Issue date | Title | Topic | |
---|---|---|---|
05000293/LER-2016-001 | 9 June 2016 | Both Emergency Diesel Generators Inoperable LER 16-001-00 for Pilgrim Nuclear Power Station Regarding Both Emergency Diesel Generators Inoperable | Safe Shutdown Abnormal operational transient Pressure boundary leak |
05000293/LER-2016-002 | 20 June 2016 | Online Maintenance Test Configuration Prohibited By Technical Specifications LER 16-002-00 for Pilgrim Nuclear Power Station Regarding Online Maintenance Test Configuration Prohibited By Technical Specifications | Safe Shutdown Abnormal operational transient |
05000293/LER-2016-003 | 11 July 2016 | Spent Fuel Storage Design Feature Exceeded LER 16-003-00 for Pilgrim Nuclear Power Station Regarding Spent Fuel Storage Design Feature Exceeded | Unanalyzed Condition |
05000293/LER-2016-004 | 11 July 2016 | Salt Service Water Pump B Past Operability - Operation or Condition Prohibited by Technical Specifications LER 16-004-00 for Pilgrim Nuclear Power Station Regarding Salt Service Water Pump B Past Operability - Operation or Condition Prohibited by Technical Specifications | Past operability |
05000293/LER-2016-007 | 4 November 2016 | Manual Reactor Scram Due To Feedwater Regulating Valve Malfunction LER 16-007-00 for Pilgrim Nuclear Power Station Regarding Manual Reactor Scram Due To Feedwater Regulating Valve Malfunction | Reactor Vessel Water Level Packing leak Power change |
05000293/LER-2016-008 | 9 December 2016 | Emergency Diesel Generator 'A' Past Inoperability LER 16-008-00 for Pilgrim Nuclear Power Station Regarding Emergency Diesel Generator 'A' Past Inoperability | Safe Shutdown Time of Discovery Mission time Abnormal operational transient |
05000293/LER-2016-010 | 14 June 2017 | MSIV Inoperability Led to a Condition Prohibited by the Plant s Technical Specifications LER 16-010-01 for Pilgrim Nuclear Power Station re MSIV Inoperability | Packing leak |
05000293/LER-2017-001 | 17 July 2017 | Reactor Building Isolation Dampers Failed to Isolate LER 17-001-01 for Pilgrim Nuclear Power Station Regarding Reactor Building Isolation Dampers Failed to Isolate | |
05000293/LER-2017-002 | 25 May 2017 | Isolation of HPCI LER 17-002-00 for Pilgrim Regarding Isolation of HPCI | |
05000293/LER-2017-003 | 25 May 2017 | Supplement to Suppression Pool Declared Inoperable Due to High Water Level LER 17-003-00 for Pilgrim Nuclear Power Station Regarding Pressure Suppression Pool Declared Inoperable Due to High Water Level | Time of Discovery |
05000293/LER-2017-004 | 2 June 2017 | Secondary Containment Testing Led to Loss of Safety Function to Both Trains of Standby Gas Treatment System LER 17-004-00 for Pilgrim Nuclear Power Station Regarding Secondary Containment Testing Led to Loss of Safety Function to Both Trains of Standby Gas Treatment System | Mission time |
05000293/LER-2017-005 | 7 June 2017 | 10 CFR 50, Appendix J, Option B, Leak Rate Criteria Exceeded LER 17-005-00 for Pilgrim Regarding 10 CFR 50, Appendix J, Option B, Leak Rate Criteria Exceeded | Fuel cladding |
05000293/LER-2017-006 | 13 June 2017 | Source Range Monitor Inoperable During Fuel Movement LER 17-006-00 for Pilgrim Nuclear Power Station Regarding Source Range Monitor Inoperable During Fuel Movement | |
05000293/LER-2017-007 | 22 June 2017 | Supplement to Potential Inoperability of Safety Relief Valve 3A LER 17-007-00 for Pilgrim Regarding Potential Inoperability of Safety Relief Valve 3A | |
05000293/LER-2017-008 | 30 June 2017 | Supplement to 480V Bus B6 Auto Transfer Function Degraded Due to Time Delay Relay Failure LER 17-008-00 for Pilgrim re 480V Bus B6 Auto Transfer Function Degraded Due to Time Delay Relay Failure | |
