Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000293/LER-2016-0019 June 2016Both Emergency Diesel Generators Inoperable
LER 16-001-00 for Pilgrim Nuclear Power Station Regarding Both Emergency Diesel Generators Inoperable
Safe Shutdown
Abnormal operational transient
Pressure boundary leak
05000293/LER-2016-00220 June 2016Online Maintenance Test Configuration Prohibited By Technical Specifications
LER 16-002-00 for Pilgrim Nuclear Power Station Regarding Online Maintenance Test Configuration Prohibited By Technical Specifications
Safe Shutdown
Abnormal operational transient
05000293/LER-2016-00311 July 2016Spent Fuel Storage Design Feature Exceeded
LER 16-003-00 for Pilgrim Nuclear Power Station Regarding Spent Fuel Storage Design Feature Exceeded
Unanalyzed Condition
05000293/LER-2016-00411 July 2016Salt Service Water Pump B Past Operability - Operation or Condition Prohibited by Technical Specifications
LER 16-004-00 for Pilgrim Nuclear Power Station Regarding Salt Service Water Pump B Past Operability - Operation or Condition Prohibited by Technical Specifications
Past operability
05000293/LER-2016-0074 November 2016Manual Reactor Scram Due To Feedwater Regulating Valve Malfunction
LER 16-007-00 for Pilgrim Nuclear Power Station Regarding Manual Reactor Scram Due To Feedwater Regulating Valve Malfunction
Reactor Vessel Water Level
Packing leak
Power change
05000293/LER-2016-0089 December 2016Emergency Diesel Generator 'A' Past Inoperability
LER 16-008-00 for Pilgrim Nuclear Power Station Regarding Emergency Diesel Generator 'A' Past Inoperability
Safe Shutdown
Time of Discovery
Mission time
Abnormal operational transient
05000293/LER-2016-01014 June 2017MSIV Inoperability Led to a Condition Prohibited by the Plant s Technical Specifications
LER 16-010-01 for Pilgrim Nuclear Power Station re MSIV Inoperability
Packing leak
05000293/LER-2017-00117 July 2017Reactor Building Isolation Dampers Failed to Isolate
LER 17-001-01 for Pilgrim Nuclear Power Station Regarding Reactor Building Isolation Dampers Failed to Isolate
05000293/LER-2017-00225 May 2017Isolation of HPCI
LER 17-002-00 for Pilgrim Regarding Isolation of HPCI
05000293/LER-2017-00325 May 2017Supplement to Suppression Pool Declared Inoperable Due to High Water Level
LER 17-003-00 for Pilgrim Nuclear Power Station Regarding Pressure Suppression Pool Declared Inoperable Due to High Water Level
Time of Discovery
05000293/LER-2017-0042 June 2017Secondary Containment Testing Led to Loss of Safety Function to Both Trains of Standby Gas Treatment System
LER 17-004-00 for Pilgrim Nuclear Power Station Regarding Secondary Containment Testing Led to Loss of Safety Function to Both Trains of Standby Gas Treatment System
Mission time
05000293/LER-2017-0057 June 201710 CFR 50, Appendix J, Option B, Leak Rate Criteria Exceeded
LER 17-005-00 for Pilgrim Regarding 10 CFR 50, Appendix J, Option B, Leak Rate Criteria Exceeded
Fuel cladding
05000293/LER-2017-00613 June 2017Source Range Monitor Inoperable During Fuel Movement
LER 17-006-00 for Pilgrim Nuclear Power Station Regarding Source Range Monitor Inoperable During Fuel Movement
05000293/LER-2017-00722 June 2017Supplement to Potential Inoperability of Safety Relief Valve 3A
LER 17-007-00 for Pilgrim Regarding Potential Inoperability of Safety Relief Valve 3A
05000293/LER-2017-00830 June 2017Supplement to 480V Bus B6 Auto Transfer Function Degraded Due to Time Delay Relay Failure
LER 17-008-00 for Pilgrim re 480V Bus B6 Auto Transfer Function Degraded Due to Time Delay Relay Failure
05000293/LER-2017-00917 July 2017Supplement to Potential Primary Containment System Inoperability Due to Relay Concerns
LER 17-009-00 for Pilgrim Nuclear Power Station Regarding Potential Primary Containment System lnoperability Due to Relay Concerns
Fuel cladding
05000293/LER-2017-0107 August 2017Air Accumulation Creates Small Void in Core Spray Discharge Piping
LER 17-010-00 for Pilgrim re Air Accumulation Creates Small Void in Core Spray Discharge Piping
Time of Discovery
05000293/LER-2017-01115 August 2017Simultaneously Opened Reactor Building Airlock Doors Caused Loss of Secondary Containment
LER 17-011-00 for Pilgrim Nuclear Power Station Regarding Simultaneously Opened Reactor Building Airlock Doors Caused Loss of Secondary Containment
Recently irradiated fuel
05000293/LER-2017-01213 November 2017Start-Up Transformer Degraded Voltage Relay Found Outside Technical Specification Limit
LER 17-012-00 for Pilgrim Nuclear Power Station Regarding Start-Up Transformer Degraded Voltage Relay Found Outside Technical Specification Limit
05000293/LER-2017-01325 January 20181 OF 4
LER 17-013-00 for Pilgrim Nuclear Power Station Regarding Reportable Conditions Involving Standby Gas Treatment System and Secondary Containment lnoperability Not Reported During the Previous Three Years
Mission time
Recently irradiated fuel
AEP-NRC-2018-75, Registration of Dry Spent Fuel Storage Cask22 October 2018Registration of Dry Spent Fuel Storage Cask
AEP-NRC-2018-79, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask15 November 2018Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask
AEP-NRC-2021-49, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask10 August 2021Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask
