Category:Inspection Report
MONTHYEARIR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 IR 05000498/20230042024-01-29029 January 2024 – Integrated Inspection Report 05000498/2023004 and 05000499/2023004 IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 IR 05000498/20230032023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter IR 05000498/20230022023-07-28028 July 2023 – Integrated Inspection Report 05000498/2023002 and 05000499/2023002 IR 05000498/20234022023-07-14014 July 2023 Security Baseline Inspection Report 05000498/2023402 and 05000499/2023402 (Cover Letter Only) IR 05000498/20230012023-05-0303 May 2023 Integrated Inspection Report 05000498/2023001 and 05000499/2023001 - April 26, 2023 ML23114A3412023-04-24024 April 2023 RE22 Inspection Summary Report for Steam Generator Tubing IR 05000498/20224012023-04-20020 April 2023 Cybersecurity Inspection Report 05000498/2022401 and 05000499/2022401 IR 05000498/20230102023-03-27027 March 2023 Fire Protection Inspection Report 05000498/2023010 and 05000499/2023010 IR 05000498/20220062023-03-0101 March 2023 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2022006 and 05000499/2022006) IR 05000498/20220042023-02-0202 February 2023 Integrated Inspection Report 05000498/2022004 and 05000499/2022004 IR 05000498/20220032022-10-21021 October 2022 Integrated Inspection Report 05000498/2022003 and 05000499/2022003 ML22250A4862022-09-0909 September 2022 Security Baseline Inspection Report 05000498/2022403 and 05000499/2022403 ML22251A3842022-09-0808 September 2022 Security Baseline Inspection Report 05000498/2022403 and 05000499/2022403 (4) IR 05000498/20224032022-09-0808 September 2022 Security Baseline Inspection Report 05000498/2022403 and 05000499/2022403 IR 05000498/20220122022-08-31031 August 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000498/2022012 and 05000499/2022012 IR 05000498/20224042022-08-31031 August 2022 Operating Company NRC Security Inspection Report 05000498/2022404, 05000499/2022404 (Cover Letter) IR 05000498/20220022022-08-11011 August 2022 Integrated Inspection Report 05000498/2022002 & 05000499/2022002 & Independent Spent Fuel Storage Installation Inspection Report 07201041/2022002 and Exercise of Enforcement Discretion ML22220A0452022-08-0808 August 2022 STP Nuclear Operating Company Biennial Problem Identification and Resolution Inspection Report (Cover and Enclosure 1) IR 05000498/20220012022-05-0909 May 2022 Integrated Inspection Report 05000498/2022001 and 05000499/2022001 IR 05000498/20224022022-03-21021 March 2022 Security Baseline Inspection Report 05000498/2022402 and 05000499/2022402 IR 05000498/20210062022-03-0202 March 2022 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2021006 and 05000499/2021006) IR 05000498/20220112022-03-0101 March 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000498/2022011 and 05000499/2022011 IR 05000498/20210042022-01-30030 January 2022 Integrated Inspection Report 05000498/2021004 and 05000499/2021004 IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 IR 05000498/20210032021-11-0303 November 2021 Integrated Inspection Report 05000498/2021003 and 05000499/2021003 ML21260A0222021-09-22022 September 2021 STP Inspection Report 2021 FOF (IP92707) IR 05000498/20213012021-09-15015 September 2021 NRC Examination Report 05000498/2021301; 05000499/2021301 IR 05000498/20214022021-08-16016 August 2021 Security Baseline Inspection Report 05000498/2021402 and 05000499/2021402 IR 05000498/20210022021-08-0404 August 2021 Integrated Inspection Report 05000498/2021002 and 05000499/2021002 IR 05000498/20210902021-05-24024 May 2021 Notice of Violation, NRC Inspection Report 05000498/2021090 and 05000499/2021090 IR 05000498/20210012021-05-0707 May 2021 Integrated Inspection Report 05000498/2021001 and 05000499/2021001 ML21104A3962021-04-15015 April 2021 Review of the Spring 2020 Steam Generator Tube Inspection Report IR 05000498/20200062021-03-0303 March 2021 Annual Assessment Letter (Report 05000498/2020006 and 05000499/2020006) IR 05000498/20200912021-02-23023 February 2021 EA-19-054, South Texas Project Electric Generating Station, Units 1 and 2, Notice of Violation, NRC Inspection Report 05000498/2020091; 05000499/2020091 and NRC Investigation Report 4-2017-034 IR 05000498/20214012021-02-23023 February 2021 Security Baseline Inspection Report 05000498/2021401 and 05000499/2021401 IR 05000498/20200032021-02-17017 February 2021 STP2020003-RP-GK (Revised 2), Reissued Integrated Inspection Report 5000498/2020003 and 05000499/2020003 2024-08-09
