/2004; South Texas Project Electric Generating Station, Units 1 & 2: Special Team Inspection Report. Problem Identification & Resolution, Event Response, Operability Evaluations, & post-maintenaMission time
Nondestructive Examination
Incorporated by reference
IR 05000498/200400818 March 2004IR 05000498-04-008, IR 05000499-04-008, on 03/01/2004 - 03/04/2004, South Texas Project Electric Generating Station, Security Review of Access Authorizaton, Access Control, Fitness-for-Duty Work Hours, and Performance Indicators
IR 05000498/200400915 September 2004IR 05000498-04-009, 05000499-04-009, on 07/12 - 08/09/2004; South Texas Project Electric Generating Station; Units 1 & 2; Radioactive Material Control ProgramHigh Radiation Area
Offsite Dose Calculation Manual
Process Control Program
IR 05000498/20040114 January 2005IR 05000498-04-011, IR 05000499-04-011 on 10/18/04 - 12/17/04 for South Texas Project Electric Generating Station; Units 1 & 2; Biennial Baseline Inspection of the Identification and Resolution of ProblemsSafe Shutdown
Unanalyzed Condition
High Radiation Area
Significance Determination Process
Operability Determination
IR 05000498/20050012 March 2005Annual Assessment Letter - South Texas Project (Report 05000498/2005001 and 05000499/2005001)
IR 05000498/20050029 May 2005IR 05000498-05-002, 05000499-05-002 on 01/01/05 - 04/07/05 for South Texas Project Electric Generating Station; Units 1 & 2; Integrated Resident Report, Access Control to Radiologically Significant Areas, Problem Identification and ResolutiBoric Acid
High Radiation Area
Fire Barrier
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
Liquid penetrant
Substantial potential for overexposure
Operability Assessment
Siren
Overexposure
IR 05000498/200500326 July 2005IR 05000498-05-003, 05000499-05-003; 04/08/05 - 06/26/05; South Texas Project Electric Generating Station; Units 1 & 2; Integrated Resident Report, Problem Identification and Resolution, Fitness for DutySafe Shutdown
Fitness for Duty
Temporary Modification
Significance Determination Process
Fuel cladding
Pressure Boundary Leakage
Operability Assessment
Unidentified leakage
IR 05000498/200500412 January 2006IR 05000498-05-004 & IR 05000499-05-004, 01/12/2006, NRCHigh Radiation Area
IR 05000498/200500511 February 2006IR 05000498-05-005 & 05000499-05-005, on 09/27-12/31/2005, South Texas Project Electric Generating StationBoric Acid
Non-Destructive Examination
Nondestructive Examination
Significance Determination Process
Job Performance Measure
Liquid penetrant
Siren
IR 05000498/200500614 July 2005IR 05000498-05-006, 05000499-05-006; on 06/06/05-06/23/05; for South Texas Project Electric Generating Station, Units 1 and 2; Fire Protection (Triennial)Hot Short
Safe Shutdown
Fire Barrier
Stroke time
Emergency Lighting
Significance Determination Process
Thermoset
Fire Protection Program
IR 05000498/200500823 December 2005IR 05000498-05-008, IR 05000499-05-008; 11/14 - 12/2/2005; South Texas Project, Units 1 and 2; Safety System Design and Performance Capability, Evaluations of Changes, Tests, or ExperimentsProbabilistic Risk Assessment
Scaffolding
IR 05000498/200530112 January 2006Er 05000498-05-301; 05000499-05-301 on 11/14-18/2005; South Texas Project, Initial Operator Licensing Examination
IR 05000498/200600222 June 2006Errata for South Texas Project Electric Generating Station - NRC Integrated Inspection Report 05000498-06-002 and 05000499-06-002Hot Short
Safe Shutdown
Stroke time
Significance Determination Process
Fire Protection Program
IR 05000498/200600310 August 2006NRC Integrated Inspection Report 05000498-06-003 and 05000499-06-003Safe Shutdown
Temporary Modification
Significance Determination Process
Pressure boundary leak
Continuous fire watch
Power change
Siren
IR 05000498/200600420 November 2006IR 05000498-06-004, 05000499-06-004; STP Nuclear Operating Company; 07/08/06 - 10/07/06; South Texas Project Electric Generating Station, Units 1 and 2; Integrated Resident and Regional Report; Surveillance Testing, Problem Identification aSafe Shutdown
Internal Flooding
Temporary Modification
Significance Determination Process
Pressure Boundary Leakage
Substantial potential for overexposure
Overexposure
IR 05000498/200600514 February 2007IR 05000498-06-005, 05000499-06-005; 10/08/06 - 12/31/06; South Texas Project Electric Generating Station, Units 1 and 2; Access Controls to Radiologically Significant AreasBoric Acid
High Radiation Area
Weld Overlay
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Job Performance Measure
Substantial potential for overexposure
Unidentified leak
Overexposure
IR 05000498/200600730 August 2006IR 05000498-06-007, 05000499-06-007 on 08/07/2006 - 08/10/2006 for South Texas Project Electric Generating Station, Units 1 and 2; Security InspectionAffidavit
IR 05000498/200600822 March 2006IR 05000498-06-008 and 05000499-06-008, Conducted January 23 - 26, 2005, STP Nuclear Operating Company Errata
IR 05000498/200600916 November 2006IR 05000498-06-009 and 05000499-06-009; on 7/10-10/05/2006; South Texas, Units 1 and 2; Biennial Inspection of the Identification and Resolution of ProblemsBoric Acid
Temporary Modification
Operability Determination
IR 05000498/20060108 November 2006IR 05000498-06-010, IR 05000499-06-010, on 09/25-28/2006, South Texas Project, Units 1 & 2, 95001 Supplemental Inspection
IR 05000498/20064014 October 2006Nuclear Regulatory Commission Inspection Report 05000498/2006401 and 05000499/2006401
IR 05000498/20070012 March 2007Annual Assessment Letter - South Texas Project Electric Generating Station (NRC Inspection Report 05000498-07-001 and 05000499-07-001)