AEP-NRC-2021-53, Registration of Dry Spent Fuel Storage Cask26 August 2021Registration of Dry Spent Fuel Storage Cask
AEP-NRC-2021-55, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask20 September 2021Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask
AEP-NRC-2021-60, Registration of Dry Spent Fuel Storage Cask12 October 2021Registration of Dry Spent Fuel Storage Cask
AEP-NRC-2021-65, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask8 November 2021Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask
BVY 02-078, Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21)9 October 2002Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21)
BVY 03-016, Entergy Nuclear Northeast - Proof of Financial Protection (10 CFR 140.15) & Guarantee of Payment of Deferred Premiums (10 CFR 140.21) for Pilgrim Station, Indian Point Units 2 & 3, James A. Fitzpatrick Nuclear Power Plant & Vermont Yankee26 March 2003Entergy Nuclear Northeast - Proof of Financial Protection (10 CFR 140.15) & Guarantee of Payment of Deferred Premiums (10 CFR 140.21) for Pilgrim Station, Indian Point Units 2 & 3, James A. Fitzpatrick Nuclear Power Plant & Vermont Yankee S
BVY 03-026, Sources and Levels of Insurance Required by 10 CFR 50.54(w)28 March 2003Sources and Levels of Insurance Required by 10 CFR 50.54(w)
BVY 03-044, 2002 Annual Report, and Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants28 May 20032002 Annual Report, and Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants
BVY 03-069, Fitness-for-Duty Program Performance Report for Period January - June 200318 August 2003Fitness-for-Duty Program Performance Report for Period January - June 2003Fitness for Duty
Stolen
BVY 04-018, Fitness-for-Duty Program Performance Report for the Period of July - December 200323 February 2004Fitness-for-Duty Program Performance Report for the Period of July - December 2003Fitness for Duty
BVY 04-022, Response to RAI on Relief Requests to Use ASME Code Case N-6004 March 2004Response to RAI on Relief Requests to Use ASME Code Case N-600
BVY 04-027, Response to RAI on Relief Requests to Use ASME Code Case N-600, Supplement 118 March 2004Response to RAI on Relief Requests to Use ASME Code Case N-600, Supplement 1
BVY 04-028, Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21)25 March 2004Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21)
BVY 04-033, Sources and Levels of Insurance Required by 10 CFR 50.54(w)29 March 2004Sources and Levels of Insurance Required by 10 CFR 50.54(w)
BVY 04-034, Entergy Nuclear Operations, Inc. Service List Update31 March 2004Entergy Nuclear Operations, Inc. Service List Update
BVY 04-078, Application for Technical Specifications Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement Process1 September 2004Application for Technical Specifications Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement ProcessHigh Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Incorporated by reference
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent
BVY 04-087, Indian Point Nuclear Generating Units 1, 2, and 3, James A. FitzPatrick Nuclear Power Plant, Proof of Financial Protection (10 CFR 140.15)9 September 2004Indian Point Nuclear Generating Units 1, 2, and 3, James A. FitzPatrick Nuclear Power Plant, Proof of Financial Protection (10 CFR 140.15)
BVY 04-088, Fitness-for-Duty Program Performance Report for the Period January - June 200430 August 2004Fitness-for-Duty Program Performance Report for the Period January - June 2004Fitness for Duty
BVY 04-136, Use of Encryption Software for Electronic Transmission of Safeguards Information17 December 2004Use of Encryption Software for Electronic Transmission of Safeguards Information
BVY 05-008, Response to the Transmittal of Revision 1 Significance Determination Process Risk-Informed Inspection Notebook & Information for Next Revision28 January 2005Response to the Transmittal of Revision 1 Significance Determination Process Risk-Informed Inspection Notebook & Information for Next RevisionSignificance Determination Process
BVY 05-018, Fitness-for-Duty Program Performance Report for the Period July - December 200428 February 2005Fitness-for-Duty Program Performance Report for the Period July - December 2004Fitness for Duty
BVY 05-021, Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21)23 March 2005Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21)
BVY 05-031, Sources and Levels of Insurance Required by 10 CFR 50.54(w) for James A. FitzPatrick, Indian Point 1, Indian Point 2, Indian Point 3, Pilgrim and Vermont Yankee Nuclear Power Plants30 March 2005Sources and Levels of Insurance Required by 10 CFR 50.54(w) for James A. FitzPatrick, Indian Point 1, Indian Point 2, Indian Point 3, Pilgrim and Vermont Yankee Nuclear Power Plants
BVY 05-057, 2004 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal25 May 20052004 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal
BVY 05-063, Entergy Nuclear Operations Inc, Service List Update1 July 2005Entergy Nuclear Operations Inc, Service List Update
BVY 05-078, Fitness-for-Duty Program Performance Report for the Period January - June 200529 August 2005Fitness-for-Duty Program Performance Report for the Period January - June 2005Fitness for Duty
BVY 05-089, Entergy Nuclear Northeast - Proof of Financial Protection28 September 2005Entergy Nuclear Northeast - Proof of Financial Protection