05000293/LER-2017-009 | 17 July 2017 | Supplement to Potential Primary Containment System Inoperability Due to Relay Concerns LER 17-009-00 for Pilgrim Nuclear Power Station Regarding Potential Primary Containment System lnoperability Due to Relay Concerns | Fuel cladding |
05000293/LER-2017-010 | 7 August 2017 | Air Accumulation Creates Small Void in Core Spray Discharge Piping LER 17-010-00 for Pilgrim re Air Accumulation Creates Small Void in Core Spray Discharge Piping | Time of Discovery |
05000293/LER-2017-011 | 15 August 2017 | Simultaneously Opened Reactor Building Airlock Doors Caused Loss of Secondary Containment LER 17-011-00 for Pilgrim Nuclear Power Station Regarding Simultaneously Opened Reactor Building Airlock Doors Caused Loss of Secondary Containment | Recently irradiated fuel |
05000293/LER-2017-012 | 13 November 2017 | Start-Up Transformer Degraded Voltage Relay Found Outside Technical Specification Limit LER 17-012-00 for Pilgrim Nuclear Power Station Regarding Start-Up Transformer Degraded Voltage Relay Found Outside Technical Specification Limit | |
05000293/LER-2017-013 | 25 January 2018 | 1 OF 4 LER 17-013-00 for Pilgrim Nuclear Power Station Regarding Reportable Conditions Involving Standby Gas Treatment System and Secondary Containment lnoperability Not Reported During the Previous Three Years | Mission time Recently irradiated fuel |
AEP-NRC-2018-75, Registration of Dry Spent Fuel Storage Cask | 22 October 2018 | Registration of Dry Spent Fuel Storage Cask | |
AEP-NRC-2018-79, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask | 15 November 2018 | Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask | |
AEP-NRC-2021-49, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask | 10 August 2021 | Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask | |
AEP-NRC-2021-53, Registration of Dry Spent Fuel Storage Cask | 26 August 2021 | Registration of Dry Spent Fuel Storage Cask | |
AEP-NRC-2021-55, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask | 20 September 2021 | Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask | |
AEP-NRC-2021-60, Registration of Dry Spent Fuel Storage Cask | 12 October 2021 | Registration of Dry Spent Fuel Storage Cask | |
AEP-NRC-2021-65, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask | 8 November 2021 | Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask | |
BVY 02-078, Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21) | 9 October 2002 | Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21) | |
BVY 03-016, Entergy Nuclear Northeast - Proof of Financial Protection (10 CFR 140.15) & Guarantee of Payment of Deferred Premiums (10 CFR 140.21) for Pilgrim Station, Indian Point Units 2 & 3, James A. Fitzpatrick Nuclear Power Plant & Vermont Yankee | 26 March 2003 | Entergy Nuclear Northeast - Proof of Financial Protection (10 CFR 140.15) & Guarantee of Payment of Deferred Premiums (10 CFR 140.21) for Pilgrim Station, Indian Point Units 2 & 3, James A. Fitzpatrick Nuclear Power Plant & Vermont Yankee S | |
BVY 03-026, Sources and Levels of Insurance Required by 10 CFR 50.54(w) | 28 March 2003 | Sources and Levels of Insurance Required by 10 CFR 50.54(w) | |
BVY 03-044, 2002 Annual Report, and Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants | 28 May 2003 | 2002 Annual Report, and Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants | |
BVY 03-069, Fitness-for-Duty Program Performance Report for Period January - June 2003 | 18 August 2003 | Fitness-for-Duty Program Performance Report for Period January - June 2003 | Fitness for Duty Stolen |
BVY 04-018, Fitness-for-Duty Program Performance Report for the Period of July - December 2003 | 23 February 2004 | Fitness-for-Duty Program Performance Report for the Period of July - December 2003 | Fitness for Duty |