[Table view] Category:Letter
MONTHYEARML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance NOC-AE-240040, Nuclear Liability Certificates of Insurance2024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) 2024-09-30
[Table view] |
Text
ber 11, 2002
SUBJECT:
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NRC INSPECTION REPORT 50-498/02-08; 50-499/02-08
Dear Mr. Cottle:
On September 21, 2002, the NRC completed an inspection at your South Texas Project Electric Generating Station, Units 1 and 2, facility. The enclosed report documents the inspection findings which were discussed on September 26, 2002, with Mr. J. Sheppard and other members of your staff.
This inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your licenses. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel. This inspection was the second in a series of three inspections to cover steam generator replacement activities at the South Texas Project, Unit 2. This inspection covered design and planning activities in support of steam generator replacement.
Based on the results of this inspection no finding of significance was identified.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, its enclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
William D. Johnson, Chief Project Branch A Division of Reactor Projects
STP Nuclear Operating Company -2-Dockets: 50-498 50-499 Licenses: NPF-76 NPF-80
Enclosure:
NRC Inspection Report 50-498/02-08; 50-499/02-08
REGION IV==
Dockets: 50-498 50-499 Licenses: NPF-76 NPF-80 Report No: 50-498/02-08; 50-499/02-08 Licensee: STP Nuclear Operating Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: FM 521 - 8 miles west of Wadsworth Wadsworth, Texas 77483 Dates: June 16 - September 21, 2002 Inspectors: N. F. OKeefe, Senior Resident Inspector G. L. Guerra, Resident Inspector R. P. Mullikin, Senior Reactor Inspector, Engineering and Maintenance Branch, Division of Reactor Safety J. L. Taylor, Reactor Inspector, Engineering and Maintenance Branch J. B. Nicholas, Ph.D., Senior Health Physicist, Plant Support Branch Division of Reactor Safety Approved By: W. D. Johnson, Chief, Project Branch A, Division of Reactor Projects Attachment: Supplemental Information
SUMMARY OF FINDINGS South Texas Project Electric Generating Station NRC Inspection Report 50-498/02-08; 50-499/02-08 IR 05000498-02-08; IR 05000499-02-08; on 06/16-09/21/2002; South Texas Project Nuclear Operating Company; South Texas Project Electric Generating Station, Unit 2. Integrated Resident & Regional Report of Steam Generator Replacement Activities.
This inspection was conducted by resident, regional health physics, and regional engineering inspectors. This inspection was the second in a series of three inspections to cover steam generator replacement activities at the South Texas Project in accordance with the approved inspection plan. This inspection covered design and planning activities by the licensee. No findings of significance were identified. Unit 1 was included in this inspection to the extent of inspecting representative examples of licensee activities common to both units.
Report Details Plant Status Unit 1 operated at full power throughout the inspection period.
Unit 2 began the inspection period at approximately 7 percent power restarting from a manual plant trip on June 14, 2002. Full power was achieved on June 20. On July 7, the unit automatically tripped on high steam generator level. The unit was restarted on July 9, and achieved full power the next day. The unit operated at full power for the remainder of the inspection period.
