ary 12, 2006

SUBJECT:

NRC INSPECTION REPORT 05000498/2005004 AND 05000499/2005004

Dear Mr. Sheppard:

Because of an error in documenting the completed inspection scope for the ALARA inspection conducted June 27 - 30, 2005, insert the enclosure to this letter as replacements for pages 12 - 14 of NRC Inspection Report 05000498/2005004 and 05000499/2005004.

Please accept my apology for any inconvenience these actions may have caused.

Sincerely,

//RA//

Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Dockets: 50-498 50-499 Licenses: NPF-76 NPF-80 Enclosure:

Pages 12 - 14 of NRC Inspection Report 05000498/2005004 and 05000499/2005004 cc w/Enclosure:

E. D. Halpin Vice President, Oversight STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483

STP Nuclear Operating Company -2-S. M. Head, Manager, Licensing STP Nuclear Operating Company P.O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 C. Kirksey/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 J. J. Nesrsta/R. K. Temple City Public Service Board P.O. Box 1771 San Antonio, TX 78296 Jack A. Fusco/Michael A. Reed Texas Genco, LP 12301 Kurland Drive Houston, TX 77034 Jon C. Wood Cox Smith Matthews 112 E. Pecan, Suite 1800 San Antonio, TX 78205 A. H. Gutterman, Esq.

Morgan, Lewis & Bockius 1111 Pennsylvania Avenue NW Washington, DC 20004 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Director, Division of Compliance & Inspection Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326

STP Nuclear Operating Company -3-Environmental and Natural Resources Policy Director P.O. Box 12428 Austin, TX 78711-3189 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122, P.O. Box 13087 Austin, TX 78711-3087 Ted Enos 4200 South Hulen Suite 630 Fort Worth, TX 76109

STP Nuclear Operating Company -4-Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (JXC2)

Branch Chief, DRP/A (CEJ1)

Senior Project Engineer, DRP/A (TRF)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

Only inspection reports to the following:

DRS STA (DAP)

J. Dixon-Herrity, OEDO RIV Coordinator (JLD)

ROPreports STP Site Secretary (LAR)

SUNSI Review Completed: _Yes_____ ADAMS: / Yes G No Initials: GLG_____

/ Publicly Available G Non-Publicly Available G Sensitive /Non-Sensitive S\DRS\DRSLTRS\STP2005004errata.wpd RIV: DRS/PSB/HPI C:PSB GLGuerra MPShannon

/RA/ /RA/

1/ 12 /06 1/ 12 /06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

-12-The inspectors completed one sample.

b. Findings No findings of significance were identified.

2. RADIATION SAFETY Cornerstone: Occupational Radiation Safety [OS]

2OS2 ALARA Planning and Controls (71121.02)

a. Inspection Scope The inspector assessed licensee performance with respect to maintaining individual and collective radiation exposures as low as is reasonably achievable (ALARA). The inspector used the requirements in 10 CFR Part 20 and the licensees procedures required by Technical Specifications as criteria for determining compliance. The inspector interviewed licensee personnel and reviewed:

Site specific ALARA procedures Seven work activities of highest exposure significance completed during the last outage Exposure tracking system Workers use of the low dose waiting areas Source-term control strategy for exposure reduction initiatives Specific sources identified by the licensee for exposure reduction actions and priorities established for these actions, and results achieved since the last refueling cycle Radiation worker and radiation protection technician performance during work activities in radiation areas, airborne radioactivity areas, or high radiation areas Self-assessments, audits, and special reports related to the ALARA program since the last inspection Corrective action documents related to the ALARA program and follow-up activities such as initial problem identification, characterization, and tracking Records detailing the historical trends and current status of tracked plant source terms l and contingency plans for expected changes in the source term due to changes in plant l fuel performance issues or changes in plant primary chemistry. l Enclosure

-13-The inspector completed 10 of the required 29 samples. l b. Findings No findings of significance were identified.

4. OTHER ACTIVITIES 4OA2 Identification and Resolution of Problems (71152)

.1 Daily CR Review a. Inspection Scope As required by Inspection Procedure 71152, "Identification and Resolution of Problems, and in order to help identify repetitive equipment failures or specific human performance issues for followup, the inspectors performed a daily screening of items entered into the licensees corrective action program. This review was accomplished by reviewing hard copy or electronic summaries of each CR, attending various daily screening meetings, and accessing the licensees computerized corrective action program database.

b. Findings and Observations No findings of significance were identified.

.2 ALARA Planning and Controls a. Inspection Scope Section 2OS2 evaluated the effectiveness of the licensee's problem identification and resolution processes regarding exposure tracking, higher than planned exposure levels, and radiation worker practices. The inspector reviewed the corrective action documents listed in the attachment against the licensees problem identification and resolution program requirements. No findings of significance were identified.

b. Findings and Observations No findings of significance were identified.

4OA6 Meetings, Including Exit The results of the ALARA inspection were presented to Mr. G. Parkey and other members of his staff on June 30, 2005.

The results of the biennial maintenance rule inspection were presented to Mr. James J.

Sheppard, President and CEO and other members of licensee management on September 15, 2005.

Enclosure

-14-The results of the resident inspection were presented to Mr. James and other members of licensee management on October 6, 2005.

During each exit meeting, the inspectors asked the licensee representatives whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.

Other Meetings Mr. Claude Johnson, Branch Chief, Project Branch A, Division of Reactor Projects, visited the site and toured selected areas of the facility on September 13-16.

40A7 Licensee-identified Violations None.

Enclosure