BVY 04-022, Response to RAI on Relief Requests to Use ASME Code Case N-600 | 4 March 2004 | Response to RAI on Relief Requests to Use ASME Code Case N-600 | |
BVY 04-027, Response to RAI on Relief Requests to Use ASME Code Case N-600, Supplement 1 | 18 March 2004 | Response to RAI on Relief Requests to Use ASME Code Case N-600, Supplement 1 | |
BVY 04-028, Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21) | 25 March 2004 | Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21) | |
BVY 04-033, Sources and Levels of Insurance Required by 10 CFR 50.54(w) | 29 March 2004 | Sources and Levels of Insurance Required by 10 CFR 50.54(w) | |
BVY 04-034, Entergy Nuclear Operations, Inc. Service List Update | 31 March 2004 | Entergy Nuclear Operations, Inc. Service List Update | |
BVY 04-078, Application for Technical Specifications Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement Process | 1 September 2004 | Application for Technical Specifications Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement Process | High Radiation Area Offsite Dose Calculation Manual Post Accident Monitoring Incorporated by reference Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent |
BVY 04-087, Indian Point Nuclear Generating Units 1, 2, and 3, James A. FitzPatrick Nuclear Power Plant, Proof of Financial Protection (10 CFR 140.15) | 9 September 2004 | Indian Point Nuclear Generating Units 1, 2, and 3, James A. FitzPatrick Nuclear Power Plant, Proof of Financial Protection (10 CFR 140.15) | |
BVY 04-088, Fitness-for-Duty Program Performance Report for the Period January - June 2004 | 30 August 2004 | Fitness-for-Duty Program Performance Report for the Period January - June 2004 | Fitness for Duty |
BVY 04-136, Use of Encryption Software for Electronic Transmission of Safeguards Information | 17 December 2004 | Use of Encryption Software for Electronic Transmission of Safeguards Information | |
BVY 05-008, Response to the Transmittal of Revision 1 Significance Determination Process Risk-Informed Inspection Notebook & Information for Next Revision | 28 January 2005 | Response to the Transmittal of Revision 1 Significance Determination Process Risk-Informed Inspection Notebook & Information for Next Revision | Significance Determination Process |
BVY 05-018, Fitness-for-Duty Program Performance Report for the Period July - December 2004 | 28 February 2005 | Fitness-for-Duty Program Performance Report for the Period July - December 2004 | Fitness for Duty |
BVY 05-021, Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21) | 23 March 2005 | Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21) | |
BVY 05-031, Sources and Levels of Insurance Required by 10 CFR 50.54(w) for James A. FitzPatrick, Indian Point 1, Indian Point 2, Indian Point 3, Pilgrim and Vermont Yankee Nuclear Power Plants | 30 March 2005 | Sources and Levels of Insurance Required by 10 CFR 50.54(w) for James A. FitzPatrick, Indian Point 1, Indian Point 2, Indian Point 3, Pilgrim and Vermont Yankee Nuclear Power Plants | |
BVY 05-057, 2004 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal | 25 May 2005 | 2004 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal | |
BVY 05-063, Entergy Nuclear Operations Inc, Service List Update | 1 July 2005 | Entergy Nuclear Operations Inc, Service List Update | |
BVY 05-078, Fitness-for-Duty Program Performance Report for the Period January - June 2005 | 29 August 2005 | Fitness-for-Duty Program Performance Report for the Period January - June 2005 | Fitness for Duty |
BVY 05-089, Entergy Nuclear Northeast - Proof of Financial Protection | 28 September 2005 | Entergy Nuclear Northeast - Proof of Financial Protection |