1. REACTOR SAFETY Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity 1R17 Evaluation of Permanent Plant Modifications for Steam Generator Replacement a. Inspection Scope (71111.17, 50001)
The inspectors reviewed five permanent plant modification packages and associated documentation, such as safety evaluations associated with the replacement of the Units 1 and 2 steam generators, to verify that they were performed in accordance with regulatory requirements and plant procedures. The inspectors also reviewed procedures governing plant modifications to evaluate the effectiveness of the programs for implementing modifications to risk-significant systems, structures, and components, such that these changes did not adversely affect the design and licensing basis of the facility. Permanent plant modifications and procedures reviewed are listed in the attachment to this report.
The inspectors interviewed the cognizant engineers for selected modifications as to their understanding of the modification packages.
b. Findings No findings of significance were identified.
2. RADIATION SAFETY Cornerstone: Occupational Radiation Safety 2OS2 ALARA Planning and Controls a. Inspection Scope (71121.02, 50001)
The inspector interviewed radiation workers and radiation protection personnel throughout the radiologically controlled area to determine their knowledge of as low as is reasonably achievable (ALARA) practices and conducted independent radiation surveys of selected work areas. The following radiation protection program controls, planning, and preparation items were reviewed to determine whether the licensee had an adequate program to maintain occupational exposure as low as is reasonably achievable during the upcoming Unit 2 Steam Generator Replacement Outage, 2RE09:
-2-
- Radiation protection department self-assessments (external exposure control, performed October 3 through November 8, 2001, and ALARA planning/radiation protection/generation support, performed May 20-23, 2002)
- Radiation Protection Quality Monitoring Reports (MN-02-0-0451 and MN-02-0-0477)
- Health Physics Observation Reports (HP-02-2-0086, HP-02-0-0188, HP-02-1-0218, HP-02-2-0235, HP-02-2-0228, HP-02-2-0309, HP-02-1-0322, HP-02-2-0400, HP-02-0-0407, HP-02-2-0453, HP-02-2-0455, and HP-02-2-0481)
remove/reinstall/modify upper and lower lateral restraints)
- Processes used to estimate and track personnel exposures
- Plant collective exposure history for the past 3 years, current exposure trends, and 3-year rolling average dose information
- Use of engineering controls to achieve dose reductions, including six temporary shielding request packages planned for installation during 2RE09
- Contamination control processes proposed for 2RE09
- Emergency contingency planning proposed for radiological work activity packages to be conducted during 2RE09
- Staffing and training plans for radiation protection coverage during 2RE09
- Prejob briefings, job site inspection, and ALARA controls involved with the preparation and transfer of a high integrity container from the Unit 1 truck bay to the radwaste storage yard prior to shipment offsite for disposal
- A summary of ALARA related condition reports written between February 1 and July 12, 2002, with eighteen reviewed in detail (02-1550, 02-2647, 02-2659, 02-2715, 02-2763, 02-3753, 02-4190, 02-4191, 02-4729, 02-5392, 02-5394, 02-5706, 02-7036, 02-7923, 02-8370, 02-8507, 02-9206, and 02-9582).
b. Findings No findings of significance were identified.
-3-4. OTHER ACTIVITIES (OA)
4OA5 Steam Generator Replacement Activities
.1 Outage Planning and Controls a. Inspection Scope (50001)
The inspectors inspected the licensees activities associated with planning for the steam generator replacement in Unit 2 using the guidance provided in NRC Inspection Procedure 50001, Steam Generator Replacement. The inspectors observed the licensee and its contractors increase staffing levels to the planned staffing requirements that had been outlined for the outage. The inspectors evaluated project planning and status with regard to the observed activities of replacement steam generator preparation for installation and the construction of the containment outside lift system. The inspectors reviewed the licensees readiness review package and attended portions of the readiness review meetings. The inspectors discussed actions to avoid adverse impacts on the operating unit during steam generator replacement activities and special processes for problem identification and resolution progress with licensee personnel.
b. Findings No findings of significance were identified.
.2 Security Considerations a. Inspection Scope (50001)
The inspectors reviewed and discussed with plant protection personnel the licensees plan for access/authorization and badging to accommodate the large numbers of temporary outage workers needed for the outage. This plan was assessed using the guidance provided in NRC Inspection Procedure 50001, Steam Generator Replacement.
b. Findings No findings of significance were identified.
4OA6 Meetings, including Exit On July 18, 2002, the inspectors presented the results of the ALARA planning and controls inspection to Mr. J. Sheppard, Vice President and Assistant to President/CEO, and other members of licensee management.
On August 15, 2002, the inspectors presented the results of the permanent plant modifications inspection to Mr. J. Sheppard and other members of licensee management.
-4-On September 26, 2002, the inspectors presented the results of the resident inspection to Mr. J. Sheppard and other members of licensee management.
The inspectors asked the licensee representatives whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
ATTACHMENT Supplemental Information PARTIAL LIST OF PERSONS CONTACTED Licensee R. Aguilera, Supervisor, Radiation Protection S. Blossom, Assistant Installation Manager T. Bowman, Manager, Unit 1, Operations B. Bullard, Supervisor, Radiation Protection R. Gangluff, Manager, Chemistry E. Halpin, Plant Manager S. Head, Manager, Licensing C. Johnson, Director, Oversight T. Jordan, Vice President, Engineering and Technical Services M. Kanavos, Manager, Plant Modifications R. Kerr, Staff Engineer, Quality Assurance J. LeValley, Area Project Manager R. Lovell, Manager, Training M. Ludwig, Quality Auditor M. McBurnette, Director, Quality and Licensee F. Mangan, Vice President, Business Services M. Meier, Manager, Human Resources/Information Technology A. Moldenhauer, Engineer, Probabilistic Risk Analysis J. Meyers, Senior Health Physics Specialist W. Mookhoek, Senior Licensing Specialist M. Oswald, Supervising Engineer, Design Engineering G. Parkey, Vice President, Generation R. Piggott, Senior Licensing Specialist J. Price, Supervisor, Design Engineering K. Richards, Installation/Return to Service Manager J. Sheppard, Vice President & Assistant to the President/CEO J. Simmons, Health Physics Steam Generator Replacement Project Manager C. Stone, Supervisor, Radiation Protection D. Towler, Manager, Generation Quality Licensee Contractor J. Atwell - Project Manager - Bechtel S. Pearson - Site Manager - Bechtel
-2-DOCUMENTS REVIEWED The following documents were selected and reviewed by the inspectors to accomplish the objectives and scope of the inspection and to support any findings:
DESIGN CHANGE PACKAGES NUMBER DESCRIPTION DCP 98-00243-15 Change Tave (Unit 1)
DCP 98-19443-7 Reactor upper Head T-Cold Conversion (Unit 2)
DCP 98-19447-1 Steam Generator Replacement - SG Level Trip Setpoint Changes (Unit 2)
DCP 98-19447-8 SGRP EOP Setpoint Changes (Unit 2)
DCP 99-15476-3 Isolate Steam Generator Blowdown on a Reactor Trip (Unit 2)
PROCEDURES 0PGP04-ZE-0309 Design Change Package, Revision 10 0PGP03-ZR-0050 Radiation Protection Program, Revision 5 0PGP03-ZR-0052 ALARA Program, Revision 4 0PRP07-ZR-0001 ALARA Engineering and Procedure Review, Revision 3 0PRP07-ZR-0004 Temporary Shielding, Revision 6 0PRP07-ZR-0009 Performance of High Exposure Work, Revision 18 0PRP07-ZR-0010 Radiation Work Permits, Revision 8 0PRP07-ZR-0011 Radiological Work ALARA Reviews, Revision 4